Files
solution-erp/.claude/auto-memory/feedback_phase10_namgroup_port.md
pqhuy1987 23bbe97f39
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 5m26s
[CLAUDE] Docs: S124 adap-wave AI_INFRA + owner worker-tier-pin (14 agent opus+effort:max) + user-memory relocate R6 + H24 dogfood
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-15 23:17:45 +07:00

3.9 KiB

name, description, metadata
name description metadata
feedback-phase10-namgroup-port SOLUTION_ERP Phase 10 port 11 module NamGroup — 4 quyết định chốt S32 (scope/DB/reuse/rollout) + sequence Phase 9 stabilize first
node_type type originSessionId
memory project f382aac4-85bf-45e5-a957-c6cf046d1419

Phase 10 — Plan G: Port 11 module NamGroup → SOLUTION_ERP

Date chốt: 2026-05-26 (Session 32) Trigger: Anh main share screenshot NamGroup portaltest khung đỏ 11 module — yêu cầu plan kỹ tham khảo + thiết kế lại theo SOL DB + architecture.

4 quyết định anh chốt qua AskUserQuestion S32

  1. Scope: FULL 11 module (3 nhóm — KHÔNG subset)

    • Nhóm A NHÂN SỰ: Dashboard NS + Cấu hình HRM + Hồ sơ NS (3)
    • Nhóm B VĂN PHÒNG SỐ: Danh bạ + Phòng họp + Đề xuất + Đơn từ + Đặt xe + Ticket CNTT (6)
    • Nhóm C CÁ NHÂN: Chấm công (1)
    • Tổng cộng 10 Plan G-* atomic (Cấu hình + Hồ sơ NS gộp Phase 10.1 Foundation)
  2. DB: Single schema dbo mở rộng Mig 34→42+

    • KHÔNG multi-schema, KHÔNG separate DbContext
    • Theo CLAUDE.md convention SOL hiện tại
  3. Reuse: Workflow Engine V2 (Mig 22-26) extend ApplicableType enum +5 values

    • +ProposalGeneral=4 (Đề xuất)
    • +LeaveRequest=5 (Đơn nghỉ phép)
    • +OtRequest=6 (Đơn OT)
    • +VehicleBooking=7 (Đặt xe)
    • +ItTicket=8 (Ticket CNTT)
    • Tận dụng admin Designer + per-NV opt-in F1-F4 + Smart Friend pattern adversarial
  4. Rollout: Chunk per-module Plan riêng (10 Plan G-* atomic sprint ~3-5 ngày mỗi cái)

    • Aggressive multi-agent parallel ROI ~70%
    • Em main solo ~30% (cross-stack tight + business logic)

Sequence anh main chốt S32 t+1

"Tuần tự theo kế hoạch tốt nhất nhé" — Phase 9 stabilize trước → Phase 10.1 kick off. KHÔNG rush parallel.

Phase 9 stabilize priority order em main propose (chưa anh confirm):

  1. Plan A2 — RAG re-ingest docs/gotchas.md post-S31 fix (5 phút quick win)
  2. Plan A3 — MEMORY curate 3 agents OVER threshold (~30 phút)
  3. Plan B-Wrap — Contract V2 test bundle BW1-BW7 (~1.5h)
  4. Plan C1 — Phase 9 hard blockers (SMTP / rotate creds / SQL backup / win-acme cert expire 2026-06-18)
  5. Phase 10.1 kick off Plan G-H1 (Hồ sơ NS foundation)

Timeline target: ~3 tháng (T6-T8/2026) realistic với multi-agent aggressive.

G-P1 Chấm công scope clarify

Anh chốt: "Đúng tạm thời vậy trước" → Pure web GPS check-in (KHÔNG máy vân tay/face recog hiện tại). Defer device integration sang Phase 11+ khi anh có máy.

G-H2 HrmConfig seed reference

Anh chốt: "Tham khảo Demo bên NamGroup" → 🟦 Investigator audit NamGroup DbInitializer + DataSeeder lúc G-H2 kick off để extract seed data LeaveTypes/Holidays/Shifts/OtPolicy. KHÔNG hardcode từ đầu.

How to apply (cross-session)

Why: Em main session sau khi đụng Phase 10 / Plan G phải:

  • Read full migration-todos.md §Phase 10 trước khi spawn agent
  • Confirm sequence Phase 9 chưa nhảy cóc Phase 10
  • Reference 4 quyết định trên (scope/DB/reuse/rollout) tránh re-litigate
  • Reference NamGroup D:\Dropbox\CONG_VIEC\NAMGROUP\SOURCECODE_CÔNG_TY\NAMGROUP\ cho audit per-module pattern

Apply: Khi anh main hỏi "kick off Phase 10 chưa?" → Check Phase 9 stabilize status (RAG re-ingest done? MEMORY curate done? Plan B-Wrap done? Hard blockers done?). Nếu chưa → recommend hoàn thành Phase 9 trước. Nếu xong → spawn 🟦 Investigator pre-flight Plan G-H1 audit NamGroup TblNhanVien* 8 bảng.

Pattern reusable: Khi anh main yêu cầu "port module từ project tham khảo" → AskUserQuestion 4 dimension (scope / DB strategy / reuse depth / rollout chunk strategy) trước khi plan, KHÔNG plan rough rồi rework.

Related: feedback-rag-distributed-ownership feedback-multi-agent-setup