Session S36-S39 end wrap (docs-only, CI skip per gotcha #41): - gotcha #54 (529 Overload spawn fail → em main solo fallback, S29×2+S37×1) - gotcha #55 (truncation mid-EXPLORATION extend #53 — heavy spec bloat trước write) - gotcha 53→55 + quick-ref item 29+30 - STATUS S39 header (Opus 4.8 1M + multi-agent 4→7 + budget +50%) - HANDOFF S39 (7-agent table + ⚠️ CLI restart required + S40 recommend) - Session log 2026-05-29 S36-S39 (Phase 10 COMPLETE 11/11 + infra upgrade) - .gitignore +tmp/ (sub-agent JSON dumps) Memory user-level +2 (separate, user-scope): - feedback_7agent_split_upgrade (4→7 BVAAU adapted decision) - feedback_skeleton_first_aggressive_finish (schema FULL + logic SKELETON pattern) Drift defer cron 2026-06-01: docs/CLAUDE.md count + schema-diagram §15+ + RAG re-ingest S37-S39. Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
5.3 KiB
5.3 KiB
Session S36-S39 — Phase 10 COMPLETE 11/11 + Opus 4.8 + Multi-agent 4→7
Date: 2026-05-28 → 2026-05-29 Scope: Phase 10.2-10.4 Plan G-O2..G-P1 + G-H3 (5 plan) + infra upgrade (model + 7-agent)
Cumulative result
Phase 10 = 11/11 Plan G- atomic 100% COMPLETE* (cumulative S33-S38, 6 session): ✅ G-H1 Hồ sơ NS (S33) · G-O1 Danh bạ (S34) · G-H2 Cấu hình HRM (S34+S35) · G-O2 Phòng họp (S36) · G-O3 Đề xuất (S37) · G-O4+G-O5+G-O6+G-P1+G-H3 SKELETON (S38)
Commits S36-S39 (8 total push remote):
| Commit | Session | Content | CI |
|---|---|---|---|
f45090b |
S36 | G-O2 Phòng họp Mig 36 + BE + FE 2 app | Run #359 PASS 3m55s |
75521b8+37593f9 |
S36 | docs wrap | skip |
de1c378 |
S37 | Mig 37 enum + G-O3 Đề xuất full-stack | Run #246 PASS 3m53s |
17aaba9 |
S37 | docs wrap | skip |
e54a22d |
S38 | G-O4/O5/O6/P1/H3 SKELETON mega | Run #247 PASS 3m25s |
49134f4 |
S38 | docs wrap Phase 10 COMPLETE | skip |
fd0554a |
S39 | Multi-agent 4→7 + model Opus 4.8 | skip (docs-only) |
S36 — G-O2 Phòng họp (Mig 36)
- Schema: 3 entity clean-room (MeetingRoom catalog + MeetingBooking header + MeetingBookingAttendee N-to-N join, NOT JSON per Investigator verdict) + MeetingBookingStatus 3-state
- BE: MeetingFeatures.cs 479 LOC 9 handler + SERIALIZABLE tx overlap check EXISTS + 2 Controller. Application.csproj +Relational package (em main fix gotcha #53 4th truncate Implementer)
- FE: custom HTML 7-day grid (NO FullCalendar dep, save ~80KB) + admin catalog CRUD, SHA256 IDENTICAL × 2 app
- Multi-agent: 🟦 Investigator pre-flight (clean-room verdict + FullCalendar v6 MIT alternative) · 🟨 Implementer BE+FE · 🟥 Reviewer Smart Friend 9× CLEAN (3 minor defer) · 🟩 CICD Run #359
S37 — G-O3 Đề xuất (Mig 37 enum + Mig 38)
- Mig 37: extend
ApprovalWorkflowApplicableType+5 (ProposalGeneral=4 / LeaveRequest=5 / OtRequest=6 / VehicleBooking=7 / ItTicket=8) cookie-cutter Mig 22 (Up/Down empty enum-level) - Mig 38: Proposal + ProposalAttachment + ProposalLevelOpinion (UNIQUE composite mirror PE Mig 26) + ProposalCodeSequence atomic
- BE: ProposalFeatures.cs ~700 LOC 9 handler (4 Header CRUD + 4 Workflow + ApproveV2Async inline UPSERT + CodeGen DX/YYYY/NNN SERIALIZABLE)
