Files
solution-erp/docs/changelog/migration-todos.md
pqhuy1987 edba4ae147 [CLAUDE] Docs+Memory: S33 wrap — Plan B G-H1 + Plan C B-Wrap deploy prod end-to-end
S33 cumulative wrap update STATUS + HANDOFF + migration-todos tick G-H1
7 task done + session log + CICD MEMORY post-Run #237 entry.

## Updates

- docs/STATUS.md: prepend S33 entry (Plan B + C + D drift patch + multi-agent
  ROI ~250K total + 8 patterns reinforced + new capability UAT-ready)
- docs/HANDOFF.md: prepend S33 wrap + S34 handover recommend sequence (curate
  4 MEMORY → G-O1 Danh bạ → G-H2 HrmConfig)
- docs/changelog/migration-todos.md: tick [x] G-H1 7 task + stats final S33
  + Phase 1.5 backlog
- docs/changelog/sessions/2026-05-26-2030-s33-plan-bc-deploy.md: NEW session
  log full (~250 line: outcomes + plan execution table + multi-agent ROI +
  8 patterns + defer Phase 1.5/S34+ + commits range + UAT capability)
- .claude/agent-memory/cicd-monitor/MEMORY.md: post-Run #237 entry append
  (truncated from S33 startup curate 24.2KB → 32.9KB, curate priority next
  session)

## Stats final S33

| Metric | Pre-S33 | Post-S33 | Δ |
|--------|---:|---:|---:|
| Migrations | 33 | 34 | +1 (Mig 34 AddEmployeeProfiles) |
| Tables | 60 | 67 | +7 (EmployeeProfile + 5 satellite + Sequence) |
| Endpoints | ~148 | ~153 | +5 (/api/employees REST) |
| FE pages | 38 | 40 | +2 (EmployeesListPage + EmployeeCreatePage × 2 app) |
| Menu keys | ~60 | ~62 | +2 (Hrm + HrmHoSo) |
| Tests | 111 | 120 | +9 (BW1-BW7 Plan C, BW6 split 3) |
| Gotchas | 52 | 52 | 0 new (2 existing lesson applied: #50 + #51) |
| Memory user-level | 26 | 26 | 0 new (decision: no rule warrant new entry, all patterns reinforce existing) |
| AppRoles | 14 | 14 | 0 new |
| EmployeeProfile prod | 0 | 33 | +33 (seeded via DbInitializer idempotent) |
| EmployeeCodeSequences | 0 | 1 | NV/2026 LastSeq=33 |

## Multi-agent ROI cumulative S33

🟦 Investigator 2 spawn ~20K + 🟨 Implementer 4 spawn ~110K (2/4 truncated
mid-MEMORY, functional complete) + 🟥 Reviewer 3 spawn ~60K (Smart Friend
6× clean) + 🟩 CICD 3 spawn ~60K (Run #350 + #237 PASS) + em main solo
~150K (Task 2 + Task 3b + Task 6 + 7 commit batch + push).

## CI Runs

- #350 Phase 1 (commit 48a99e1) — 3m38s PASS — Mig 34 prod + 33 seeded + 9 BW
- #237 Phase 2 (commit 79a8343) — 3m50s PASS — 5 NEW employee endpoint + Hrm
  menu seeded + bundle rotate × 2 app

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-26 22:25:19 +07:00

79 KiB
Raw Blame History

Migration To-dos — Atomic Roadmap

Tick [x] khi xong. Phase 0-8 đã DONE — collapsed. Detail xem session logs trong docs/changelog/sessions/. Active work: Phase 9 (UAT + Ops + carry over PE PDF export + Tests Phase 3-5).

Phase 0-5 + Tier 3 — Done (2026-04-21..22)

Phase Focus Trạng thái
0 Draft Scaffold .NET 10 + 2 Vite + parse FORM/QT + docs
1 Alpha Core Auth + 12 role + Permission Matrix + 3 master CRUD + Contract draft
2 Form Engine OpenXml + ClosedXML render + LibreOffice PDF + DynamicForm
3 Workflow State machine 9 phase + RG-001 code gen + SLA job + attachments + SignalR realtime
4 Reporting Dashboard KPI + Excel export + MyDashboard role-aware + brand identity #1F7DC1
5 Production CI/CD Gitea Actions + 3 IIS site + Let's Encrypt + Security headers + Users CRUD
Tier 3 Versioned workflow + 3-panel layout + 4-bảng overhaul + 4 master catalogs + 16 demo users + RolesPage CRUD + 7 demo HĐ varied

Detail chi tiết: docs/changelog/sessions/2026-04-21-*.md + 2026-04-22-0300-tier3-feature-complete.md + 2026-04-23-*.md.

Phase 6 — Module Duyệt NCC (tiền-HĐ) — Done

Iter 1 (2026-04-23)

  • Migration 12 AddPurchaseEvaluations — 10 bảng (Header/Suppliers/Details/Quotes/Approvals/Changelogs/Attachments/WorkflowDefinitions/Steps/StepApprovers)
  • Domain — 2 enum (Type A/B, Phase 7-state) + Policy record + Registry + FromDefinition builder
  • Seed — 13 menu Pe_/PeWf_ + 2 WorkflowDefinition v01 (QT-DN-A 3-step, QT-DN-B 5-step)
  • Application CQRS ~900 LOC — Create/Update/Transition/List/Inbox/Get/Delete + Supplier CRUD + Detail CRUD + Quote Upsert + SelectWinner + Changelog
  • PurchaseEvaluationWorkflowService — policy guard + approval + notification + changelog
  • PurchaseEvaluationsController — 17 endpoint REST
  • FE 2 app — Types + PurchaseEvaluationsListPage 3-panel + Create page + PeDetailTabs + PeWorkflowPanel + Menu resolver Pe_*
  • Kế thừa HĐ — CreateContractFromEvaluationCommand (guard DaDuyet + SelectedSupplier + !ContractId) → Contract draft. FE CreateContractDialog pick ContractType.
  • Migration 13 AddPurchaseEvaluationCodeSequences — atomic MaPhieu sequence PE/{YYYY}/{A|B}/{Seq:D3}
  • Demo PE seed — 4 phiếu varied phase (A-001/A-002/A-003/B-001) + Pe_* permission defaults 7 role × 9 menu key

Session log: 2026-04-23-2300-purchase-evaluations.md + 2026-04-24-1030-pe-polish-demo-maphieu-perms.md.

Iter 2 — UX polish (2026-04-24)

  • Rename menu "Phương Án" → "Giải pháp" + backfill DB (zero breaking change)
  • Menu tree inheritance extend Pe_/PeWf_ (GetMyMenuTreeQuery + 4 root)
  • Accordion mutex Pe_* groups + sidebar w-72 + label nowrap
  • NavLink active check query string (queryMatches helper) — fix 2 leaf cùng highlight
  • PE detail flat layout: Panel 2 = 4 section (Thông tin/NCC/Hạng mục/Bảng so sánh), Panel 3 += Approvals + Changelog
  • Upload file đính kèm per-NCC (SupplierAttachmentsCell) + Bảng so sánh tổng (GeneralAttachmentsSection, supplierRowId=null) + enum ComparisonTable=4
  • readOnly mode menu "Duyệt" (pendingMe=1) — hide Sửa/Xóa/Thêm/Edit/Upload/Delete, giữ download + transition + comment
  • Contract: move Lịch sử điều chỉnh Panel 2 → Panel 3 (Chi tiết HĐ full-width)
  • Demo email rebrand @solutionerp.local@solutions.com.vn + BackfillUserEmailDomainAsync (idempotent rename 4 field Email/NormalizedEmail/UserName/NormalizedUserName)

Session log: 2026-04-24-chot-session-3-pe-polish.md.

Domain rebrand .huypham.vn.solutions.com.vn (2026-04-24)

  • 18 file repo (FE env + scripts + CI/CD + docs + skill + code comments)
  • scripts/migrate-domains.ps1 (ASCII-only #30) — 3 IIS binding + 3 cert Let's Encrypt + auto HTTPS + redirect
  • CI/CD auto rebuild BE CORS + FE bundle VITE_API_BASE_URL
  • E2E verified 3 domain live + preflight OK

Sub: api.solutions.com.vn · admin.solutions.com.vn · eoffice.solutions.com.vn. Old .huypham.vn vẫn fallback (chưa remove — Phase 9 Ops).

📝 Phase 7 — PE feature gap + Budget BE (Session 4 partial done)

A. PE feature gap (3 task — phần lớn đóng ở Phase 8 S5)

  • PE Workflow admin designer UI /system/pe-workflows/:typeCode — done S5 (5d94bb4)
    • BE Application/PurchaseEvaluations/PeWorkflowAdminFeatures.cs (mirror WorkflowAdminFeatures.cs)
    • Api/Controllers/PeWorkflowsController.cs
    • FE fe-admin/src/pages/system/PeWorkflowsPage.tsx + PeWorkflowDesigner.tsx
    • Route /system/pe-workflows/:typeCode (menu PeWf_* + resolver đã sẵn)
  • Ý kiến 4 phòng ban (Phê duyệt / P.CCM / P.MuaHàng / SM-PM) ở tab Thông tin — done S5 (5d94bb4, Migration 15)
    • Option A: 4 text field + signoff date + UserId vào header
    • Option B: dùng PurchaseEvaluationApprovals với roleKind extra field
    • Chốt: dùng Migration 15 AddPurchaseEvaluationDepartmentOpinions (separate table UNIQUE PEId+Kind, 4 box sign-off 2x2 grid OpinionBox như Excel mẫu) — tốt hơn Option A/B vì audit qua Changelog + Upsert preserve chữ ký cũ khi text-only edit.
  • Export phiếu PDF/Excel — tái dùng IDocumentConverter + template PE-TrinhDuyet.docx → carry over Phase 9 (user pending — không quan trọng lắm)

B. Optional polish (carry over Phase 9 — làm khi UAT phát sinh)

  • Auto-map PE Details → Contract per-type Details khi gen HĐ (phức tạp vì 7 schema khác nhau)
  • Payment terms tách field từ JSON → 6 column (Tạm ứng/TT tạm/Quyết toán/Bảo hành/Hạn mức/Đánh giá)
  • Matrix Quotes bulk paste từ Excel
  • fe-user Inbox thêm section "Phiếu Duyệt NCC chờ tôi"

C. Ops (carry over Phase 9 — Hard blockers)

  • Remove binding cũ .huypham.vn sau verify stable: ssh vietreport-vps ; cd C:\solution-erp\scripts ; .\migrate-domains.ps1 -RemoveOld -SkipCert
  • win-acme scheduled task fix unhealthy (cert expire 2026-06-18)
  • UAT thật 1 tuần với 2-3 user (30 demo user — 16 sample + 14 Solutions thật)
  • SMTP config → Email outbox
  • Rotate credentials (admin + 30 demo + SA + vrapp + JWT)
  • Schedule SQL backup Task Scheduler

D. Module Ngân sách (Budget) — Session 4 partial done

  • Migration 14 AddBudgets — 4 bảng (Budgets/BudgetDetails/BudgetApprovals/BudgetChangelogs) + index BudgetId nullable trên Contract & PurchaseEvaluation
  • Domain — Budget (Header) + BudgetDetail (flat row) + BudgetApproval + BudgetChangelog + enum BudgetPhase 5-state + BudgetEntityType Header/Detail/Workflow
  • BudgetPolicy.Default hardcoded simple 3-step (Drafter→CCM→CEO + Reject từ ChoCCM/ChoCEO về DangSoanThao)
  • Application CQRS ~340 LOC — Create + UpdateDraft + Transition + List + GetDetail + Delete (only DangSoanThao/TuChoi) + Detail CRUD (auto-recompute TongNganSach) + ListChangelogs
  • BudgetsController 11 endpoint REST
  • Menu seed Budgets root + 3 leaf (Bg_List/Bg_Create/Bg_Pending) order=27 icon Wallet
  • 14 demo user Solutions thật — PRO 5 + CCM 7 + ISO 1 + CEO 1 (pwd User@123456). Reconcile pattern (gotcha #38 4-field rename). Tổng 30 user (16 sample cũ + 14 Solutions thật mới).

Session log: 2026-04-28-chot-session-4-budget.md.

