Files
solution-erp/docs/changelog/sessions/2026-05-26-2030-s33-plan-bc-deploy.md
pqhuy1987 edba4ae147 [CLAUDE] Docs+Memory: S33 wrap — Plan B G-H1 + Plan C B-Wrap deploy prod end-to-end
S33 cumulative wrap update STATUS + HANDOFF + migration-todos tick G-H1
7 task done + session log + CICD MEMORY post-Run #237 entry.

## Updates

- docs/STATUS.md: prepend S33 entry (Plan B + C + D drift patch + multi-agent
  ROI ~250K total + 8 patterns reinforced + new capability UAT-ready)
- docs/HANDOFF.md: prepend S33 wrap + S34 handover recommend sequence (curate
  4 MEMORY → G-O1 Danh bạ → G-H2 HrmConfig)
- docs/changelog/migration-todos.md: tick [x] G-H1 7 task + stats final S33
  + Phase 1.5 backlog
- docs/changelog/sessions/2026-05-26-2030-s33-plan-bc-deploy.md: NEW session
  log full (~250 line: outcomes + plan execution table + multi-agent ROI +
  8 patterns + defer Phase 1.5/S34+ + commits range + UAT capability)
- .claude/agent-memory/cicd-monitor/MEMORY.md: post-Run #237 entry append
  (truncated from S33 startup curate 24.2KB → 32.9KB, curate priority next
  session)

## Stats final S33

| Metric | Pre-S33 | Post-S33 | Δ |
|--------|---:|---:|---:|
| Migrations | 33 | 34 | +1 (Mig 34 AddEmployeeProfiles) |
| Tables | 60 | 67 | +7 (EmployeeProfile + 5 satellite + Sequence) |
| Endpoints | ~148 | ~153 | +5 (/api/employees REST) |
| FE pages | 38 | 40 | +2 (EmployeesListPage + EmployeeCreatePage × 2 app) |
| Menu keys | ~60 | ~62 | +2 (Hrm + HrmHoSo) |
| Tests | 111 | 120 | +9 (BW1-BW7 Plan C, BW6 split 3) |
| Gotchas | 52 | 52 | 0 new (2 existing lesson applied: #50 + #51) |
| Memory user-level | 26 | 26 | 0 new (decision: no rule warrant new entry, all patterns reinforce existing) |
| AppRoles | 14 | 14 | 0 new |
| EmployeeProfile prod | 0 | 33 | +33 (seeded via DbInitializer idempotent) |
| EmployeeCodeSequences | 0 | 1 | NV/2026 LastSeq=33 |

## Multi-agent ROI cumulative S33

🟦 Investigator 2 spawn ~20K + 🟨 Implementer 4 spawn ~110K (2/4 truncated
mid-MEMORY, functional complete) + 🟥 Reviewer 3 spawn ~60K (Smart Friend
6× clean) + 🟩 CICD 3 spawn ~60K (Run #350 + #237 PASS) + em main solo
~150K (Task 2 + Task 3b + Task 6 + 7 commit batch + push).

## CI Runs

- #350 Phase 1 (commit 48a99e1) — 3m38s PASS — Mig 34 prod + 33 seeded + 9 BW
- #237 Phase 2 (commit 79a8343) — 3m50s PASS — 5 NEW employee endpoint + Hrm
  menu seeded + bundle rotate × 2 app

