Backend Report: - Application/Reports/Dtos/DashboardStatsDto: 5 KPI + PhaseCount + SupplierCount + ProjectCount + MonthlyValue - Application/Reports/Queries/GetDashboardStats handler: total/active/overdue/published this month/totalValueActive + byPhase + top 5 NCC/du an + 12 thang monthly (fill zero khi thang empty) - Application/Reports/Services/IContractExcelExporter interface - Infrastructure/Reports/ContractExcelExporter: ClosedXML workbook 10 cot, header style bold+blue, number format #,##0, formula SUM, auto-fit, freeze header - Application/Reports/Commands/ExportContractsToExcelCommand: filter phase/supplier/project/date range - Api/Controllers/ReportsController: GET /reports/dashboard, GET /reports/contracts/export - DI register IContractExcelExporter (Scoped) Frontend fe-admin: - types/reports.ts: DashboardStats type - components/BarChart.tsx: generic horizontal bar chart — chi Tailwind, khong thu vien ngoai - pages/DashboardPage.tsx REWRITE: 5 KPI card (FileText/TrendingUp/AlertTriangle/CheckCircle2/Coins) + by-phase bar + monthly 12-month chart + top 5 NCC + top 5 du an + skeleton loader - pages/ReportsPage.tsx MOI: filter phase/fromDate/toDate → export Excel button - Route /reports vao App.tsx E2E verified: - GET /api/reports/dashboard → 200 voi day du KPI + monthly fill 12 thang - GET /api/reports/contracts/export → 200 xlsx 7229 bytes (Microsoft Excel 2007+) Docs consolidation (theo yeu cau user): - docs/rules.md MOI: 9 section coding conventions (ngon ngu UI/code/DB/docs, BE Clean Arch, CQRS+MediatR, Validation FluentValidation, Error handling, Async, Entity rules, DI, Package pinning, FE React/TS erasableSyntaxOnly, path alias, TanStack Query, Permission guard, Toast+error, DB convention, Git commit format, Docs structure, Testing, Security) - docs/architecture.md MOI: layered overview ASCII art, request lifecycle (1 POST/api/contracts qua 10 step), workflow state machine 9 phase, permission model, data flow sequence diagram 4 actor (Drafter/Manager/CCM/BOD/HRA), deployment architecture Phase 5, skill library, non-functional table - docs/database/schema-diagram.md MOI: full ERD 19 table mermaid + data flow diagram + vong doi 1 HD (create → 7 transition → gen ma → publish) + index strategy table + relationship cardinality + soft delete behavior + SQL queries (inbox/dashboard/gen ma) + migration history - docs/gotchas.md UPDATE: 17 → 26 pitfalls, them section "Claude Code harness quirks" (Edit File not read, DI build pass nhung runtime fail) + "Contract workflow" (ma HD gen 2 lan, BE-FE NEXT_PHASES sync, race condition) + "Permission matrix" (cache real-time, MenuKey typo) - docs/STATUS.md: Phase 4 MVP done, docs entry points section liet ke het, next Phase 5 Production - docs/HANDOFF.md: phase table them Phase 4 row, file tree update voi Reports, test points day du, git state commit 7 - docs/changelog/migration-todos.md: tick Phase 4 MVP items + them iteration 2 list - docs/changelog/sessions/2026-04-21-1430-phase4-report.md: session log voi thong so cumulative (BE 3100 LOC, 30 docs) - CLAUDE.md root: update Tai lieu quan trong section them rules.md, architecture.md, schema-diagram.md, .claude/skills (13 links now) Bug fix: - TS unused import ContractPhaseLabel trong DashboardPage - DI thieu register IContractExcelExporter — build pass but runtime would fail (added) Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
8.9 KiB
HANDOFF — Brief 5 phút cho session tiếp theo
Last updated: 2026-04-21 14:30 (cuối Phase 4 MVP + docs consolidation)
Ở đâu rồi?