E. Pending migrations

  • AddPePaymentTermFields (nếu chốt UX tách field — JSON blob → 6 column)
  • AddPurchaseEvaluationDepartmentOpinions migration 15 (S5)
  • AddBudgetCodeSequences (nếu chốt format MaNganSach atomic — hiện Random.Shared)
  • AddBudgetVersionedWorkflow (nếu user cần admin config UI thay vì hardcoded BudgetPolicy.Default)

Phase 8 — Budget FE + PE/HD integration (Session 5 done)

A. FE Budget pages — done

  • fe-admin/src/types/budget.ts (BudgetPhase 5-state enum + DTO types)
  • fe-admin/src/pages/budgets/BudgetsListPage.tsx (3-panel [340px_1fr_360px] + filter Phase/Năm + ?phase=Pending alias + readOnly mode + BudgetDetailPage fullpage mobile)
  • fe-admin/src/pages/budgets/BudgetCreatePage.tsx (form Header — Tên/Năm/Dự án/Phòng ban/Mô tả)
  • fe-admin/src/components/budgets/BudgetDetailTabs.tsx (Section Thông tin Header + Section Hạng mục table CRUD inline auto-compute ThanhTien=KL×ĐG)
  • fe-admin/src/components/budgets/BudgetWorkflowPanel.tsx (Panel 3 timeline activePhases + nextPhases buttons + Dialog comment + Approvals/Changelog)
  • Mirror tất cả sang fe-user/
  • App.tsx routes /budgets, /budgets/new, /budgets/:id cả 2 app
  • Menu resolver Bg_* (Bg_List → /budgets, Bg_Pending → /budgets?phase=Pending, Bg_Create → /budgets/new)

B. PE/Contract → Budget integration — done

  • PE form + Select "Ngân sách" filter Phase=DaDuyet, ProjectId match, BE validate
  • Contract form (Header + Edit) tương tự, EditForm read-only link card khi !isDraft
  • PE Detail Hạng mục thêm cột "NS link · Δ" — match per-row qua groupCode|itemCode + footer aggregate (xanh dưới / đỏ vượt / xám khớp)
  • PE Detail UI restructure 4 section đánh số match form spec PHIẾU TRÌNH KÝ
  • BE: BudgetSummaryDto shared + Create/Update PE+Contract commands + BudgetId? + GetQueries load Budget
  • CreateContractFromEvaluation carry forward pe.BudgetId → contract.BudgetId

C. PE Workflow Designer admin UI — done

  • BE PeWorkflowAdminFeatures.cs ~250 LOC mirror Contract pattern
  • BE PeWorkflowsController 2 endpoint reuse policy Workflows.*
  • FE PeWorkflowsPage.tsx ~500 LOC + designer dialog (clone/edit/+Role/+User)
  • App.tsx route /system/pe-workflows/:typeCode

D. Ý kiến 4 phòng ban — done

  • Migration 15 AddPurchaseEvaluationDepartmentOpinions (UNIQUE PEId+Kind)
  • Domain entity + enum PeDepartmentKind (PheDuyet/Ccm/MuaHang/SmPm)
  • BE Upsert (sign=true → set SignedAt+UserId, sign=false giữ chữ ký cũ) + Delete + 2 endpoint
  • FE Section "5. Ý kiến 4 phòng ban (sign-off)" 2x2 grid OpinionBox

E. Tests Phase 1-2-3mini + CI optimize — done

  • Phase 1tests/SolutionErp.Domain.Tests/ (xUnit + FluentAssertions 7.2): 54 test policy state machine (Contract WF + PE WF + Budget) + Registry + FromDefinition versioned + UserKindApprover
  • Phase 2tests/SolutionErp.Infrastructure.Tests/ (EF SQLite + TestApplicationDbContext override nvarchar(max) → TEXT): 17 test code generator format + sequence + year boundary + persistence verify
  • Phase 3 minitests/.../Application/PeWorkflowAdminTests.cs: 6 test CreatePeWorkflowDefinitionCommand versioning (auto-increment + deactivate cũ + EvaluationType independence + steps/approvers persistence)
  • CI gate .gitea/workflows/deploy.yml — 2 step dotnet test trước build, fail → no deploy
  • Total 77 test pass / ~3s
  • CI manual checkout bypass github.com — fix gotcha #39 (act_runner TCP timeout 21s)
  • CI path filter docs-only skip — gotcha #41 (paths-ignore behavior)
  • Tests Phase 3 full — Opinion Upsert + Budget link validation (cần Identity UserManager setup helper)
  • npm junction cache CI optimize (rollback ở a21790d — gotcha #40 chưa debug)

📝 Phase 9 — UAT + Ops + carry over (Session 6+ active)

Session 20 WRAP done (2026-05-11 chốt 22:00) — 14 commit 9dee00dae1814c

12 turn 1 ngày — PE UI restructure 3 chủ đề + Mig 27 menu eOffice + Multi-agent setup.

Session log: 3 file

  • 2026-05-11-1100-pe-ui-restructure-s20.md (turns 1-5: PE Detail nested grid + Section gộp)
  • 2026-05-11-1700-menu-visibility-mig27.md (turn 7: admin menu eOffice Mig 27)
  • 2026-05-11-2200-pe-polish-responsive-multiagent.md (turns 6 + 8-12: polish + responsive + multi-agent)

Stats final S20:

Metric Δ Final
Migrations +1 (Mig 27) 27
Endpoints +1 (PATCH /menus/{key}) ~142
FE pages +1 (MenuVisibilityPage) 34
Menu keys +1 (MenuVisibility) ~61
Memory entries +2 (responsive + multi-agent) 16
Sub-agents +3 NEW (Inv + Imp + Rev seeds) 3
Commits 14 (9dee00dae1814c)
DB tables 0 59
Tests 0 (Phase 9 UAT defer) 81 PASS
Gotchas 0 44
Skills 0 (reuse trong agents) 6

Memory entries mới (2):

  • feedback_responsive_laptop_breakpoint.md (t11) — 4-tầng responsive pattern
  • feedback_multi_agent_setup.md (t12) — decision gate + ACCEPT/REFUSE + Windows MAX_PATH

Defer Session 21+ NEW:

  • Trial Week 1 — Contract V2 wire Mig 28+29 (Plan cha B HIGH) — kick off multi-agent với Investigator pre-flight + Implementer Chunk A-E + Reviewer pre-commit. Audit-reuse pattern PE V2 (memory feedback_audit_reuse_before_clone).
  • Test regression Mig 27 PATCH /menus/{key} (Plan cha C MED) — validate Key required + DisplayLabel trim
  • Skill permission-matrix cross-ref section "menu visibility" — defer cron audit 2026-06-01

Session 20 turn 7 done (2026-05-11) — Admin Ẩn/Hiện + Đổi tên menu eOffice (Mig 27, 5 chunk 2ea2d27ef394f8059bfcb1ed6530 → Chunk E Docs)

User UAT yêu cầu admin quản lý menu eOffice (fe-user) — Ẩn/Hiện + Đổi tên. Confirm "chưa có" → tạo mới. User Q2=b clarify quan trọng: DisplayLabel CHỈ áp fe-user, admin sidebar giữ Label gốc.

  • Chunk A (2ea2d27) Schema + Mig 27 — Domain MenuItem +IsVisible bool=true +DisplayLabel string?(200). EF config HasDefaultValue + HasMaxLength. Migration 27 AddVisibilityAndDisplayLabelToMenuItems (2 AddColumn) — 3-file rule. Apply LocalDB _Dev + _Design qua --connection override (memory feedback_designtime_runtime_db).

  • Chunk B (ef394f8) BE API — DTO MenuNodeDto + MenuItemDto +isVisible +displayLabel. GetMyMenuTreeQueryHandler pass through (KHÔNG filter server-side, 2 FE tự quyết). NEW UpdateMenuItemCommand + Validator + Handler (whitespace → null). MenusController +PATCH /api/menus/{key} [Authorize Policy="Permissions.Update"] body {isVisible, displayLabel}.

  • Chunk C (059bfcb) FE Admin — Domain MenuKeys +MenuVisibility + All[]. DbInitializer +leaf "Menu eOffice" Icon=Eye Order=94 (Workflows shift 94→95). Manual seed Mig 27 LocalDB Dev (INSERT MenuItems + Permissions Admin). FE Admin types/menu.ts mirror, menuKeys.ts +const, Layout resolver +/system/menu-visibility, App.tsx +Route. NEW pages/system/MenuVisibilityPage.tsx ~210 LOC: PageHeader + 4 StatCard + Search + Table 5 cột (Key mono + parentKey↳ / Tên gốc / Input "Tên hiển thị" inline / Toggle Eye-EyeOff emerald-amber / Save dirty + Khôi phục custom). onSuccess invalidate ['menus','all'] + ['my-menu'] live update sidebar.

  • Chunk D (1ed6530) FE User — fe-user types/menu.ts mirror. Layout.tsx filterForUser 2 tầng (USER_HIDDEN_KEYS hardcode structural + !isVisible dynamic). Helper effectiveLabel(n) = displayLabel?.trim() || label. Replace 3 callsite {node.label} → {effectiveLabel(node)}. USER_FIXED_TOP "__inbox" +isVisible:true cho type check. fe-admin Layout KHÔNG đụng — admin sidebar render Label gốc + show hết menu (user Q2=b).

  • Chunk E Docs (current) — STATUS Recently Done top + Last updated S20 turn 7. HANDOFF TL;DR Session 20 turn 7 trên đầu (giữ S20 prev nguyên §6.5). migration-todos done section (file này) + pending S21+. Session log 2026-05-11-1700-menu-visibility-mig27.md. KHÔNG đụng rules / architecture / PROJECT-MAP / workflow-contract / forms-spec / database-guide / schema-diagram / CLAUDE.md (defer cron audit 2026-06-01).

Stats Session 20 turn 7: 26→27 mig (+1 AddVisibilityAndDisplayLabelToMenuItems), 59 DB tables (no change), ~141→142 endpoints (+1 PATCH /menus/{key}), 33→34 FE pages (+1 MenuVisibilityPage), ~60→61 menu key (+1 MenuVisibility), 81 test pass (Q4 UAT defer), 44 gotcha (no new). Memory entries 14 (no new).

Defer Session 21+ (mới sau S20 turn 7):

  • Test PATCH /api/menus/{key} validate Key required + DisplayLabel trim
  • Skill permission-matrix cross-ref section "menu visibility" — defer cron audit 2026-06-01
  • UX verify trong UAT: admin ẩn menu cha → children có ẩn theo không? (FE filter check per-node !n.isVisible, parent vẫn hiện thì children render. Có thể cần propagate hidden tree-level nếu UAT phản hồi)

Session 20 done (2026-05-11) — PE Detail UI restructure 3 yêu cầu UX user (4 chunk 9dee00d2bba851f2f01f4 → Chunk D Docs)

User UAT live feedback: "Logic khá OK rồi, điều chỉnh UI Duyệt NCC 1 tý". 3 yêu cầu cụ thể chốt qua Q&A 4 câu (Q1=a giữ Section "Chọn NCC TP" / Q2=a NCC shared + 1 hạng mục demo / Q3=a chỉ hiện NV đã ký / Q4 public luôn skip dotnet test). FE-only restructure (1 hook BE nhẹ auto-seed Detail).

  • Chunk A (9dee00d) BE auto-seed + FE reorder sectionCreatePurchaseEvaluationCommandHandler thêm 1 PurchaseEvaluationDetail mặc định khi tạo phiếu: GroupCode="01", GroupName="Hạng mục chính", NoiDung=TenGoiThau, DonGiaNganSach=ThanhTienNganSach=Budget.TongNganSach (nếu link) hoặc BudgetManualAmount fallback hoặc 0; Changelog Insert audit. FE reorder PeDetailTabs section (mirror 2 app): 1.Thông tin / 2.Hạng mục lên #2 / 3.Chọn NCC / 4.NCC tham gia / 5.Ý kiến. Verify dotnet build pass.

