Files
solution-erp/docs/changelog/sessions/2026-05-26-2030-s33-plan-bc-deploy.md
pqhuy1987 edba4ae147 [CLAUDE] Docs+Memory: S33 wrap — Plan B G-H1 + Plan C B-Wrap deploy prod end-to-end
S33 cumulative wrap update STATUS + HANDOFF + migration-todos tick G-H1
7 task done + session log + CICD MEMORY post-Run #237 entry.

## Updates

- docs/STATUS.md: prepend S33 entry (Plan B + C + D drift patch + multi-agent
  ROI ~250K total + 8 patterns reinforced + new capability UAT-ready)
- docs/HANDOFF.md: prepend S33 wrap + S34 handover recommend sequence (curate
  4 MEMORY → G-O1 Danh bạ → G-H2 HrmConfig)
- docs/changelog/migration-todos.md: tick [x] G-H1 7 task + stats final S33
  + Phase 1.5 backlog
- docs/changelog/sessions/2026-05-26-2030-s33-plan-bc-deploy.md: NEW session
  log full (~250 line: outcomes + plan execution table + multi-agent ROI +
  8 patterns + defer Phase 1.5/S34+ + commits range + UAT capability)
- .claude/agent-memory/cicd-monitor/MEMORY.md: post-Run #237 entry append
  (truncated from S33 startup curate 24.2KB → 32.9KB, curate priority next
  session)

## Stats final S33

| Metric | Pre-S33 | Post-S33 | Δ |
|--------|---:|---:|---:|
| Migrations | 33 | 34 | +1 (Mig 34 AddEmployeeProfiles) |
| Tables | 60 | 67 | +7 (EmployeeProfile + 5 satellite + Sequence) |
| Endpoints | ~148 | ~153 | +5 (/api/employees REST) |
| FE pages | 38 | 40 | +2 (EmployeesListPage + EmployeeCreatePage × 2 app) |
| Menu keys | ~60 | ~62 | +2 (Hrm + HrmHoSo) |
| Tests | 111 | 120 | +9 (BW1-BW7 Plan C, BW6 split 3) |
| Gotchas | 52 | 52 | 0 new (2 existing lesson applied: #50 + #51) |
| Memory user-level | 26 | 26 | 0 new (decision: no rule warrant new entry, all patterns reinforce existing) |
| AppRoles | 14 | 14 | 0 new |
| EmployeeProfile prod | 0 | 33 | +33 (seeded via DbInitializer idempotent) |
| EmployeeCodeSequences | 0 | 1 | NV/2026 LastSeq=33 |

## Multi-agent ROI cumulative S33

🟦 Investigator 2 spawn ~20K + 🟨 Implementer 4 spawn ~110K (2/4 truncated
mid-MEMORY, functional complete) + 🟥 Reviewer 3 spawn ~60K (Smart Friend
6× clean) + 🟩 CICD 3 spawn ~60K (Run #350 + #237 PASS) + em main solo
~150K (Task 2 + Task 3b + Task 6 + 7 commit batch + push).

## CI Runs

- #350 Phase 1 (commit 48a99e1) — 3m38s PASS — Mig 34 prod + 33 seeded + 9 BW
- #237 Phase 2 (commit 79a8343) — 3m50s PASS — 5 NEW employee endpoint + Hrm
  menu seeded + bundle rotate × 2 app

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-26 22:25:19 +07:00

8.6 KiB
Raw Blame History

Session 33 — Plan B G-H1 + Plan C B-Wrap deploy prod end-to-end

Date: 2026-05-26 (16:00 → 20:45 ICT, ~5h cumulative) Trigger: Anh main chốt "Plan cha B và Plan cha C" sau S33 startup audit + drift patch.

Outcomes

  • 34 mig (+1 Mig 34 AddEmployeeProfiles)
  • 67 tables (+7: EmployeeProfile + 5 satellite + EmployeeCodeSequence)
  • ~153 endpoints (+5 employees REST: GET list, GET detail, POST, PUT, DELETE)
  • 40 FE pages (+2 EmployeesListPage + EmployeeCreatePage × 2 app SHA256 IDENTICAL)
  • 62 menu keys (+2 Hrm + HrmHoSo)
  • 120 test PASS (+9 BW1-BW7 Contract V2 test bundle, was 111 baseline)
  • 52 gotcha unchanged (no new gotcha discovered S33, 2 existing lesson applied)
  • 33 EmployeeProfile seeded prod (1 admin + 30 demo + 2 catalog.manager)
  • 7 commit pushed remote 5400983..79a8343 (full range cumulative S33)
  • 2 CI Run PASS: #350 Phase 1 (3m38s) + #237 Phase 2 (3m50s)

Plan execution

Plan cha A (S32 done — Phase 9 stabilize 4 task)

Status carry-over — no S33 work needed.