| Phase | Trạng thái |
|---|---|
| 0 Draft | ✅ Done |
| 1 Alpha Core foundation | ✅ Done |
| 1 Alpha Core đợt 2 (CRUD + Permission) | ✅ Done |
| 2 Form Engine MVP | ✅ Done |
| 2 Form Engine iteration 2 | 📝 Optional |
| 3 Workflow MVP (9 phase + code gen) | ✅ Done |
| 3 Workflow iteration 2 (SLA job + notify + attachment) | 📝 Optional |
| 4 Report + Polish MVP (Dashboard + Excel) | ✅ Done |
| 4 Report iteration 2 (SLA report, PDF export) | 📝 Optional |
| 5 Production (CI/CD IIS) | 📋 Next |
Run nhanh
# Terminal 1 — API (auto seed 8 template lần đầu)
dotnet run --project src\Backend\SolutionErp.Api
# Terminal 2 — Admin FE
cd fe-admin && npm run dev # → http://localhost:8082
# Terminal 3 — User FE
cd fe-user && npm run dev # → http://localhost:8080
Login: admin@solutionerp.local / Admin@123456
Điểm cần test ngay (Phase 4 MVP):
- Admin
/dashboard→ 5 KPI card + By Phase bar + Monthly chart + Top NCC/dự án - Admin
/reports→ filter phase/date → Export Excel .xlsx 10 cột có formula SUM - fe-user
/contracts/new→ tạo HĐ draft (Phase 2 DangSoanThao, SLA +7d) - fe-user
/inbox→ xem HĐ chờ role mình xử lý /contracts/{id}→ click "Duyệt → tiếp" chạy state machine. Phase 8 genMaHopDongRG-001/forms→ render template .docx/system/permissions→ ma trận Role × MenuKey/master/suppliers|projects|departments→ CRUD
Cần làm kế tiếp (ưu tiên)
A. Phase 5 — Production (tuần 12-13, item lớn nhất còn lại)
Đọc trước: docs/changelog/migration-todos.md section Phase 5.
.gitea/workflows/deploy.ymlCI/CD build + deploy IISscripts/deploy-iis.ps1stop app pool → xcopy → start- Windows Server IIS + URL Rewrite + ARR (reverse proxy FE → .NET)
- HTTPS cert via win-acme hoặc mua
appsettings.Production.json+ user secrets + JWT secret rotation- Rate limiting middleware (auth endpoint 5 req/min/IP)
- Security audit OWASP top 10
- Health check endpoint
/health - Serilog → file rolling daily retention 30d
- SQL backup: daily full + 15min log
- Runbook: restart, rollback migration, restore backup
- UAT production 1 tuần với 2-3 user thật
- Go-live checklist
B. Polish iterations (optional — khi rảnh)
Phase 2 iter 2: convert 3 .doc qua Word COM DisplayAlerts=0 hoặc LibreOffice, field spec JSON + form builder FE dynamic, {{#loop}} block support, PDF convert, FE upload template multipart.
Phase 3 iter 2: SlaExpiryJob BackgroundService auto-approve, email (MailKit) + in-app (SignalR) notify, upload attachment endpoint + FE multipart (wwwroot/uploads/contracts/{id}/), RowVersion concurrency, render HĐ docx khi tạo (merge TemplateId + DraftData + ContractClause).
Phase 4 iter 2: SLA overdue report by role/phase, PDF HĐ export (LibreOffice), dashboard user-specific (role tôi).
C. Phase 2 iteration 2 (form engine polish)
- Convert 3 file
.docqua Word COMDisplayAlerts=0+ timeout, hoặc LibreOffice - Field spec JSON per template + dynamic form builder FE
{{#loop}}...{{/loop}}block support cho table lặp- PDF convert via LibreOffice headless
- Admin upload template UI (multipart)
D. Quick wins (không block phase)
- FE Users management + Roles CRUD (test permission với non-admin user thật)
- Filter Inbox theo phase FE
- Refresh token auto (FE axios interceptor retry 401)
Lưu ý kỹ thuật quan trọng
Đọc gotchas.md trước khi:
- Thêm package mới → check compat với .NET 10 (MediatR 14 fail → dùng 12)
- Debug 404 API → kiểm Program.cs có persist không (Dropbox issue)
- Expression tree error → tách switch ra ngoài LINQ
- TS enum error → dùng const-object pattern (
erasableSyntaxOnly) - Word COM stuck → kill + fallback LibreOffice
- Migration lỗi → check 3 file đầy đủ (Designer + Migration + Snapshot)
File đang active
SOLUTION_ERP/
├── src/Backend/ (Clean Arch, 4 project, .NET 10)
│ ├── SolutionErp.Domain/