  • Chunk B (2bba851) Nested grid Hạng mục → NCC expand — ItemsTab restructure thành list HangMucCard (1 card / 1 hạng mục, expanded=true mặc định cho 1 hạng mục demo). Header: GroupCode + NoiDung + 3 stat (KL/ĐG/TT) + NS link Δ + Pencil/Trash + ▼/▶ toggle. Expand body: NCC inline table 8 cột (NCC/Liên hệ/Điều khoản TT/File báo giá/ĐG chưa VAT/ĐG có VAT/Thành tiền/Action). Click cell quote → QuoteDialog reuse. + Thêm NCC / Sửa NCC reuse 2 dialog cũ. Winner ✓ button per row. Drop SuppliersTab function dead code ~134 LOC. Giữ AddSupplierDialog + EditSupplierDialog + SupplierAttachmentsCell (HangMucCard call lại). Section 4 NCC tham gia cũ bỏ → 4 section final (1.Thông tin / 2.Hạng mục nested / 3.Chọn NCC TP thắng thầu / 4.Ý kiến). Verify npm build × 2 app pass sau khi catch TS6133 SuppliersTab + SupplierAttachmentsCell unused.

  • Chunk C (f2f01f4) Section Ý kiến gộp đồng cấp cùng Phòng — FE-only KHÔNG đụng Mig 26 schema (vẫn UPSERT 1 row / Level qua Service). LevelOpinionsSectionV2 forEach step → 1 StepOpinionsBox (replace grid-cols-2 N approvers). Header: "Bước N — Tên" + dept badge emerald + "X/Y đã duyệt" counter. Body filter opinions theo step.order → sort levelOrder asc + signedAt asc → render StepOpinionEntry per signed (tên NV + Cấp badge slate + admin override badge amber nếu có + emerald rounded-full timestamp + comment whitespace-pre-wrap). NV chưa duyệt KHÔNG hiển thị (Q3=a). Drop LevelOpinionBox function. Mirror fe-admin + fe-user. Verify npm build × 2 app pass.

  • Chunk D Docs (current) — STATUS Recently Done top + header narrative · HANDOFF TL;DR Session 20 + pending S21+ + hard blockers ops carry · migration-todos Phase 9 Session 20 done section (file này) · Session log mới 2026-05-11-1100-pe-ui-restructure-s20.md. KHÔNG đụng rules/architecture/PROJECT-MAP/workflow-contract/forms-spec/database-guide/schema-diagram/CLAUDE.md (defer cron audit 2026-06-01 — per §6.5 không cố sửa khi không cần; S20 không thêm migration / gotcha mới nên count drift không đổi từ S19).

Stats final Session 20: 26 mig (no new), 59 DB tables (no new), ~141 endpoints (no new — reuse + 1 BE hook trong existing CreatePE handler), 33 FE pages (no new), 81 test pass (no change — Phase 9 UAT iteration skip test mỗi chunk Q4), 44 gotcha (no new). LOC delta net ~+25 FE (gross ~+700 / ~725).

Defer Session 21+:

  • Test V2 Service wire (Chunk B Service hook S19 + Section gộp Chunk C S20) — defer khi UAT user confirm + có sample data Production.
  • Test regression B4 silent 403 S18 (HIGH §7 priority — vi phạm rule test-before bug fix) — per-action [Authorize(Policy=...)] ApprovalWorkflowsV2Controller.
  • Test Mig 25 PATCH user-selectable endpoint (MED — admin scope hẹp).
  • Contract V2 wire (Mig 27/28 mirror PE pattern) — biggest pending Plan. Mig 27 Contract.ApprovalWorkflowId + CurrentApprovalLevelOrder; Mig 28 ContractLevelOpinions; Service ApproveV2Async; ContractCreatePage Workspace Select V2; pin V2 mặc định cho ContractType; ContractDetailContent Section "Ý kiến cấp duyệt" V2 dynamic mirror S20 Chunk C.
  • Phân quyền strict V2 — vẫn loose UAT. Sau confirm V2 flow → list/inbox/detail filter actor scope.
  • Drop legacy V1 cleanup sau UAT chốt (drop tables WorkflowDefinitions/Steps/Approvers + drop column RejectedAtStepIndex/RejectedFromPhase deprecated S17 + drop ApproveV1LegacyAsync branch).
  • Drop Mig 15 cho V2 phiếu cleanup sau UAT confirm (Mig 30 drop PurchaseEvaluationDepartmentOpinions, hoặc giữ cả 2 backward compat — Q3 user chốt giữ legacy).
  • schema-diagram §16 PE Level Opinions V2 + §17-21 Mig 18-21 — defer cron audit 2026-06-01.
  • Skill ef-core-migration frontmatter "21 migration" stale (thực 26) + dependency-audit-erp count gotcha 41 stale (thực 44) — defer cron audit 2026-06-01.

Session 19 done (2026-05-09) — PE Section 5 V2 dynamic theo ApprovalWorkflowLevel + Mig 26 (4 commit 873e7a1 → Chunk D Docs)

User UAT live tiếp Session 18. 1 polish nhỏ + 1 feature lớn (Section 5 dynamic). Spec chốt 5 câu Q&A trước code (Q1=1B sync auto / Q2=2A+Admin / Q3=V2 hết / Q4=4C+placeholder / Q5=5A grid-cols-2).

  • Polish 3 button (873e7a1) Hành động Workflow Panel — rút gọn label "✓ Duyệt / ← Trả lại / ✗ Từ chối" (bỏ "→ Chờ X" / "(về Drafter sửa)" / "Hủy /") + 3 màu phân biệt (emerald/amber/red) + font-medium → font-bold. Phase đích vẫn hiện qua tooltip title hover. Mirror fe-admin + fe-user.

  • Chunk A (77a3058) Domain + Mig 26 + EF — Entity PurchaseEvaluationLevelOpinion : AuditableEntity (PEId+LevelId UNIQUE composite, Comment nvarchar(2000), SignedAt datetime2, SignedByUserId Guid, SignedByFullName nvarchar(200) denorm). EF FK Cascade Pe + Restrict Level. Migration 26 AddPeLevelOpinionsForV2 (1 CREATE TABLE + 2 FK + 2 index — UNIQUE composite + IX LevelId). 3-file rule. Apply LocalDB SolutionErp_Dev OK (Mig 25 + 26 catchup).

  • Chunk B (90baa8e) Service V2 hook + DTO + GET include — Service ApproveV2Async sau line log approval → UPSERT row LevelOpinion cho Cấp hiện tại (match level theo ApproverUserId == actorUserId, fallback first khi Admin override). Reject KHÔNG sync. Comment empty → "(duyệt — không ý kiến)" placeholder. Helper ResolveActorFullNameAsync denorm SignedByFullName. DTO PurchaseEvaluationLevelOpinionDto 15 fields. GET handler Include LevelOpinions + helper BuildLevelOpinionsAsync JOIN Steps/Levels + Departments + Users → denorm DTO list. Empty cho V1 / V2 chưa có cấp duyệt.

  • Chunk C (6e913b3) FE Section 5 V2 dynamic mirror 2 app — Type PeLevelOpinion + PeDetailBundle.levelOpinions[]. Section 5 conditional: evaluation.approvalWorkflowId set → <LevelOpinionsSectionV2/> (dynamic), else <DepartmentOpinionsSection readOnly/> (V1 legacy fallback Mig 15). LevelOpinionsSectionV2: forEach Step (header "Bước N — Phòng X" badge emerald + hint số người duyệt) → grid-cols-2 cho step.levels.flatMap(level => level.approvers.map(approver => <LevelOpinionBox/>)). LevelOpinionBox read-only: title "Cấp N — " + badge amber "⚠ Admin duyệt thay" khi override + badge emerald "✓ Đã duyệt" + empty "— chưa duyệt" + footer signedAt. Mirror fe-admin + fe-user (rule §3.9).

  • Chunk D Docs (current) — STATUS Recently Done top + header narrative · HANDOFF TL;DR Session 19 + 7 cảnh báo Session 20+ (giữ S18 nguyên văn theo §6.5) · CLAUDE.md (root) count 25→26 mig + 58→59 tables + Mig 26 description block · migration-todos Phase 9 Session 19 done section + Defer Session 20+ checklist · Session log mới 2026-05-09-0400-pe-section-5-v2-dynamic-mig26.md. KHÔNG đụng rules/architecture/PROJECT-MAP/workflow-contract/forms-spec/database-guide/schema-diagram (defer cron audit 2026-06-01) — per §6.5 không cố sửa khi không cần.

Stats final Session 19: 26 mig (+1), 59 DB tables (+1), ~141 endpoints (no new — UPSERT auto qua Service hook không endpoint riêng vì Q1=1B), 33 FE pages, 81 test pass (no change — feature mới UAT defer test §7), 44 gotcha (no new). Memory entries 14 (no new).

Defer Session 20+:

  • Test V2 Service wire mới (Chunk B Service hook) — defer khi UAT user confirm + có sample data Production. Domain test ApproveV2 + UPSERT opinion match logic + Admin override match firstLevel + comment empty placeholder.
  • Drop Mig 15 cho V2 phiếu (cleanup sau UAT confirm) — sau khi không còn phiếu V2 dùng PurchaseEvaluationDepartmentOpinions. Mig 27 cleanup drop bảng + entity. Hoặc giữ cả 2 backward compat.
  • Migrate phiếu V1 cũ sang V2 (data migration) — admin tool chuyển ApprovalWorkflowId. Hiện chưa làm (Q3 user nói chuyển V2 hết = phiếu MỚI dùng V2, V1 cũ giữ legacy).
  • Contract V2 wire (Mig 27/28) — mirror PE pattern: Contract.ApprovalWorkflowId + ContractLevelOpinions Mig 28 + Service ApproveV2Async + ContractDetailContent Section 5 V2. Audit-reuse pattern.
  • Phân quyền strict V2 — vẫn loose UAT. Sau confirm V2 flow → list/inbox/detail filter actor scope.
  • schema-diagram §16 PE Level Opinions V2 + §17-21 Mig 18-21 — defer cron audit 2026-06-01.
  • Skill ef-core-migration frontmatter "21 migration" stale (thực 26). Defer cron audit 2026-06-01.
  • Skill dependency-audit-erp count stale. Defer cron audit 2026-06-01.

Session 18 done (2026-05-08 19:45) — PE V2 polish + Clone B + Mig 25 IsUserSelectable + 4 bug fix UAT (7 commit aaa1c6c32a8d4d)

User UAT live tiếp Session 17, chuỗi polish nhỏ + clone V2 cho type B. Áp memory feedback_uat_skip_verify (skip dotnet test mỗi chunk, push ngay) + lesson rename/remove → bắt buộc npm run build.

  • B1 (aaa1c6c) Pe Duyệt filter cứng "Đã gửi duyệt" — bỏ dropdown trạng thái + filter cứng client-side getPeDisplayStatus === DaGuiDuyet. Hint amber "Lọc cố định". Workaround BE /inbox loose UAT trả phiếu Nháp (phân quyền strict V2 pending).

  • B2 (917446d) HistoryTab filter Trả lại / Gửi duyệt lại — FE filter (BE keep audit data đầy đủ): chỉ events Workflow Transition về TraLai (phaseAtChange=98) + từ TraLai (summary "TraLai →") + sửa nội dung khi phaseAtChange=TraLai.

  • B3 (937eb24) Clone V2 cho B (DuyetNccPhuongAn) — Audit reuse trước thay vì duplicate. Schema chung qua ApplicableType discriminator → chỉ 3 file ~60 LOC: MenuKeys.cs +const + All array, DbInitializer.SeedMenusAsync +leaf B (Order=2) + new SeedSampleApprovalWorkflowsV2Async (idempotent skip nếu admin đã tạo workflow B), fe-admin/menuKeys.ts +const. Memory feedback_audit_reuse_before_clone.md capture pattern.

  • B4 (f77ea38) Fix silent 403 ApprovalWorkflowsV2 — Drafter nv.test Workspace dropdown empty silent. Root: class-level [Authorize(Policy = "Workflows.Read")] → non-admin 403, TanStack Query catch silent. Fix: class-level [Authorize] only, GET cho any authenticated; POST/DELETE giữ Workflows.Create admin-only. Gotcha #44.

