Files
solution-erp/.claude/agent-memory/cicd-monitor/archive/2026-05-q2.md
pqhuy1987 cce096309f [CLAUDE] Docs+Memory: S32 Phase 9 stabilize batch — Plan A3 MEMORY curate 3 agents + Plan B-Wrap spec BW1-BW7 defer + Plan C1 ops status update
Phase 9 stabilize sequential batch S32:
- Plan A2 DONE: RAG re-ingest 166 files / 2988 chunks / 75.7s. Verify gotcha #52
  query rerank 0.906 (was 0.516 < 0.7 threshold). Phase 10 backlog query rerank 0.758
  semantic match good.
- Plan A3 DONE: MEMORY curate 3 agents OVER 25KB threshold. Implementer 38.4 -> 27.5KB
  (5 verbose S25-S29 entries archived q2 - Patterns 1-19 + 12-bis + 16-bis foundation
  preserved). Investigator 27.7 -> 19KB (4 verbose S25-S26-S29 entries archived q2).
  CICD Monitor 27 -> 24.2KB (Run #231 PARTIAL detail archived q2 - S29 wrap summary
  preserves key findings). Reviewer 24.39KB unchanged (self-curated S32 startup).
  Total 117.9 -> 95.7KB (-22KB ~18%).
- Plan B-Wrap spec BW1-BW7 documented detailed (migration-todos D-Bis section):
  BW1 happy path step advance + BW2 terminal gen ma HD + BW3 skipToFinal F2 admin
  opt-in + BW4 ForbiddenException + BW5 ApplicableType=Contract validation (Reviewer
  S29 MAJOR catch) + BW6 Mig 32+33 schema persistence UNIQUE composite + BW7 V1
  fallback ConflictException. Defer dedicated session ~2h chot anh main S32 (test
  infra IChangelogService + IContractCodeGenerator mocks first-time).
- Plan C1 ops status update: backup-sql.ps1 ready (register Task Scheduler manual cmd
  documented). win-acme cert api.solutions.com.vn notAfter=2026-07-23 (auto-renew
  ~2026-06-23 NOT 2026-06-18 stale STATUS.md note). SMTP + Rotate creds BLOCKED chờ
  anh main coordinate.

Refs: docs/STATUS.md S31 wrap. docs/HANDOFF.md S31. gotcha #52 qdrant-client search
removed (RAG layer stable post-S31 fix + S32 re-ingest gotchas hit). gotcha #51
INFRASTRUCTURE vs DEMO seed (Phase 10.3 enum extend caution).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-26 16:36:14 +07:00

3.8 KiB
Raw Blame History

CI/CD Monitor Agent — Archive Recent Runs Q2 2026-05 (Plan B detail)

Archived: 2026-05-26 S32 em main proxy curate session (post-S31 RAG fix). Scope: 1 verbose Run #231 entry (Plan B Contract V2 wire kick-off PARTIAL) — moved from MEMORY.md để giữ slim < 25KB threshold (was 27KB → target ~24KB). Rule §6.5 compliance: KHÔNG cắt narrative — full verbose entry preserved cho cross-session audit. KEEP in MEMORY: S32 startup, S29 wrap summary (Run #229-#232 cumulative aggregate including #231 + #232 hotfix DemoSeed gate catch), S28 Layer A governance, S27 hot-reload pitfall, S22 curate session, Run #215+#216 pair (gotcha #48 critical lesson), 2026-05-12 setup. Foundation 10-surface-point per-NV checklist preserved.


Archive entries (FIFO chronological — earliest first)

2026-05-22 12:54-12:58 — Run #231 (id=345) Plan B Contract V2 wire kick-off VERDICT=PARTIAL (PASS deploy + PARTIAL seed)

Push range 6eec8d7..3e92584 11 commits (1 docs MCP RAG tools sub-agent + 2 Mig BE A1+A2+C + 1 Service B+B2 ApproveV2Async ~150 LOC + 1 DTO E1+E2 + 6 FE × 2 app Workspace D + Section 5 E3 + 1 Hotfix Reviewer ApplicableType=Contract guard). CI status=success duration 3m30s (12:54:24→12:57:54). Bundle hash 2/2 ROTATED: admin leEMWFLU→BBADl46y + user Dgn1iU9E→DA_VI3zO (FE shipped OK). Mig 32 + Mig 33 BOTH applied prod: sqlcmd TOP 2 = 20260522052240_AddContractLevelOpinions + 20260522051059_AddApprovalWorkflowToContract. Contract V2 cols verified: ApprovalWorkflowId + CurrentApprovalLevelOrder exist. ContractLevelOpinions table exists, 0 rows (no Contract V2 created yet — expected). API health 200 + 5/5 smoke 200 (contracts/PE/menus/AW-v2 filter / AW-v2 all). V1 backward compat OK: 7 contracts V1 preserved untouched.

CRITICAL DISCOVERY #6 (NEW gotcha to add) — DemoSeed feature flag gates Plan B Chunk A2 sample V2 workflow seed: API log evidence 2026-05-22 12:57:44 [INF] DemoSeed:Disabled=true → skip workflow + contracts + PE + sample V2 seed (Plan T S23 t10 + Plan B Chunk A2 Contract V2). Result: QT-HD-V2-001 NOT seeded in prod (0 rows ApplicableType=3 — only ApplicableType=1 has 2 workflows QT-DN-V2-001 v1+v2 seeded historically pre-flag). V2 endpoint returns {"active":null,"history":[]} cho ApplicableType=3 → FE Workspace Contract Create dropdown EMPTY → user CAN'T pick V2 workflow → V2 wire E2E NOT testable UAT mode. Fix options (escalate em main): (a) admin manually create QT-HD-V2-001 via FE Admin Designer V2 UI post-deploy (preferred — production-safe) OR (b) carve seed out of DemoSeed gate (Plan T S23 t10 design opposite — DemoSeed flag intentional UAT clean-state). Decision NOT for CICD Monitor — escalating.

0 new tests added Plan B (~150 LOC ApproveV2Async NO test cover) — test gate 111 unchanged baseline (UAT skip-test per feedback_uat_skip_verify, but Plan B ApproveV2Async is exact gotcha #48 high-risk pattern: Service refactor > 100 LOC touching changelog/audit paths. Recommend Plan B+1 test addition next chunk before scaling).

SlaExpiryJob ERR cluster (5 entries 12:58:16): pre-existing V1 SLA jobs auto-approve fail on legacy contracts ConflictException Transition X→Y không hỗ trợ (DangInKy→DangKiemTraCCM / DangSoanThao→DangGopY / DangGopY→DangDamPhan / DangTrinhKy→DongDau). UNRELATED to Plan B (V1 phase enum transitions, no V2 involvement). Pre-existing prod noise — escalate em main for separate investigation if cleanup desired.

0 regression observed prod. Plan B BE schema + FE wire shipped successfully; seed gap is feature-flag design choice not deploy failure.

Resolution: Run #232 sha=38f1c4d Hotfix CICD — SeedSampleContractWorkflowV2 carved out of DemoSeed gate (option B). Gotcha #51 added to docs/gotchas.md cumulative.