│ │ ├── Common/ BaseEntity, AuditableEntity
│ │ ├── Contracts/ ContractType, ContractPhase, ApprovalDecision + **Contract, ContractApproval, ContractComment, ContractAttachment, ContractCodeSequence** ← Phase 3
│ │ ├── Forms/ ContractTemplate, ContractClause ← Phase 2
│ │ ├── Identity/ User, Role, MenuItem, Permission, AppRoles, MenuKeys
│ │ └── Master/ Supplier, Project, Department, SupplierType
│ ├── SolutionErp.Application/
│ │ ├── Auth/ Login, Refresh, Me
│ │ ├── Common/ Exceptions, Behaviors, Interfaces, Models
│ │ ├── Contracts/ ContractFeatures (8 CQRS), IContractWorkflowService, IContractCodeGenerator, DTOs ← Phase 3
│ │ ├── Forms/ FormFeatures (List/Get/Render) ← Phase 2
│ │ ├── Master/ Suppliers, Projects, Departments CQRS
│ │ ├── Permissions/ GetMyMenuTree, matrix upsert
│ │ └── Reports/ **DashboardStats, ExportContractsToExcel, IContractExcelExporter** ← Phase 4
│ ├── SolutionErp.Infrastructure/
│ │ ├── Forms/ DocxRenderer, XlsxRenderer, FormRenderer ← Phase 2
│ │ ├── Identity/ JwtSettings, JwtTokenService
│ │ ├── Persistence/ DbContext, DbInitializer, Interceptors, Migrations (**5**)
│ │ ├── Reports/ **ContractExcelExporter** ← Phase 4
│ │ └── Services/ DateTimeService, ContractWorkflowService, ContractCodeGenerator ← Phase 3
│ └── SolutionErp.Api/
│ ├── Authorization/ MenuPermissionHandler + Requirement
│ ├── Controllers/ Auth, Suppliers, Projects, Departments, Menus, Roles, Permissions, Forms, Contracts, **Reports** (10 controller)
│ ├── Middleware/ GlobalExceptionMiddleware
│ ├── Services/ CurrentUserService, WebHostEnvironmentLocator
│ └── wwwroot/templates/ 5 file .docx/.xlsx ← Phase 2
├── fe-admin/ (11 page)
│ └── src/pages/
│ ├── LoginPage
│ ├── DashboardPage ← Phase 4 rewrite (KPI cards + BarChart)
│ ├── master/SuppliersPage, ProjectsPage, DepartmentsPage
│ ├── system/PermissionsPage
│ ├── forms/FormsPage ← Phase 2
│ ├── contracts/ContractsListPage, ContractDetailPage ← Phase 3
│ └── ReportsPage ← Phase 4
├── fe-user/ (5 page)
│ └── src/pages/
│ ├── LoginPage
│ ├── InboxPage ← Phase 3
│ └── contracts/ContractCreatePage, ContractDetailPage, MyContractsPage ← Phase 3
├── docs/ (30 file)
│ ├── STATUS.md, HANDOFF.md, rules.md, architecture.md
│ ├── CLAUDE.md, PROJECT-MAP.md
│ ├── workflow-contract.md, forms-spec.md
│ ├── database/{database-guide, schema-diagram}.md
│ ├── flows/ (7 file — README + 6 flow)
│ ├── changelog/migration-todos.md + sessions/ (6 session log)
│ └── gotchas.md
└── .claude/skills/ (3 skill — all full spec)
Git state
(sẽ là commit 7) — Phase 4 Report MVP + docs consolidation
7e957a7 — Phase 3 Workflow MVP
5113e4c — Phase 2 Form Engine MVP
54d6c9b — Phase 1.2 CRUD + Permission
49a5f57 — Docs database-guide + flows
702411f — Phase 1 foundation
25dad7f — Phase 0 scaffold
Branch: main
Remote: chưa (Gitea URL chờ user — cần cho Phase 5)
Credentials + URLs
admin@solutionerp.local / Admin@123456
- API: http://localhost:5443 (swagger
/swagger) - Admin FE: http://localhost:8082
- User FE: http://localhost:8080
- SQL LocalDB:
(localdb)\MSSQLLocalDB/ Database=SolutionErp_Dev
Đánh giá nhanh
Tốt:
- Build pass 100% cả BE + FE
- E2E test full 9-phase workflow end-to-end — mã HĐ gen đúng format RG-001
- Docs đầy đủ: 26 file, session log mỗi chunk, gotchas tích lũy 17 pitfall
- Cả 2 FE đều có Contract detail page + timeline + comment thread + state machine action
Rủi ro còn:
- SLA chỉ set deadline — không có job auto-approve (Phase 3.2)
- Không có notification (email + in-app) — user phải F5 inbox
- Form render chỉ MVP — loop table + PDF chưa có
- Permission matrix chưa test thực với non-admin user
- 3 file .doc chưa convert (carryover Phase 2)
- Không có upload attachment endpoint (chỉ có entity + DTO)