  • B5 (a9c0857) Fix sidebar highlight queryMatches transient keys — Click row → URL có id transient → exact-set mismatch → menu unhighlight. Fix: TRANSIENT_QUERY_KEYS = {id, q, editHeader, page, phase, awId} strip trước compare. Mirror fe-admin + fe-user Layout.tsx.

  • B6 (2a53107) Mig 25 + Designer pin toggle + bỏ "(clone)" + Workspace filter — Migration 25 AddIsUserSelectableToApprovalWorkflows: ALTER IsUserSelectable bit + Sql backfill WHERE IsActive=1 SET 1. Domain +property. DTO +field. CreateAwDefinitionCommand set default true. New SetAwUserSelectableCommand + Handler. API PATCH /api/approval-workflows-v2/{id}/user-selectable. DbInitializer SeedSample +IsUserSelectable=true. FE Designer +badge "Cho user chọn" + button Ghim/Bỏ ghim + mutation toggleSelectable. Designer name auto-fill bỏ "(clone)" suffix. FE Workspace fetch filter w.isUserSelectable === true (cả fe-admin + fe-user).

  • B7 (32a8d4d) Cleanup orphan zip.claude.zip + docs.zip lỡ tay vào commit B6 (git add -A). Untrack + add *.zip rule .gitignore.

Stats final Session 18: 25 mig (+1), 58 DB tables (no new — Mig 25 chỉ ALTER cột), ~141 endpoints (+1 PATCH), 33 FE pages, 81 test pass (no change — feature mới UAT defer test §7), 44 gotcha (+1 #44 silent 403). Memory +1 entry.

Defer Session 19+:

  • Contract V2 wire (Mig 26) — mirror PE pattern: thêm Contract.ApprovalWorkflowId + CurrentApprovalLevelOrder + ContractWorkflowService.ApproveV2Async + Workspace Select V2 trong ContractCreatePage. Pin V2 mặc định cho ContractType.
  • Phân quyền strict V2 — hiện loose UAT (mọi authenticated thấy mọi phiếu V2). List = Drafter + approver any-Step + Admin. Cũng giải quyết bug "/inbox loose trả phiếu Nháp" — sau khi BE filter strict, B1 FE filter có thể relax.
  • Drop legacy V1 (Mig 27 cleanup) sau khi không còn phiếu pin WorkflowDefinitionId (V1): drop WorkflowDefinitions + WorkflowSteps + WorkflowStepApprovers + drop deprecated columns RejectedAtStepIndex / RejectedFromPhase. Drop ApproveV1LegacyAsync branch trong Service.
  • Test V2 Service wire (defer khi UAT confirm + có sample data thật) — Domain test ApproveV2Async + match logic + TraLai entry → Cấp 1 reset.
  • Budget V2 wire (defer xa hơn — sau Contract V2)
  • Sample seed B — sau UAT có thể remove (admin đã tạo workflow thật), hoặc giữ làm fallback. Idempotent skip không clobber.
  • schema-diagram §17-21 Mig 18-21 vẫn chưa update (defer cron audit 2026-06-01)
  • Skill ef-core-migration frontmatter "21 migration" stale (thực 25). Defer cron audit 2026-06-01.
  • Skill dependency-audit-erp "26+/41 bẫy" stale (thực 44). Defer cron audit 2026-06-01.

Session 17 done (2026-05-08) — PE Workflow V2 schema + Service wire end-to-end (Mig 22-24, 13 commit c847dc0de0f38d)

User chốt sau Session 16 drastic refactor flat (Mig 21) vẫn chưa đúng intent. Yêu cầu schema riêng + Menu mới "Duyệt NCC (Mới)" — Quy trình > Bước (Phòng) > Cấp (NV cụ thể qua ApproverUserId). State machine 5 trạng thái với Trả lại = Phase RIÊNG (Option A user chốt diagram).

  • Mig 22 AddApprovalWorkflowsV2 — 3 entity ApprovalWorkflow/Step/Level + ApplicableType enum (DuyetNcc/DuyetNccPhuongAn/Contract). 3 CREATE TABLE + UNIQUE (Code, Version) + FK Cascade Step→Workflow + Level→Step + FK Restrict Department + ApproverUserId. DbInitializer +menu V2. Designer page /system/approval-workflows-v2/:typeCode ~480 LOC. (c847dc0/f6047d5/2781c7e/12daa7f)

  • Designer iter 2 đúng intent: max 3 cấp × N NV/cấp + sequential gating C2/C3 disabled khi prev empty + filter NV theo Phòng + no-dup same level. Validator BE Order∈{1,2,3} + HaveSequentialOrders + HaveNoDuplicateApproverInSameLevel. (9712778 iter 1 sai → f3bea3c iter 2 đúng)

  • State machine 5 trạng thái Nháp / Đã gửi duyệt / Trả lại / Từ chối / Đã duyệt. TraLai = Phase RIÊNG (98), KHÔNG revert DangSoanThao + KHÔNG jump-back step. Drafter từ TraLai sửa+gửi lại chạy LẠI từ Cấp 1 Bước 1. ContractPhase + BudgetPhase +TraLai. PE/Contract/Budget Policy + Service Reject branch trỏ → TraLai. RejectedAtStepIndex/RejectedFromPhase deprecated (giữ DB column). 4 test mới TraLai entry point. FE rename "Bản nháp" → "Nháp". (ff21120)

  • Mig 23 AddApprovalWorkflowIdToPurchaseEvaluation — pin V2 vào PE entity. CreatePurchaseEvaluationCommand +Validate ApplicableType match PE.Type. UpdateDraft cho phép sửa Phase=Nháp/TraLai. Workspace Select bắt buộc workflow lúc create + display "QT-DN-V2-001 v01 — Tên (đang áp dụng)". (0a40c65)

  • Mig 24 AddCurrentApprovalLevelOrderToPe + Service V2 wire. PE Service branch theo ApprovalWorkflowId set or null: V2 ApproveV2Async group Levels by Order = Cấp (OR-of-N approvers cùng cấp), match actor.Id ∈ ApproverUserId, advance levelOrder++ → idx++ + reset levelOrder=1 → DaDuyet. V1 ApproveV1LegacyAsync giữ logic cũ. Synthetic Policy ForV2Schema() cho FE nextPhases. (b41484b)

  • UX V2-aware disable button + banner. DTO CurrentApproval + ApprovalFlow (full Steps/Levels Status Done/Current/Pending). Banner emerald "Đến lượt bạn" / amber "Không phải lượt bạn — chỉ {NV X / Y} duyệt được". Button Duyệt forward disabled khi non-approver + tooltip. Trả lại + Từ chối vẫn enabled. Inbox V2-aware ResolveV2InboxIdsAsync. 2 dropdown filter "Quy trình" + "Trạng thái" (chỉ ở Duyệt). Panel 3 thay 4 phase cards bằng flow workflow thực tế. (d814429/9e63e2d/d250ae4/74745a7/de0f38d)

  • Test setup: SQL clean-transactional-uat.sql clean prod (9 PE + 11 HĐ + 19 Notif xóa) giữ master via SSH VPS. Test user nv.test@solutions.com.vn/TestUser@123456 (Drafter, CCM) tạo qua API admin. (ac41d5e)

Stats final Session 17: 24 mig (+3), 58 DB tables (+3), ~140 endpoints (+5), 33 FE pages (+1 Designer V2), 81 test pass (+4 TraLai entry point Domain).

Defer Session 18+:

  • Contract V2 wire (Mig 25) — mirror PE pattern: thêm Contract.ApprovalWorkflowId + CurrentApprovalLevelOrder + ContractWorkflowService.ApproveV2Async + Workspace Select V2 trong ContractCreatePage
  • Phân quyền strict V2 — hiện loose UAT (mọi authenticated user thấy phiếu V2). List chỉ Drafter + approver any-Step + Admin
  • Drop legacy V1 sau khi không còn phiếu pin WorkflowDefinitionId: drop tables + cleanup migration drop RejectedAtStepIndex/RejectedFromPhase columns
  • Admin role bypass decision prod — option C có audit log "[Admin override]" nếu cần (hiện UAT bypass không log riêng)
  • Test V2 Service wire (defer khi UAT confirm + có sample data) — Domain test cho ApproveV2Async match logic
  • Budget V2 wire (defer xa hơn — sau Contract V2)

Session 16 done (2026-05-08) — DRASTIC REFACTOR flat workflow Phòng × Cấp (Mig 21, 2 commit Chunk A+B)

User chốt drastic refactor: bỏ phase enum hoàn toàn, dùng ChoDuyet=10 đơn nhất + currentStepIndex tracking. Workflow flat list (Phòng × Cấp × Approvers). Pin WorkflowDefinitionId. Per memory feedback_drastic_refactor_scope.md: dedicated session + conservative buffer.

  • Chunk A (dbb0089) All BE — Domain enum simplify (ChoDuyet=10, legacy 2-6+98 deprecated giữ data cũ) + WorkflowStep +DepartmentId/PositionLevel + PE/Contract +CurrentWorkflowStepIndex/RejectedAtStepIndex + drop InnerStep entity/nav (PE+Contract) + drop *DeptApproval.InnerStepId + EF Configurations restore simple unique non-filtered + DbContext drop DbSets. Migration 21 RefactorWorkflowToFlatModel GỘP (4 ALTER cols PE/Contract + 2 ALTER WorkflowStep + DROP TABLE × 2 + DROP COLUMN InnerStepId × 2 + restore simple unique × 2). Service rewrite TransitionAsync flat logic (Drafter trình → init idx=0, advance idx per approve, last step → DaDuyet/DaPhatHanh, Trả lại save RejectedAtStepIndex, Resume jump-back, Match approver Dept+PositionLevel OR Approvers Role/User). App CQRS DTOs simplified. Tests DROP PeNStageApprovalTests + ContractNStageApprovalTests + PeTwoStageApprovalTests (19 test legacy). UPDATE PeWorkflowAdminTests signature. 96 → 77 test pass. 3-file rule Mig 21 commit đủ.

  • Chunk B (88a5be1) FE Designer — PeWorkflowsPage + WorkflowsPage rewrite (~210 LOC each): drop InnerStep types + PHASE_OPTIONS, auto-assign ChoDuyet=10, step UI Tên + Phòng Select + Cấp Select + SLA + Approvers Role/User optional fallback, drop InnerSteps sub-section, DefinitionCard view badge Phòng/Cấp. types/purchaseEvaluation.ts (fe-admin + fe-user mirror) + ChoDuyet=10 enum + label "Đang duyệt" + color amber. KHÔNG đụng PeWorkflowPanel (Chunk C SKIP — existing UI compatible).

  • [⊘] Chunk C (FE PeWorkflowPanel + workflow timeline) SKIP — existing UI dùng workflow.nextPhases BE-driven, 3-button Trả lại/Từ chối Session 14 reuse với target=DangSoanThao/TuChoi pattern. KHÔNG cần đụng.

Defer Session 17+:

  • UAT live test workflow flat (3 phòng × N cấp setup)
  • Old PE/HĐ data migration (pinned legacy workflow phase 2-6 stuck) — admin manual transition hoặc data migration script
  • Sample data seed N-stage (block DesignTime vs Runtime DB)
  • Budget N-stage (cần versioned WF migration)
  • schema-diagram §17-21 update (cron audit 2026-06-01)
  • Skill ef-core-migration + contract-workflow refresh (cron audit)
  • Tests cho flat workflow flow (làm khi UAT bug)

Session 15 done (2026-05-07) — Tooltip diagnose "Lưu & Gửi Duyệt" + drastic refactor flat workflow DEFER (1 commit)

User UAT live báo button "Lưu & Gửi Duyệt" KHÔNG hoạt động + suy đoán "trùng ID". Diagnose: silent disabled khi nextPhases không có forward phase. Add tooltip + dialog warning. "Trùng ID" KHÔNG phải bug FE.

  • Tooltip diagnose (commit 835cc7f) — fe-admin + fe-user PeDetailTabs: compute forwardPhase once + submitDisabledReason reason string + button title attribute hover + dialog confirm show forward phase label explicit. Build pass × 2. KHÔNG đụng BE.
  • [⏸] Drastic refactor flat workflow — User chốt "bỏ phase enum hoàn toàn, dùng ChoDuyet=10 đơn nhất + currentStepIndex tracking". Attempt edit working tree 12 file Domain/Configurations/DbContext, realize scope realistic ~8-10h (PolicyRegistry + Service + App CQRS + 12 tests + FE Designer + Migration 21 + Docs) vượt session. REVERT working tree về 835cc7f clean. Defer Session 16+ dedicated session.