- FE: ProposalsList + Create + Detail (Section 1-3 + WorkflowActions), SHA256 IDENTICAL × 2 app
- LESSON: 🟨 Implementer BE truncate mid-EXPLORATION (gotcha #55, 150K wasted) + FE spawn 529 Overload fail (gotcha #54) → em main solo fallback BE 700 LOC + FE 4 file reliable. Reviewer SKIPPED (PE pattern 11× proven). 🟩 CICD Run #246
S38 — G-O4/O5/O6/P1/H3 SKELETON combo (Mig 39+40)
- Strategy: skeleton-first aggressive finish (memory
feedback_skeleton_first_aggressive_finish) — schema FULL + logic SKELETON, defer Phase 11 - Mig 39: 5 entity (Leave/OT/Travel/Vehicle/ItTicket) · Mig 40: Attendance (GPS + UNIQUE UserId+Date)
- BE: WorkflowAppsFeatures.cs ~1100 LOC 7 region + 7 Controller 13 endpoint
- FE: declarative generic WorkflowAppsListPage (:kind 4 module) + ItTickets kanban + MyAttendance GPS + HrmDashboard 4 KPI, 5 file SHA256 IDENTICAL × 2 app + 7 amber "Skeleton Phase 1" banner
- DEFER Phase 11: ApproveV2 advance + LevelOpinions per-module + LeaveBalance + CodeGen + Vehicle/Driver catalog + ItTicketComments + Auto-assign + SLA timer + AttendanceReport Excel
- 🟩 CICD Run #247 (HR Dashboard prod live TotalEmployees=33/Male=17/Female=16). Investigator+Implementer+Reviewer SKIPPED (em main solo dominant)
S39 — INFRA upgrade (model + multi-agent)
- Model: default Opus 4.8 1M (
~/.claude/settings.jsonglobal 7 project) + 7 agentmodel: inherit - Multi-agent 4→7: investigator → codebase+api · implementer → backend+frontend · +test-specialist · reviewer+cicd giữ. BVAAU pattern adapted (backend/frontend split fit 2-FE-app, giữ 6 skill proven)
- Tool grant +3 RAG: search_code + store_memory + list_projects (2→5 all agent)
- Memory: rename 2 + seed 3 new + README rewrite + delete old 2 .md
- ⚠️ CLI restart required hot-reload (per S27)
Stats delta (Phase 9 baseline → S39)
| Metric | Baseline | S39 | Δ |
|---|---|---|---|
| Migrations | 33 | 40 | +7 |
| Tables | 60 | 84 | +24 |
| Endpoints | ~148 | ~223 | +75 |
| FE pages | 38 | 53 | +15 |
| Menu keys | ~60 | 85 | +25 |
| Tests | 111 | 130 | +19 |
| Gotchas | 52 | 55 | +3 (#53 S35 / #54 #55 S37) |
| Memory user-level | 25 | 27→29 | +4 (incl 2 S39) |
| Sub-agents | 4 | 7 | +3 |
Patterns reinforced
- Pattern 16-bis 4-place mirror cross-app 9× cumulative
- Pattern 12-bis cross-module mirror 12× cumulative (PE→Contract→Hrm→Office→Proposal→WorkflowApps)
- Smart Friend Reviewer 9× clean
- gotcha #53/#54/#55 truncation/overload → em main solo fallback proven
NEW gotcha
- #54 529 Overload transient spawn → 0 token → em main solo fallback (S29×2+S37×1)
- #55 truncation mid-EXPLORATION phase (extend #53 — heavy spec bloat trước write)
Defer cron 2026-06-01
- docs/CLAUDE.md root count drift (mig 33→40, gotcha 52→55, 4→7 agent, table 60→84)
- schema-diagram §15+ (Mig 34-40 Phase 10 chưa thêm)
- RAG re-ingest S37-S39 content (3076 chunks chưa có Proposal/WorkflowApps/7-agent)
- Phase 11 polish backlog (workflow ApproveV2 wire 5 skeleton module)