Plan cha B — Phase 10.1 G-H1 Hồ sơ Nhân sự (S33 NEW — 7 task end-to-end)

Trigger: HANDOFF S32 kick off priority + anh main S33 authorize.

Task Owner Result
1. NamGroup pre-flight audit 🟦 Investigator a103d20 10 bảng TblNhanVien* (NOT 8 anh estimate) + field map 70 cols + 5 satellite proposal
2. Mig 34 schema design 👤 Em main solo 4 decision: 5 satellite / Skill polymorphic / DiaChi FK+freetext dual-write / NV/{YYYY}/{Seq:D4} atomic
3. BE entity + EF Config + Mig 34 🟨 Implementer a8f4567 17 file mới + 4 modified + Mig 34 3-file rule (em main verified via build + ef database update)
3b. DbInitializer seed 30 demo 👤 Em main solo SeedDemoEmployeeProfilesAsync ~90 LOC NOT gated DemoSeed flag per gotcha #51 + EmployeeCodeSequence row
4. BE CQRS + Controller 🟨 Implementer a9bb9f3 3 file: EmployeeFeatures (5 pair) + Dtos (5 satellite) + EmployeesController (5 REST endpoint class-level [Authorize])
5. FE 2 app pages 🟨 Implementer afdc812 6 mới × 2 app SHA256 IDENTICAL + 6 modified (App.tsx + Layout.tsx + menuKeys.ts × 2 app)
6. Permission menu seed 👤 Em main solo MenuKeys +Hrm+HrmHoSo + SeedMenuTreeAsync +2 entry order=28 (Admin auto-grant via SeedAdminPermissionsAsync iterate All[])
7. Pre-commit + post-deploy verify 🟥 Reviewer ae752c0 + 🟩 CICD ae2a01f Smart Friend 6× clean (0 critical, 0 major, 3 minor defer Phase 1.5) + Run #237 PASS 3m50s (6/6 endpoint 200 + bundle rotate × 2 + menu seeded + 33 row preserved)

Plan cha C — B-Wrap Contract V2 test bundle BW1-BW7 (S33 NEW — 4 step end-to-end)

Trigger: Anh main S32 chốt defer dedicated session ~2h. S33 kick off cùng Plan B.

Step Owner Result
1. Test infra helpers 👤 Em main solo TestCurrentUser.cs stub ICurrentUser (31 LOC) — KHÔNG mock ChangelogService (use REAL impl với stub)
2. Scaffold BW1-BW7 🟨 Implementer aaaf0511 3 file: ContractWorkflowServiceApproveV2Tests (BW1-4+7) + CreateContractCommandApplicableTypeTests (BW5) + ContractV2SchemaPersistenceTests (BW6 split 3 [Fact]) = 9 [Fact] total
3. Reviewer pre-commit 🟥 Reviewer aaa1df3 Smart Friend 5× clean — 9/9 PASS independent verify in 4.7s, spec strings exact match service source, 0 critical/major, 3 minor cosmetic
4. CICD post-deploy verify 🟩 CICD a67df4e Run #350 PASS 3m38s — test_infra 62/62 (53+9 BW), Mig 34 prod applied, 33 EmployeeProfiles seeded prod, gotcha #51 verified

Plan cha D — Drift patch S33 startup ad-hoc (em main solo)

Trigger: S33 startup Reviewer SEVERE catch — CLAUDE.md baseline header drift cumulative S19→S32 misleading future spawn context.