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-26 22:25:19 +07:00

119 lines
8.6 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

# Session 33 — Plan B G-H1 + Plan C B-Wrap deploy prod end-to-end
**Date:** 2026-05-26 (16:00 → 20:45 ICT, ~5h cumulative)
**Trigger:** Anh main chốt "Plan cha B và Plan cha C" sau S33 startup audit + drift patch.
## Outcomes
- **34 mig** (+1 Mig 34 `AddEmployeeProfiles`)
- **67 tables** (+7: EmployeeProfile + 5 satellite + EmployeeCodeSequence)
- **~153 endpoints** (+5 employees REST: GET list, GET detail, POST, PUT, DELETE)
- **40 FE pages** (+2 EmployeesListPage + EmployeeCreatePage × 2 app SHA256 IDENTICAL)
- **62 menu keys** (+2 Hrm + HrmHoSo)
- **120 test PASS** (+9 BW1-BW7 Contract V2 test bundle, was 111 baseline)
- **52 gotcha** unchanged (no new gotcha discovered S33, 2 existing lesson applied)
- **33 EmployeeProfile** seeded prod (1 admin + 30 demo + 2 catalog.manager)
- **7 commit pushed** remote `5400983..79a8343` (full range cumulative S33)
- **2 CI Run PASS:** #350 Phase 1 (3m38s) + #237 Phase 2 (3m50s)
## Plan execution
### Plan cha A (S32 done — Phase 9 stabilize 4 task)
Status carry-over — no S33 work needed.
### Plan cha B — Phase 10.1 G-H1 Hồ sơ Nhân sự (S33 NEW — 7 task end-to-end)
**Trigger:** HANDOFF S32 kick off priority + anh main S33 authorize.
| Task | Owner | Result |
|---|---|---|
| 1. NamGroup pre-flight audit | 🟦 Investigator a103d20 | 10 bảng `TblNhanVien*` (NOT 8 anh estimate) + field map 70 cols + 5 satellite proposal |
| 2. Mig 34 schema design | 👤 Em main solo | 4 decision: 5 satellite / Skill polymorphic / DiaChi FK+freetext dual-write / `NV/{YYYY}/{Seq:D4}` atomic |
| 3. BE entity + EF Config + Mig 34 | 🟨 Implementer a8f4567 | 17 file mới + 4 modified + Mig 34 3-file rule (em main verified via build + ef database update) |
| 3b. DbInitializer seed 30 demo | 👤 Em main solo | SeedDemoEmployeeProfilesAsync ~90 LOC NOT gated DemoSeed flag per gotcha #51 + EmployeeCodeSequence row |
| 4. BE CQRS + Controller | 🟨 Implementer a9bb9f3 | 3 file: EmployeeFeatures (5 pair) + Dtos (5 satellite) + EmployeesController (5 REST endpoint class-level [Authorize]) |
| 5. FE 2 app pages | 🟨 Implementer afdc812 | 6 mới × 2 app SHA256 IDENTICAL + 6 modified (App.tsx + Layout.tsx + menuKeys.ts × 2 app) |
| 6. Permission menu seed | 👤 Em main solo | MenuKeys +Hrm+HrmHoSo + SeedMenuTreeAsync +2 entry order=28 (Admin auto-grant via SeedAdminPermissionsAsync iterate All[]) |
| 7. Pre-commit + post-deploy verify | 🟥 Reviewer ae752c0 + 🟩 CICD ae2a01f | Smart Friend 6× clean (0 critical, 0 major, 3 minor defer Phase 1.5) + Run #237 PASS 3m50s (6/6 endpoint 200 + bundle rotate × 2 + menu seeded + 33 row preserved) |
### Plan cha C — B-Wrap Contract V2 test bundle BW1-BW7 (S33 NEW — 4 step end-to-end)
**Trigger:** Anh main S32 chốt defer dedicated session ~2h. S33 kick off cùng Plan B.
| Step | Owner | Result |
|---|---|---|
| 1. Test infra helpers | 👤 Em main solo | TestCurrentUser.cs stub ICurrentUser (31 LOC) — KHÔNG mock ChangelogService (use REAL impl với stub) |
| 2. Scaffold BW1-BW7 | 🟨 Implementer aaaf0511 | 3 file: ContractWorkflowServiceApproveV2Tests (BW1-4+7) + CreateContractCommandApplicableTypeTests (BW5) + ContractV2SchemaPersistenceTests (BW6 split 3 [Fact]) = 9 [Fact] total |
| 3. Reviewer pre-commit | 🟥 Reviewer aaa1df3 | Smart Friend 5× clean — 9/9 PASS independent verify in 4.7s, spec strings exact match service source, 0 critical/major, 3 minor cosmetic |
| 4. CICD post-deploy verify | 🟩 CICD a67df4e | Run #350 PASS 3m38s — test_infra 62/62 (53+9 BW), Mig 34 prod applied, 33 EmployeeProfiles seeded prod, gotcha #51 verified |
### Plan cha D — Drift patch S33 startup ad-hoc (em main solo)
**Trigger:** S33 startup Reviewer SEVERE catch — CLAUDE.md baseline header drift cumulative S19→S32 misleading future spawn context.
| Action | File | Result |
|---|---|---|
| Patch drift | CLAUDE.md root + docs/CLAUDE.md + .claude/agents/implementer.md | 10 line edit: 26→33 mig + 81→111 test + 26→52 gotcha + audit next 2026-06-01 + Contract V2 wire status + table 52→60 |
## Multi-agent ROI cumulative S33
| Agent | Spawn count | Token est | Verdict |
|---|---:|---:|---|
| 🟦 Investigator | 2 | ~20K | Solid pre-flight audit + cross-agent learning synthesis |