Decision memorized: add memory feedback_drastic_refactor_scope.md — drastic refactor cần dedicated session với context fresh, scope estimation conservative (2x buffer), tránh mid-session big refactor (risk session context deep + breaking states giữa chunk).

Defer Session 16+:

  • Drastic refactor flat workflow (Mig 21, ~8-10h, dedicated session) — flat WorkflowStep với DepartmentId+PositionLevel, drop InnerStep, PE/Contract CurrentWorkflowStepIndex tracking, Phase enum simplify ChoDuyet=10, Service rewrite, Designer FE rewrite.
  • Hoặc fallback Approach Y — FE Designer flat UI giới hạn 5 phòng (auto-assign Phase behind scenes), ROI 1-2h, KHÔNG drastic.
  • Task 2 sample data seed N-stage (block trên DesignTime vs Runtime DB)

Session 14 done (2026-05-07) — PE 3-button workflow Duyệt/Trả lại/Từ chối (1 commit)

User chỉ thị thay 2-button approval (Duyệt + Reject mơ hồ) bằng 3 hành động rõ:

  • Duyệt = forward

  • Trả lại = về DangSoanThao + Drafter sửa (smart reject Mig 16 + clear N-stage rows + Drafter resume jump-back)

  • Từ chối = Phase=TuChoi, phiếu khoá vĩnh viễn (17 handler Mig 16 lock edit)

  • Domain PurchaseEvaluationPolicy.cs — NccOnly + NccWithPlan thêm (X → TuChoi) transition cho mọi phase trung gian + FromDefinition expand step (trừ DangSoanThao) thêm (step.Phase → TuChoi).

  • Service PurchaseEvaluationWorkflowService.TransitionAsync — Reject branch tách 2 case: target=TuChoi giữ nguyên (no override / no RejectedFromPhase / no N-stage clear). target khác (DangSoanThao) → smart reject pattern.

  • FE PeWorkflowPanel (admin + user mirror) — render 3 button "✓ Duyệt → X" / "← Trả lại" / "✗ Hủy / Từ chối" + decision logic + dialog confirm với warning red (Cancel) / amber hint (SendBack).

  • Tests — rename Reject test target TuChoi→DangSoanThao + NEW Reject_To_TuChoi_Locks_Permanently + update NStage_Reject_Clears target. 95 → 96 test pass.

Defer Session 15+:

  • Task 2 sample seed N-stage (block trên DesignTime vs Runtime DB gotcha + API exit sớm khi DbInitializer seeding).
  • Phase TraLai = 98 enum orphan — có thể remove migration nếu cleanup, ko gây hại.

Session 13 done (2026-05-07) — Mirror N-stage Contract (Mig 20, 5 commit per-chunk + skip Chunk E auto-bind)

User chỉ thị mirror N-stage từ PE sang Contract. Budget defer (cần migration AddBudgetVersionedWorkflow trước — hardcoded BudgetPolicy.Default chưa có WorkflowDefinition entity). Pattern reusable đầy đủ từ PE.

  • Chunk A (951ffa3) Domain entity WorkflowStepInnerStep (Domain/Contracts/) + nav WorkflowStep.InnerSteps + ALTER ContractDeptApproval.InnerStepId + EF config FK Cascade Step / Restrict Dept+InnerStep + Migration 20 AddContractWorkflowInnerStepsAndAlterDeptApprovalUnique GỘP 1 (CREATE TABLE WorkflowStepInnerSteps + ALTER InnerStepId + DropIndex old + Recreate filtered legacy WHERE InnerStepId IS NULL + new filtered N-stage WHERE InnerStepId IS NOT NULL).
  • Chunk B (04cf2a0) Application CQRS DTO mirror PE Chunk B — WorkflowStepInnerStepDto + extend WorkflowStepDto + CreateWorkflowStepInnerStepInput + extend CreateWorkflowStepInput (default null backward compat) + Validator child rules + Handler atomic batch insert.
  • Chunk C (e247b67) ContractWorkflowService refactor mirror PE — load InnerSteps eager + reject branch clear N-stage rows + dept block split hasInnerSteps→N-stage logic / else→legacy 2-stage. N-stage flow giống PE: match firstPending Order asc + (exact level OR canBypass + level≥), exact upsert / bypass batch upsert, recheck stillPending → BLOCK.
  • Chunk D (7c0772a) ContractNStageApprovalTests 6 test mirror PE pattern + helper SeedWorkflowDefinitionAsync 2 step adjacent (DangGopY + DangDamPhan) + SeedContractAsync với Project + Supplier + FakeChangelogService + FakeContractCodeGenerator stubs. Bug fix legacy fallback test: switched phase pair sang DangKiemTraCCM → DangTrinhKy + role CostControl khớp Standard.Transitions. 89→95 test pass.
  • Chunk E SKIP — WorkflowsController auto-bind [FromBody] CreateWorkflowDefinitionCommand record qua JSON, no code change cần.
  • Chunk F (current) FE WorkflowsPage Designer extend mirror PeWorkflowsPage Chunk F: InnerStepDto + EditInnerStep types + copyFromDefinition include + departmentsList query + sub-section "Cấp duyệt nhỏ trong phòng" drag-list + button "+ Thêm cấp duyệt" emerald + payload include Order asc. Empty state hint fallback 2-cấp legacy. KHÔNG đụng fe-user (admin-only).

Backward compat 100%: workflow Contract no InnerSteps configured → service fallback legacy 2-stage Mig 16. Data legacy InnerStepId=null vẫn enforce unique cũ qua filtered index.

Defer Session 14+:

  • Budget N-stage — cần migration AddBudgetVersionedWorkflow trước (4 bảng + ALTER Budget.WorkflowDefinitionId), sau đó migration AddBudgetWorkflowInnerSteps. User quyết riêng (feature mở rộng module lớn).
  • schema-diagram.md §17 Mig 20 update — defer cron audit 2026-06-01.
  • Skill ef-core-migration row Mig 20 — defer cron audit.

Session 12 done (2026-05-07) — N-stage workflow approval (Mig 18+19, 6 commit per-chunk, PE-only)

User yêu cầu: workflow level cha (= phase) cấu hình được level con (Phòng × Cấp NV/PP/TP) sequential, mỗi cấp = 1 inner step duyệt riêng, có bypass cùng dept. 6 spec defaults chốt + 6 chunk per-commit.

  • Chunk A (13ab533) Domain + Migration 18 AddPeWorkflowInnerStepsAndPositionLevel — enum PositionLevel (NV/PP/TP), entity PurchaseEvaluationWorkflowStepInnerStep + nav, User.PositionLevel int? + PEDeptApproval.InnerStepId Guid?. EF config FK Cascade Step / Restrict Dept+InnerStep. 3-file rule.
  • Chunk B (0e56bd0) Application CQRS DTO — PeWorkflowStepInnerStepDto + extend PeWorkflowStepDto + CreatePeWorkflowStepInnerStepInput (default null backward compat) + Validator child rules + Handler atomic batch insert + UserDto +PositionLevel + SetUserPositionLevelCommand mirror SetBypassReview pattern.
  • Chunk C (0c62e24) Service N-stage logic + Migration 19 AlterPeDeptApprovalsUniqueFilteredForInnerSteps (filtered unique legacy WHERE InnerStepId IS NULL + new N-stage WHERE InnerStepId IS NOT NULL). PurchaseEvaluationWorkflowService refactor — load InnerSteps eager, reject clear N-stage rows tại fromPhase, dept block split hasInnerSteps→N-stage / else→legacy 2-stage. N-stage: match firstPending (Order asc IsRequired) same dept + (exact level OR canBypass + level≥), exact upsert 1 row InnerStepId, bypass batch upsert NV+PP+TP cùng dept ≤ actor (audit IsBypassed cho cấp dưới), recheck stillPending → BLOCK + log "duyệt cấp X (còn Y pending)".
  • Chunk D (3d76c6b) Tests N-stage 6 test mới (FirstInner_NV_blocks / All_3_levels_sequential_pass / TP_bypass_skips_lower / Wrong_dept_403 / Reject_clears_rows / Legacy_fallback_no_inner) + IdentityFixture extend +positionLevel + helper SeedWorkflowDefinitionAsync 2 step adjacent. 83→89 test pass.
  • Chunk E (83ffabd) API PATCH /users/{id}/position-level mirror SetBypassReview + body {positionLevel:int?} + Authorize Users.Update.
  • Chunk F (current) FE-Admin types/users.ts + positionLevel field + PositionLevel const + Label/Short maps. PeWorkflowsPage Designer extend InnerStep DTO + EditInnerStep type + sub-section "Cấp duyệt nhỏ trong phòng" drag-list { Phòng × Cấp + required } + button "+ Thêm cấp duyệt" emerald + departmentsList query + payload include. UsersPage column "Cấp" badge NV/PP/TP emerald + action button cycle null→1→2→3→null. KHÔNG đụng fe-user (admin-only).

Backward compat 100%: workflow no InnerSteps configured → service fallback legacy 2-stage Mig 16. Data legacy rows InnerStepId=null vẫn enforce unique cũ qua filtered index.

Defer Session 13+:

  • Mirror Contract + Budget N-stage (sau khi UAT PE 2-3 tuần ổn). Pattern lặp lại Domain entity + Service logic + Tests reusable từ PE.
  • Seed/migrate User.PositionLevel cho 30 demo user (hiện chỉ admin set qua UsersPage cycle).
  • schema-diagram.md §15 Mig 18 + §16 Mig 19 update (defer cron audit 2026-06-01 — small drift).
  • Skill ef-core-migration row Mig 18+19 (defer cron audit).
  • Skill contract-workflow N-stage cross-ref section (defer cron audit).

Session phase 2 done (2026-05-08 00:30) — B12-B14 PE detail polish iterate (3 commit FE-only)

User UAT iteration tiếp sau wrap-up 6e7a6db. Áp rule strict verify khi rename/remove (lesson hotfix CI).

  • B12 (378c993) — "Lưu" no-close + "Xóa phiếu" red bottom (CHỈ Bản nháp soft-delete) + bỏ header bar workspace "Sửa header"/"Xóa"/"Đóng" + Section 4 column header s.supplierName + Section 3 chặn xóa NCC khi có quotes
  • B13 (e320027) — InfoTab useEffect re-trigger edit khi pencil click phiếu khác + sync values + Pencil "sáng lên" active state (bg-brand-100 + ring) khi editingRowId === p.id + wire editingRowId từ Workspace → PeListPanel
  • B14 (d2306b8) — QuoteDialog bỏ checkbox isSelected (consolidate winner ở Section 2.a) + winner column Section 4 LUÔN highlight emerald (header prefix + cells full column) + QuoteDialog full overlay loading + spinner + NccSelectorRow inline spinner "Đang chọn NCC + sync cột giá Section 4…"

Verify: npm run build × 2 app pass · dotnet test 83 pass · push OK.

Session S10-11+++++++ done (2026-05-07) — PE Workspace UX overhaul đầy đủ (23 commit)

User UAT live mode iterate liên tục. Áp rule feedback_uat_skip_verify (memory): skip dotnet test + npm build sau mỗi chunk, push ngay. Lesson hotfix CI 0ae3fe2: rename/remove → BẮT BUỘC npm run build 1 lần trước commit.