| 🟨 Implementer | 4 | ~110K | Pattern 12-bis + 16-bis 4× cumulative reinforced. 2/4 truncated mid-MEMORY update (Task 3+4 heavy ~50+ tool uses) — functional work complete despite |
| 🟥 Reviewer | 3 | ~60K | Smart Friend 6× clean cumulative — drift severity catch + 2 pre-commit pre-push gates |
| 🟩 CICD | 3 | ~60K | Run #350 + #237 verify PASS + gotcha #51 INFRASTRUCTURE seed pattern reaffirmed prod |
| 👤 Em main solo | — | ~150K | Task 2 schema + Task 3b seed + Task 6 menu + 7 commit batch + push + STATUS/HANDOFF update |
| **Total S33** | **12 spawn** | **~400K** | **0 critical issue end-to-end, 0 prod regression** |
## Patterns reinforced cumulative S33
1. **Pattern 12-bis cross-module entity cookie-cutter mirror PE → Hrm** — 4× cumulative (S29 Plan B Contract Mig 33 + S33 Task 3+4+5)
2. **Pattern 16-bis 4-place mirror cross-app fe-admin+fe-user IDENTICAL** — 4× cumulative (S29 Plan CA HF1 + Plan B Chunk D + S33 Task 5)
3. **Smart Friend independence 6× cumulative clean** (S22 #44 + S25 #48 + S29 Plan CA password + S29 Plan B ApplicableType + S33 Plan C BW + S33 Plan B Phase 2)
4. **gotcha #51 INFRASTRUCTURE vs DEMO seed gate lesson applied 2×** S33 (EmployeeProfile seed line 94 + Hrm menu seed line 1480, both OUT of `if (!demoSeedDisabled)` block)
5. **gotcha #50 Layout staticMap mirror cross-app** applied 1× S33 (`Hrm_HoSo: '/employees'` cả fe-admin + fe-user Layout.tsx)
6. **gotcha #41 path filter Discovery #3** reaffirmed (commit `79a8343` MEMORY-only rides push range trigger when ≥1 commit code)
7. **Implementer truncation pattern observation 2/3** NEW S33 — heavy scaffold ~50+ tool uses runs out token budget on final MEMORY update phase. Functional work complete via Edit/Write tool, MEMORY append cutoff mid-sentence. Mitigation: split heavy task → 2 phase budget reserve OR em main proxy MEMORY append next session
8. **RAG ROI evaluation framework reinforced** — RAG hit 2/3 PASS S33 startup verify (Plan G NamGroup 0.848 + gotcha #52 0.910 + per-NV 10-surface 0.684 boundary). Solo project marginal saving 5-10%, cross-project transform pending 6 project bootstrap.
## Defer Phase 1.5 backlog
1. Per-action policy `Hrm_HoSo_View/Create/Edit/Delete` (gotcha #44 mitigation)
2. Convert 3 bool field UpdateCommand → `bool?` safe partial update
3. Satellite CRUD endpoint (WorkHistory/Education/FamilyRelation/Skill/Document) + FE edit form
4. Test bundle Plan B Phase 2 (Create UNIQUE conflict + List filter + codeGen race)
5. UAT smoke non-admin role verify silent 403 catch
6. fe-admin menuKeys.ts add Bg_*/Catalog* sync với fe-user (drift not blocking)
## Defer S34+ backlog priority
1. **Curate 4 MEMORY sub-agent** (~30 phút) — all 4 over 25KB threshold post-S33 heavy spawn (CICD 32.9 + Imp 30.5 + Rev 28.5 + Inv 26)
2. **G-O1 Danh bạ nội bộ** (~2-3h) easiest standalone, no workflow — reuse Users + EmployeeProfile + Departments
3. **G-H2 Cấu hình HRM** (~3-4h) prerequisite cho G-O3-O6 workflow apps (Mig 35 LeaveTypes + Holidays + ShiftPatterns + OtPolicy)
## Commits range S33
```
79a8343 [CLAUDE] Memory: S33 Plan B Phase 2 + Reviewer activity 3 sub-agent append
9616ae2 [CLAUDE] FE-Admin+FE-User: Plan B G-H1 Task 5 — EmployeesPage 2-panel + EmployeeCreatePage cookie-cutter mirror
0e191de [CLAUDE] Domain+App+Api+Infra: Plan B G-H1 Task 4+6 — Hrm CQRS 5 endpoint + Permission menu
48a99e1 [CLAUDE] Domain+App+Infra: Plan B G-H1 Mig 34 EmployeeProfile + seed 30 demo
0605f19 [CLAUDE] Tests: Plan C B-Wrap BW1-BW7 Contract V2 test bundle +9 tests (111→120)
b3444a3 [CLAUDE] Memory: S33 startup + Plan B+C activity 3 sub-agent append
1bc6b70 [CLAUDE] Docs: patch CLAUDE.md+docs/CLAUDE.md+implementer.md drift S19→S32
```
CI Runs: #350 Phase 1 (3m38s) + #237 Phase 2 (3m50s) cả 2 PASS. Cumulative deploy time ~7m28s within baseline 3-4 min/Run.
## New capability prod end-to-end UAT-ready
Anh main login `admin@solutions.com.vn / Admin@123456` → sidebar "Nhân sự" > "Hồ sơ Nhân sự" → `/employees`:
- List 33 row sample: `NV/2026/0007 BOD 1 - Director, Ban Giám đốc, Active, hireDate=2021-08-01`
- Click row → 6 section collapsible: Cơ bản (Header) + Công tác (WorkHistory empty Phase 1) + Đào tạo + Thân nhân + Kỹ năng + Hồ sơ (Documents empty Phase 1)
- "Tạo mới" button → `/employees/new` form Header minimal (UserId picker + status + birthday + gender + phone + hire date + nationality)
- POST creates new profile with auto `NV/2026/0034+` code sequence
Phase 1.5 sẽ add inline edit + satellite CRUD form.