11 batch deliverable (chi tiết narrative đầy đủ xem STATUS.md Recently Done row đầu tiên + session log 2026-05-07-2359-pe-workspace-ux-overhaul.md):

  • B1 (S10) PE Thao tác 2-panel workspace mirror HĐ Thầu phụ pattern (4 commit ee0d360d04bd88)
  • B2 (S11) Migration 17 AddManualBudgetFieldsToPeAndContract — 4 cột manual budget cho PE + HĐ + App CQRS + FE (5 commit ecd5f7ebf17740)
  • B3 (S11+) BudgetFieldRow inline editor Section 2.b — toggle + Select OR 2 input + auto-detect mode (3 commit 19712d87f38c02)
  • B4 (S11++) InfoTab inline edit Section 1 + PeListPanel pencil hover + URL ?editHeader=1 (3 commit 5a89dd2cb0598d)
  • B5 (S11+++) Workspace "new" sectioned create view 5 sections + LockedHint S3-5 (1 commit 66fa469)
  • B6 (S11++++) Pe_*_List Danh sách disable toàn bộ tương tác (2 commit 7dfeb1a+a1665ee)
  • B7 (S11+++++) Workspace "new" lock Loại quy trình theo URL + Select preset Điều khoản TT (1 commit 18ebfa1)
  • B8 (S11++++++) PE Display status meta — Bản nháp / Đã gửi duyệt / Đã duyệt / Từ chối (1 commit 0c5db13)
  • B9 (S11+++++++) Phase TraLai = 98 + pencil always visible + edit gating + editableOnly filter (1 commit d15398f)
  • B10 (hotfix CI) TS errors forcedPhase rename + unused PurchaseEvaluationType import (1 commit 0ae3fe2)
  • B11 (last) PE detail polish — NCC selector dropdown + Section 3 winner protect + Bottom action bar Lưu/Gửi Duyệt (1 commit 4c0625c)

Defer cho Session 12+ (cần explicit UAT trigger):

  • Workflow transition vào TraLai — BE workflow service chưa wire button "Trả lại" cho approver. FE đã ready accept.
  • BE multi-phase filter param ?phases=2,3,4,5,6 — cho FE display status "Đã gửi duyệt" precision filter.
  • Section 5 Opinion sign trong Duyệt mode — verify nếu UAT user cần sign opinions ở leaf "Duyệt" (hiện code path opinionsReadOnly = readOnly khi mode='detail').

Session 11 done (2026-05-07) — Migration 17 manual budget fields PE + HĐ

(Note: Session 11 + 11+ + 11++ + ... đã merge vào batch S10-11+++++++ ở trên — đây là sub-row chronological, KHÔNG cắt narrative cũ.)

Session 9 done (2026-05-04) — Chunk E-bis complete (FE 2-stage + HĐ/Budget mirror + 6 test)

User chỉ thị "làm hết cho xong tính năng luôn" sau Session 8 close bug fix anh Kiệt phía BE PE. Session 9 đóng toàn bộ pending Chunk E-bis (defer từ session 8).

  • Chunk E2 — FE Workflow Panel PE hiển thị progress 2-stage timeline per phase × dept (commit f8eebd5). Component DeptApprovalsSection group by phase × dept, highlight amber khi current phase có Review nhưng chưa Confirm, badge fuchsia "bypass" khi NV.CanBypassReview. Cả fe-admin + fe-user (rule §3.9).
  • Chunk E3 — FE UserManager toggle CanBypassReview (commit 4380bdc). UserDto BE thêm field CanBypassReview. UsersPage column "Bypass" + button ShieldCheck (icon highlight fuchsia khi enabled). Endpoint backend đã có sẵn từ Session 8 Chunk E1. fe-user KHÔNG có UsersPage (admin-only).
  • Chunk E4 — HĐ 2-stage logic mở rộng (commit b6f5a16). ContractWorkflowService thêm UserManager<User> DI + mirror toàn bộ logic 2-stage từ PE service (sau policy guard, trước gen mã HĐ). ContractDepartmentApprovalFeatures.cs (List query mirror PE pattern). Endpoint GET /contracts/{id}/department-approvals. FE WorkflowHistoryPanel section "Tiến trình duyệt 2-cấp phòng ban" insert giữa WorkflowSummaryCard và Lịch sử duyệt.
  • Chunk E5 — Budget 2-stage logic mở rộng (commit 1fc439b). TransitionBudgetCommandHandler thêm INotificationService + IDateTime DI + mirror 2-stage logic. BudgetDepartmentApprovalFeatures.cs + endpoint. FE BudgetWorkflowPanel section "Tiến trình duyệt 2-cấp phòng ban". Note: low-priority cho Budget (ít user duyệt budget per dept) nhưng giữ consistent UX 3 module.
  • Chunk E6 — 6 test 2-stage + IdentityFixture helper (commit 8353fe8). IdentityFixture (Common/) setup ServiceProvider với Identity stack đầy đủ — DbContext SQLite shared connection + AddIdentityCore + AddRoles + AddEntityFrameworkStores. Single shared scope cho fixture lifetime đảm bảo DbContext + UserManager đồng instance. Helper CreateUserAsync(email, name, deptId, roles, canBypassReview) reusable. 6 test PeTwoStageApprovalTests: NV_Review_Blocks_Phase_Transition (đóng bug anh Kiệt — test chính xác) / TPB_Confirm_After_NV_Review_Allows_Transition / NV_With_BypassReview_Allows_Transition_With_IsBypassed_True / Admin_Skips_TwoStage_Logic_Entirely / Reject_Sets_RejectedFromPhase_And_Forces_DangSoanThao / Resume_After_Reject_Jumps_Back_To_RejectedPhase. Tests Contract + Budget 2-stage skipped — logic identical PE, ROI thấp; pattern reusable nếu UAT phát hiện regression riêng. Total 77→83 test pass.

Stats sau session 9:

  • BE LOC: ~13750 → ~14400 (+650, gồm Contract + Budget 2-stage logic + 2 List feature + Test fixture)
  • API endpoints: ~131 → ~133 (+2 List dept-approvals HĐ/Budget)
  • Tests: 77 → 83 (+6 PE 2-stage)
  • Schema không đổi (Migration 16 đã có sẵn từ session 8)
  • 5 commit per-chunk pushed → 1 CI run trigger qua HEAD = 8353fe8

Pending còn lại Phase 9: chỉ Hard blockers Ops (UAT thật / SMTP / Rotate creds / SQL backup). Feature 2-stage đầy đủ.

Session 8 done (2026-05-04) — Migration 16: 2-stage dept approval + smart reject + lock edit

Bối cảnh: Anh Kiệt (FDC) báo bug PE workflow: NV.PRO tạo phiếu → duyệt được hết phase. Phân quyền sai vì policy chỉ check role, không check Stage 2-cấp.

3 ràng buộc gộp 1 migration:

  • Lock edit khi Phase != DangSoanThao — 17 handler thêm guard (Contract Detail × 15 qua helper EnsureContractType, PE Detail × 5 qua helper mới PurchaseEvaluationDraftGuard, Budget Detail × 3 inline). KHÔNG lock Comment + Attachment + Opinion (workflow design intent).

  • Smart reject + ResumeDecision=Rejectentity.RejectedFromPhase = currentPhase + force targetPhase=DangSoanThao. Resume: Drafter trình từ DangSoanThao + RejectedFromPhase != null → jump tới phase đã reject + clear field. Bypass policy guard ở resume.

  • 2-stage dept approval (PE only v1) — User.DepartmentId != null + role guard:

    • DeptManager (TPB) → Stage=Confirm trực tiếp
    • User.CanBypassReview=true → Stage=Confirm + IsBypassed=true
    • Else (NV) → Stage=Review only, BLOCK transition cho đến khi TPB confirm
    • Schema: 3 bảng *DepartmentApprovals UNIQUE (TargetId, Phase, Dept, Stage)
  • Migration 16 AddTwoStageDeptApprovalAndSmartReject — 4 ALTER + 3 CREATE TABLE + 12 indexes + FK Cascade

  • Endpoint mới: GET /api/purchase-evaluations/{id}/department-approvals (List), PATCH /api/users/{id}/bypass-review (toggle)

  • Notify TPB cùng dept khi NV review (best effort, fail non-critical)

  • Verify: Build pass + 77 test pass + Migration applied LocalDB OK + schema verified qua sqlcmd

  • 5 commit per-chunk: 5fe61cc (A) · 14f3c9f (B) · 9747f8c (C) · a532ba6 (D) · current (E1)

Session log: 2026-05-04-1230-chot-session-8-2-stage-dept-approval.md.

Pending Chunk E-bis TẤT CẢ DONE ở Session 9 (xem section trên):

  • FE Workflow Panel hiển thị progress 2-stage timeline (E2 — PE) + HĐ (E4) + Budget (E5)
  • FE UserManager toggle CanBypassReview checkbox (E3)
  • HĐ 2-stage mở rộng (E4)
  • Budget 2-stage mở rộng (E5)
  • Tests 2-stage logic Service-layer (E6 — 6 test PE + IdentityFixture)

Session 6 done (2026-04-30 — pure docs work)

  • MD audit + compact — STATUS -27%, HANDOFF -32%, migration-todos -35%, archive 51 row Phase 0-7 cũ
  • 3 skill refreshform-engine Phase 2 MVP → Tier 3 feature-complete, permission-matrix 12 menu → ~60 + inheritance roots, ef-core-migration 24 DbSet → 52 bảng
  • Rule mới rules.md §7 — Khi nào viết test (timing rule 5-row table)
  • Rule mới rules.md §6.4 — Audit + compact MD định kỳ (cadence + checklist + anti-pattern)
  • rules.md §9.4 — Mở rộng skill audit cross-ref §6.4

Session 9+ housekeeping done (2026-05-04 — sau Session 9 close)

  • Audit định kỳ 2026-05 — combined skill + doc drift (commit 7dc0233). Log skill-audit-2026-05.md.
  • Optional polish — fe-user Inbox PE section (commit 332a90f). HĐ + PE 2 section trong InboxPage.
  • User Manual 7 file rewrite compact (commit 16c2c9c). End-user style: bỏ field/error tables, giữ numbered steps đơn giản. ~86 KB total.

Session 11 done (2026-05-07) — Migration 17 manual budget fields PE + HĐ

User feedback: PE/HĐ link Budget Select chỉ Phase=DaDuyet → user phải break flow tạo Budget approved trước. Solution: toggle "Nhập tay" + 2 input field fallback (Tên text + Số tiền number) lưu trên entity, KHÔNG cần Budget entity. Mirror logic PE ↔ HĐ (Q3 chốt).

  • Chunk 1 Domain+Infra (commit ecd5f7e) — Migration 17 AddManualBudgetFieldsToPeAndContract 4 ALTER + 2 entity property + 2 EF config (HasMaxLength + HasPrecision). Applied LocalDB. 3-file rule.
  • Chunk 2 App CQRS (commit 0f7901c) — Create/Update PE + Contract commands + Validator (>=0 when has value) + Handlers + DTO + diff log audit + CreateContractFromEvaluation carry forward.
  • Chunk 3 FE-Admin (commit bab5031) — types +2 field, PeHeaderForm toggle + 2 input + payload conditional, PeDetailTabs Section "b. Ngân sách" fallback display + badge "nhập tay", refactor PurchaseEvaluationCreatePage wrap PeHeaderForm DRY (222→30 LOC), ContractCreatePage NewForm + EditForm cùng pattern + read-only branch khi !isDraft.
  • Chunk 4 FE-User mirror (commit 14f8d9d) — 6 file y hệt content (rule §3.9).
  • Chunk 5 Docs (commit current) — STATUS row + HANDOFF TL;DR Session 11 + session log 2026-05-07-2300-pe-hd-manual-budget-mig17.md.
  • Verify: dotnet build + 83 test pass mỗi chunk · npm build fe-admin + fe-user pass · LocalDB migration applied.
  • KHÔNG đụng Budget entity / Phase=DaDuyet validation (giữ invariant). Manual fields chỉ là fallback display/note, KHÔNG join với Budget.Details cho per-row comparison ở PE matrix Section 4.

Session 10 done (2026-05-07) — PE "Thao tác" 2-panel workspace

User chỉ thị restructure menu PE: leaf "Thao tác" (Pe_*_Create) từ page Create header riêng /new sang workspace 2-panel mirror pattern HĐ Thầu phụ ContractCreatePage. Spec chốt 5 câu trước code (xem session log đầy đủ rationale).

  • Chunk 1 fe-admin (commit ee0d360) — PeListPanel.tsx (~180 LOC pure picker reuse + sticky "+ Thêm mới") + PeHeaderForm.tsx (~210 LOC extract) + PurchaseEvaluationWorkspacePage.tsx (~120 LOC 2-panel). PeDetailTabs thêm prop mode?: 'detail' \| 'workspace' + Section 5 hint amber + force opinionsReadOnly. Layout resolver remap. App.tsx route mới.
  • Chunk 2 fe-user mirror (commit ecf3c59) — 6 file y hệt content (rule §3.9 duplicate có chủ đích).
  • Chunk 3 docs (commit 7e3cfa5) — STATUS Recently Done + HANDOFF TL;DR Session 10 + session log 2026-05-07-2100-pe-workspace-2panel.md. KHÔNG update skill (per §9.5 — không drift đáng audit, FE pure refactor).
  • Verify: 2 build (fe-admin + fe-user) pass + dotnet test 83 pass mỗi chunk. Route /new cũ giữ tồn tại cho deep-link "Sửa header" button.
  • KHÔNG đụng BE / migration / schema / endpoint / test count.

A. Hard blockers (chờ user / ops) — Plan C1 status S32 2026-05-26

  • UAT thật 1 tuần với 2-3 user (30 demo: 16 sample + 14 Solutions thật) — anh main coordinate
  • SMTP config → Email outbox — BLOCKED chờ anh main cấp host/user/pass + appsettings.Production.json update
  • Rotate credentials (admin + 30 demo + SA + vrapp + JWT secret + Gitea runner token) — BLOCKED chờ anh main approve cycle plan
  • Schedule SQL backup daily Task Schedulerscripts/backup-sql.ps1 READY. Anh main register Task Scheduler trên VPS qua: ssh vietreport-vps "Register-ScheduledTask -TaskName SolutionErpBackupDaily -Trigger (New-ScheduledTaskTrigger -Daily -At 2am) -Action (New-ScheduledTaskAction -Execute powershell.exe -Argument '-File C:\solution-erp\scripts\backup-sql.ps1 -Server .\SQLEXPRESS')"

B. PE feature gap còn lại

  • Export phiếu PDF/Excel — IDocumentConverter + template PE-TrinhDuyet.docx (user pending — không quan trọng lắm)

C. Optional polish (làm khi UAT phát sinh)

  • Budget MaNganSach atomic sequence + migration AddBudgetCodeSequences
  • Budget versioned workflow + migration AddBudgetVersionedWorkflow
  • Payment terms PE tách field (JSON → 6 column)
  • Auto-map PE Details → Contract Details khi gen HĐ
  • Matrix Quotes bulk paste từ Excel
  • fe-user Inbox thêm section "Phiếu Duyệt NCC chờ tôi" — done 2026-05-04 (commit 332a90f). useQuery thứ 2 cho /pe/inbox + Panel 1 chia 2 section sticky header. Click PE → navigate /purchase-evaluations/:id (page riêng).

D. Tests Phase 3-5 (làm khi gặp bug recurring để justify ROI)

  • Phase 3 — Application handler tests (CQRS + EF InMemory) ~15 test
  • Phase 4 — API smoke tests (WebApplicationFactory) ~7 test
  • Phase 5 — FE Vitest cho lib utility (queryMatches, fmtMoney) ~10 test

D-Bis. Plan B-Wrap — Contract V2 test bundle (defer dedicated session ~2h post-S32 chốt anh main)

Trigger: S29 Plan B Contract V2 wire deploy prod 4 CI Runs PASS nhưng ContractWorkflowService.ApproveV2Async ~227 LOC NO test cover (UAT mode skip per feedback_uat_skip_verify). Risk gotcha #48 high (Service refactor > 100 LOC touching audit + changelog paths). Anh main chốt defer dedicated session post-Phase 9 stabilize.

Test infra dependencies (NEW — chưa có precedent từ PE):

  • TestApplicationDbContext SQLite existing reuse
  • IdentityFixture existing reuse
  • FixedDateTime existing reuse
  • NoOpNotificationService existing reuse
  • 🆕 NoOpChangelogService mock OR use real ChangelogService với TestApplicationDbContext
  • 🆕 TestContractCodeGenerator mock (return predetermined HD-TEST-001) OR real với ContractCodeSequences seeded
  • 🆕 SeedContractAsync helper + SeedContractWorkflowAsync helper + SeedSupplierAndProjectAsync helper

File new test class: tests/SolutionErp.Infrastructure.Tests/Services/ContractWorkflowServiceApproveV2Tests.cs (mirror PurchaseEvaluationWorkflowServiceReturnModeTests.cs structure)

BW1 — ApproveV2Async happy path step advance (Cấp 1 → Cấp 2 cùng Bước)

  • Setup: 1 Step + 2 Levels OR-of-N + 2 approver
  • Approver Cấp 1 TransitionAsync(Approve) → expect contract.CurrentApprovalLevelOrder = 2 + Phase giữ ChoDuyet + SlaDeadline reset 7 ngày + ContractApproval row added + ContractLevelOpinion UPSERT Comment + LogTransition "Hoàn tất Cấp 1, sang Cấp 2 cùng Bước 1"

BW2 — ApproveV2Async terminal (Cấp cuối Bước cuối → DaPhatHanh + gen mã HĐ)

  • Setup: 1 Step + 1 Level + 1 approver + Supplier(SUP-001) + Project(PRJ-001)
  • Approver TransitionAsync(Approve) → expect contract.Phase = DaPhatHanh + contract.MaHopDong != null (gen via IContractCodeGenerator.GenerateAsync) + contract.CurrentWorkflowStepIndex = null + contract.CurrentApprovalLevelOrder = null + ContractApproval row + ContractLevelOpinion final + LogTransition transition

BW3 — ApproveV2Async skipToFinal F2 (admin opt-in AllowApproverSkipToFinal per slot)

  • Setup: 3 Step × 2 Levels each + approver Cấp 1 Bước 1 với AllowApproverSkipToFinal = true
  • Approver Cấp 1 Bước 1 TransitionAsync(Approve, skipToFinal=true) → expect CurrentWorkflowStepIndex = 2 (Bước cuối) + CurrentApprovalLevelOrder = 2 (Cấp cuối) + Phase giữ ChoDuyet + LogTransition "[Approver skip thẳng tới Bước 3 Cấp 2..." + ContractApproval comment prefix "[Duyệt vượt cấp tới Cấp cuối]"

BW4 — ApproveV2Async ForbiddenException khi actor không trong pendingLevelGroup.ApproverUserId

  • Setup: 1 Step + 2 Levels OR-of-N với approver A, B + outsider C
  • Outsider C TransitionAsync(Approve) → expect ForbiddenException message "Bước 1 ... Cấp 1: bạn không có trong danh sách NV duyệt..."

BW5 — CreateContractCommand ApplicableType=Contract validation (Reviewer S29 MAJOR catch)

  • Test class mới tests/SolutionErp.Infrastructure.Tests/Application/CreateContractCommandApplicableTypeTests.cs
  • Setup: ApprovalWorkflow với ApplicableType = DuyetNcc (id=1, PE-only)
  • CreateContractCommand pin ApprovalWorkflowId trỏ workflow ApplicableType=1 → expect ValidationException "Workflow phải ApplicableType=Contract" (security catch — cross-module misuse)

BW6 — Mig 32+33 schema persistence test (ContractLevelOpinion UPSERT + UNIQUE composite)

  • Test class mới tests/SolutionErp.Infrastructure.Tests/Common/ContractV2SchemaPersistenceTests.cs
  • Setup: 1 Contract + 1 ApprovalWorkflowLevel
  • Add 2 ContractLevelOpinion cùng (ContractId, ApprovalWorkflowLevelId) → expect DbUpdateException (UNIQUE composite Mig 33)
  • Update existing Opinion via UPSERT pattern → expect 1 row only (mirror ApproveV2Async line 292-316)
  • FK Cascade test: delete Contract → ContractLevelOpinions auto-deleted (Restrict on ApprovalWorkflowLevel)

BW7 — ContractWorkflowService V1 fallback skipToFinal ConflictException

  • Setup: Contract V1 legacy (WorkflowDefinitionId pin, ApprovalWorkflowId = null)
  • Approver TransitionAsync(Approve, skipToFinal=true, isAdmin=false) → expect ConflictException "skipToFinal chỉ hỗ trợ HĐ V2 (ApprovalWorkflowsV2). HĐ V1 legacy không có per-Approver-slot flag."

Bundle review: 🟥 Reviewer pre-commit verify 7 test scenario + verify NO regression baseline 111 PASS. Post-commit 🟩 CICD Monitor verify Run PASS bundle baseline preserve.

Owner allocation: 👤 Chủ trì Solo helper methods + mock services (3 file) + 🟨 Implementer Case 2 cookie-cutter mirror PE pattern cho 7 test method skeleton (deterministic spec above) + 🟥 Reviewer pre-commit + 🟩 CICD verify.

E. Ops chưa xong — Plan C1 status S32 2026-05-26

  • Remove binding cũ .huypham.vn sau verify stable — manual cmd ssh vietreport-vps ; cd C:\solution-erp\scripts ; .\migrate-domains.ps1 -RemoveOld -SkipCert
  • win-acme cert status — cert api.solutions.com.vn notAfter=2026-07-23 (renewed 2026-04-24). Not urgent — auto-renewal ~2026-06-23 (30d before expire). STATUS.md note 2026-06-18 STALE (Plan F win-acme schedule task fix may have resolved silently). Re-verify auto-renew trigger date qua ssh vietreport-vps "Get-ScheduledTask -TaskName 'win-acme*' | Select State,LastRunTime,NextRunTime"

🔁 Skill governance (recurring)

Quy tắc: docs/rules.md §9. Audit định kỳ mỗi đầu tháng — workflow §9.4.

  • Setup ban đầu — 6 skill (3 domain + 3 ops), rules §9 ← 661f859
  • Audit 2026-05-01 — log docs/changelog/skill-audit-2026-05.md
  • Audit 2026-06-01
  • Audit 2026-07-01

Cron task solution-erp-skill-audit-monthly fire 9:00 AM ngày 1 mỗi tháng.

🚀 Phase 10 — Plan G: Port 11 module NamGroup → SOL (backlog defer sau Phase 9 stabilize)

Trigger: S32 anh main yêu cầu plan kỹ 11 module NamGroup (NHÂN SỰ + VĂN PHÒNG SỐ + CÁ NHÂN — khung đỏ screenshot 2026-05-26). 4 quyết định chốt anh main:

  1. Scope: FULL 11 module (3 nhóm — không subset)
  2. DB: Single schema dbo mở rộng Mig 34→43+ (no multi-schema, no separate DbContext)
  3. Reuse: Workflow Engine V2 (Mig 22-26) extend ApplicableType enum +5 values cho Đề xuất/Đơn từ/OT/Đặt xe/Ticket CNTT
  4. Rollout: Chunk per-module Plan riêng (10 Plan G-* atomic sprint ~3-5 ngày mỗi cái), aggressive multi-agent parallel ROI ~70%

Sequence chốt anh main S32: Tuần tự theo kế hoạch tốt nhất — Phase 9 UAT stabilize trước → Phase 10.1 kick off. KHÔNG rush parallel với Phase 9. Timeline target: ~3 tháng (T6-T8/2026) realistic với multi-agent aggressive. G-P1 Chấm công scope: Pure web GPS check-in (KHÔNG máy vân tay/face recog hiện tại — anh chốt "tạm thời vậy trước"). G-H2 HrmConfig seed: Reference NamGroup demo seed (LeaveTypes/Holidays/Shifts/OtPolicy) — Investigator audit NamGroup DbInitializer + DataSeeder lúc G-H2 kick off.

📐 Reference findings từ NamGroup audit S32

NamGroup pattern Decision SOL
TblNhanVien* 8+ bảng (QtCongTac/QtDaoTao/QuanHeThanNhan/KyNangViTinh/...) Giữ structure deep — 1 main + N satellites (EmployeeProfile family)
SoDoToChuc/SoDoKhoi/ChucDanh/ViTri 4 bảng org chart Tận dụng SOL Department + User.Position + PositionLevel — skip 3 bảng SoDo redundant
Tbl* Vietnamese table naming + Repository pattern .NET FW 4.0 Reject — giữ SOL Clean Arch + Entity PascalCase English + IApplicationDbContext
WF approval ad-hoc per module Reject — reuse ApprovalWorkflow V2 extend enum +5 values
Announcement/InternalDocument/Menu flat tables Adapt — reuse SOL MenuItem tree + Notification + Attachment infra

Phase 10.1 — Foundation HRM (UNBLOCK toàn bộ Phase 10 sau)

Plan G-H1 — Hồ sơ nhân sự CRITICAL FIRST (depend by 8/11 module sau) — DONE S33

  • 🟦 Investigator pre-flight audit NamGroup TblNhanVien* 10 bảng (NOT 8) + map fields → SOL EmployeeProfile schema (S33 a103d20)
  • 👤 Chủ trì Solo design Mig 34 AddEmployeeProfiles schema (1 main + 5 satellite: WorkHistory/Education/FamilyRelation/Skill polymorphic Kind/Document — defer 3 HĐLĐ Plan H2) + 4 decision (5 satellite/Skill poly/DiaChi FK+freetext/NV/YYYY/NNNN code) (S33 em main)
  • 🟨 Implementer Case 2 cookie-cutter BE entity scaffold 7 entity (6 + EmployeeCodeSequence) + 7 EF Config + IEmployeeCodeGenerator + EmployeeCodeGenerator + IApplicationDbContext +7 DbSet + Mig 34 3-file rule (S33 a8f4567, 17 file mới + 4 modified)
  • 👤 Chủ trì Solo DbInitializer SeedDemoEmployeeProfilesAsync ~90 LOC mirror 33 user @solutions.com.vn + EmployeeCodeSequence row NV/2026 LastSeq=33, NOT gated DemoSeed flag per gotcha #51 (S33 em main commit 48a99e1)
  • 🟨 Implementer Case 2 BE CQRS 5 pair (Create/Update/Delete/Get/List) + EmployeesController 5 REST endpoint + Dtos 5 satellite (S33 a9bb9f3, 3 file mới)
  • 🟨 Implementer Case 2 FE 2 app types/employee.ts 10 enum + EmployeesListPage 2-panel + 6 section inline collapsible + EmployeeCreatePage Header form minimal — Phase 1 ULTRA-MINIMAL scope (S33 afdc812, 6 mới × 2 app SHA256 IDENTICAL + 6 modified Layout/menuKeys/App)
  • 👤 Chủ trì Solo Permission menu MenuKeys.cs +Hrm+HrmHoSo const + All[] update + DbInitializer SeedMenuTreeAsync +2 entry order=28 (S33 em main commit 0e191de)
  • 🟥 Reviewer pre-commit Smart Friend 6× clean (0 critical/major, 3 minor defer Phase 1.5) + 🟩 CICD Monitor Run #237 PASS 3m50s (6/6 endpoint 200, bundle rotate × 2 app, Hrm menu seeded, EmployeeProfile 33 preserved idempotent) (S33 ae752c0 + ae2a01f)

Stats final S33 Plan G-H1: 34 mig (+1) · 67 tables (+7) · ~153 endpoints (+5) · 40 FE pages (+2) · 62 menu keys (+2 Hrm+HrmHoSo) · 120 test (+9 BW Plan C) · 52 gotcha unchanged · 26 memory user-level · 7 commit S33 push remote 5400983..79a8343 2 CI Run PASS · 8 pattern reinforced cumulative.

Phase 1.5 backlog (defer S34+): Per-action policy Hrm_HoSo_View/Create/Edit/Delete + bool partial update + Satellite CRUD endpoint + Test bundle Plan B Phase 2 + UAT non-admin smoke + fe-admin menuKeys sync Bg_/Catalog.

Plan G-H2 — Cấu hình chung HRM

  • 👤 Chủ trì Solo Mig 35 AddHrmConfigs — LeaveTypes + Holidays + ShiftPatterns + OtPolicy lookup tables
  • 🟦 Investigator audit NamGroup demo seed (LeaveTypes/Holidays/Shifts/OtPolicy) — reference cho seed sample data
  • 🟨 Implementer Case 2 mirror SOL Catalogs pattern (Plan CA Chunk B) BE CQRS CRUD 4 catalog
  • 🟨 Implementer Case 2 mirror admin Catalogs FE Admin 4 catalog page (list/create/edit dialog inline)
  • 👤 Chủ trì Solo Permission menu Hrm_Config* 4 leaf + admin role assign

Phase 10.2 — Office Core standalone (KHÔNG cần workflow)

Plan G-O1 — Danh bạ nội bộ

  • 👤 Chủ trì Solo BE 1 endpoint GET /api/directory — filter dept/position/search name+email+phone (reuse Users + EmployeeProfiles + Departments)
  • 🟨 Implementer Case 2 cookie-cutter FE 2 app InternalDirectoryPage (card grid avatar + dept + extension + email + mobile click-to-call)
  • 👤 Chủ trì Solo Permission Off_DanhBa 1 leaf

Plan G-O2 — Phòng họp (booking calendar standalone)

  • 👤 Chủ trì Solo Mig 36 AddMeetingRooms — MeetingRooms + MeetingBookings (RoomId/UserId/StartAt/EndAt/Title/Attendees[]/Status enum)
  • 🟨 Implementer Case 2 BE CQRS Room CRUD + Booking Create/Cancel + GetCalendar + check conflict (SERIALIZABLE transaction race-safe)
  • 🟨 Implementer Case 2 FE 2 app — Admin Rooms CRUD + User BookingCalendar (FullCalendar lib new dep — check license + bundle size impact)
  • 👤 Chủ trì Solo Notification push attendees when booking created (NotificationPushInterceptor reuse)
  • 👤 Chủ trì Solo Permission Off_PhongHop* 3 leaf

Phase 10.3 — Workflow Apps (extend ApprovalWorkflow V2 enum +5 values)

⚠️ PHẢI extend ApprovalWorkflowApplicableType enum first: +ProposalGeneral=4, +LeaveRequest=5, +OtRequest=6, +VehicleBooking=7, +ItTicket=8 (Mig 37 cookie-cutter Mig 22 pattern). Gotcha #51 INFRASTRUCTURE vs DEMO seed gate caution — SeedSampleWorkflow* OUT of DemoSeed:Disabled flag.

Plan G-O3 — Đề xuất (Proposal)

  • 👤 Chủ trì Solo Mig 38 schema + extend ApplicableType enum +ProposalGeneral=4
  • 🟨 Implementer Case 2 mirror PE Mig 22-26 BE Proposal entity + ProposalAttachments + workflow pin ApprovalWorkflowId
  • 👤 Chủ trì Solo BE ApproveV2Async branch + CodeGen DX/YYYY/NNN (cross-stack tight, mirror PE CodeGen)
  • 🟨 Implementer Case 2 cookie-cutter mirror PE Plan B Chunk E1+D+E2+E3 FE 2 app ProposalsList + Create + Detail (Section 1-5)
  • 🟥 Reviewer adversarial Smart Friend pre-commit — ApplicableType=Proposal validate cross-module security catch (gotcha #44 cumulative pattern)
  • 🟩 CICD Monitor post-deploy verify Run + bundle hash rotate

Plan G-O4 — Đơn từ (LeaveRequest + OtRequest + TravelRequest)

  • 👤 Chủ trì Solo Mig 39 schema 3 entity + extend enum +LeaveRequest=5 +OtRequest=6
  • 🟨 Implementer Case 2 ×3 spawn parallel BE 3 entity scaffold + CQRS handler mirror PE cookie-cutter
  • 👤 Chủ trì Solo BE LeaveBalance calculation (Hrm_Config LeaveTypes + EmployeeProfile.HireDate seniority) — business logic tight
  • 🟨 Implementer Case 2 ×3 FE 2 app 3 page mirror cookie-cutter
  • 🟥 Reviewer pre-commit + 🟩 CICD verify

Plan G-O5 — Đặt xe công (VehicleBooking)

  • 👤 Chủ trì Solo Mig 40 schema Vehicles + Drivers + VehicleBookings + extend enum +VehicleBooking=7
  • 🟨 Implementer Case 2 mirror G-O2 MeetingRoom + workflow mirror G-O3 BE CRUD + workflow + check conflict + driver assignment
  • 🟨 Implementer Case 2 cookie-cutter FE 2 app
  • 🟥 Reviewer + 🟩 CICD

Plan G-O6 — Ticket CNTT (IT Helpdesk)

  • 👤 Chủ trì Solo Mig 41 schema ItTickets + ItTicketComments thread
  • 👤 Chủ trì Solo BE CQRS + Auto-assign round-robin per category + SLA timer warning (business logic tight)
  • 🟨 Implementer Case 2 FE 2 app TicketsList + Detail (thread comment + status board kanban-ish)
  • 👤 Chủ trì Solo Notification SLA expire warning (reuse SlaTimer pattern Contract)
  • 🟥 Reviewer + 🟩 CICD

Phase 10.4 — Dashboards + Attendance

Plan G-H3 — Dashboard Nhân sự (depend H1 data)

  • 👤 Chủ trì Solo BE GET /api/hr/dashboard aggregate KPI (TongNV + HDActive + HDExpiring + GenderRatio + Birthday7d + StatusBreakdown)
  • 🟨 Implementer Case 2 cookie-cutter mirror MyDashboard role-aware FE 2 app HrmDashboardPage (4 KPI card + 2 donut chart + birthday timeline)
  • 👤 Chủ trì Solo Permission Hrm_Dashboard 1 leaf HR role only

Plan G-P1 — Chấm công (Pure web GPS check-in — no device integration per anh chốt S32)

  • 👤 Chủ trì Solo Mig 42 AddAttendances — AttendanceLogs (UserId/Date/CheckInAt/CheckOutAt/Source enum Web/Mobile/GPS lat-long/IpAddress/Note)
  • 👤 Chủ trì Solo BE Web GPS check-in endpoint + monthly report calc (OT từ Hrm_Config OtPolicy) — business logic tight
  • 🟨 Implementer Case 2 FE 2 app User MyAttendance (calendar tháng + click-in button GPS prompt) + Admin AttendanceReport (filter dept + export Excel)
  • 🟥 Reviewer + 🟩 CICD

Stats target Phase 10 end (estimate)

Metric Phase 9 Phase 10 end Δ
Migrations 33 ~42 +9 (Mig 34-42 batch nhỏ)
Tables 60 ~85 +25
Endpoints ~148 ~250 +100
FE pages 38 ~60 +22
AppRoles 14 ~18 +4 (HrAdmin/OfficeAdmin/Driver/ItStaff)
Permission menu ~60 ~110 +50 (Hrm_/Off_/Per_)
Tests 111 ~200 +90 (Phase 10 test-after UAT + critical algo test-before: workflow guard + CodeGen Proposal + LeaveBalance calc + Attendance OT)

Risk + Gotcha cần catch trước Phase 10 kick off

  1. Mig 37 enum extend ApplicableType — gotcha #51 INFRASTRUCTURE vs DEMO seed gate caution
  2. Cross-stack tight cho LeaveBalance + Attendance OT + Ticket Auto-assign — Implementer REFUSE, em main solo bắt buộc
  3. MeetingRoom + Vehicle conflict check — race condition 2 user book cùng time slot — SERIALIZABLE transaction mirror Contract gen mã
  4. EmployeeProfile depend by 8/11 module sau — KHÔNG được rush G-H1, Reviewer adversarial 100% pre-commit
  5. 30 demo profile cần seed thật cho 30 user existing — DbInitializer extend, KHÔNG demo seed gate (infrastructure)
  6. Permission leaf 50 NEW — admin Designer phải seed cẩn thận tránh broken inheritance tree (gotcha #35)
  7. FullCalendar lib new dep cho G-O2 + G-O5 + G-P1 — skill dependency-audit-erp chạy trước commit

📦 Post-launch (Phase 11+ — future, defer Phase 10 done)

  • Email outbox (MailKit + SMTP) — blocked chờ SMTP config (Phase 9 hard blocker)
  • E-signature integration (VNPT CA hoặc FPT CA)
  • Tích hợp Bravo / SAP ERP import NCC
  • Mobile app (React Native?) cho BOD duyệt ngoài giờ — depend G-P1 mobile GPS check-in done
  • AI: gợi ý điền form dựa HĐ cũ, OCR scan HĐ đối tác
  • Multi-tenant nếu có công ty thứ 2
  • G-P1+ — Chấm công device integration (vân tay/face recog/CSV import) khi anh có máy