Action File Result
Patch drift CLAUDE.md root + docs/CLAUDE.md + .claude/agents/implementer.md 10 line edit: 26→33 mig + 81→111 test + 26→52 gotcha + audit next 2026-06-01 + Contract V2 wire status + table 52→60

Multi-agent ROI cumulative S33

Agent Spawn count Token est Verdict
🟦 Investigator 2 ~20K Solid pre-flight audit + cross-agent learning synthesis
🟨 Implementer 4 ~110K Pattern 12-bis + 16-bis 4× cumulative reinforced. 2/4 truncated mid-MEMORY update (Task 3+4 heavy ~50+ tool uses) — functional work complete despite
🟥 Reviewer 3 ~60K Smart Friend 6× clean cumulative — drift severity catch + 2 pre-commit pre-push gates
🟩 CICD 3 ~60K Run #350 + #237 verify PASS + gotcha #51 INFRASTRUCTURE seed pattern reaffirmed prod
👤 Em main solo ~150K Task 2 schema + Task 3b seed + Task 6 menu + 7 commit batch + push + STATUS/HANDOFF update
Total S33 12 spawn ~400K 0 critical issue end-to-end, 0 prod regression

Patterns reinforced cumulative S33

  1. Pattern 12-bis cross-module entity cookie-cutter mirror PE → Hrm — 4× cumulative (S29 Plan B Contract Mig 33 + S33 Task 3+4+5)
  2. Pattern 16-bis 4-place mirror cross-app fe-admin+fe-user IDENTICAL — 4× cumulative (S29 Plan CA HF1 + Plan B Chunk D + S33 Task 5)
  3. Smart Friend independence 6× cumulative clean (S22 #44 + S25 #48 + S29 Plan CA password + S29 Plan B ApplicableType + S33 Plan C BW + S33 Plan B Phase 2)
  4. gotcha #51 INFRASTRUCTURE vs DEMO seed gate lesson applied 2× S33 (EmployeeProfile seed line 94 + Hrm menu seed line 1480, both OUT of if (!demoSeedDisabled) block)
  5. gotcha #50 Layout staticMap mirror cross-app applied 1× S33 (Hrm_HoSo: '/employees' cả fe-admin + fe-user Layout.tsx)
  6. gotcha #41 path filter Discovery #3 reaffirmed (commit 79a8343 MEMORY-only rides push range trigger when ≥1 commit code)
  7. Implementer truncation pattern observation 2/3 NEW S33 — heavy scaffold ~50+ tool uses runs out token budget on final MEMORY update phase. Functional work complete via Edit/Write tool, MEMORY append cutoff mid-sentence. Mitigation: split heavy task → 2 phase budget reserve OR em main proxy MEMORY append next session
  8. RAG ROI evaluation framework reinforced — RAG hit 2/3 PASS S33 startup verify (Plan G NamGroup 0.848 + gotcha #52 0.910 + per-NV 10-surface 0.684 boundary). Solo project marginal saving 5-10%, cross-project transform pending 6 project bootstrap.

Defer Phase 1.5 backlog

  1. Per-action policy Hrm_HoSo_View/Create/Edit/Delete (gotcha #44 mitigation)
  2. Convert 3 bool field UpdateCommand → bool? safe partial update
  3. Satellite CRUD endpoint (WorkHistory/Education/FamilyRelation/Skill/Document) + FE edit form
  4. Test bundle Plan B Phase 2 (Create UNIQUE conflict + List filter + codeGen race)
  5. UAT smoke non-admin role verify silent 403 catch
  6. fe-admin menuKeys.ts add Bg_/Catalog sync với fe-user (drift not blocking)

Defer S34+ backlog priority

  1. Curate 4 MEMORY sub-agent (~30 phút) — all 4 over 25KB threshold post-S33 heavy spawn (CICD 32.9 + Imp 30.5 + Rev 28.5 + Inv 26)
  2. G-O1 Danh bạ nội bộ (~2-3h) easiest standalone, no workflow — reuse Users + EmployeeProfile + Departments
  3. G-H2 Cấu hình HRM (~3-4h) prerequisite cho G-O3-O6 workflow apps (Mig 35 LeaveTypes + Holidays + ShiftPatterns + OtPolicy)

Commits range S33

79a8343 [CLAUDE] Memory: S33 Plan B Phase 2 + Reviewer activity 3 sub-agent append
9616ae2 [CLAUDE] FE-Admin+FE-User: Plan B G-H1 Task 5 — EmployeesPage 2-panel + EmployeeCreatePage cookie-cutter mirror
0e191de [CLAUDE] Domain+App+Api+Infra: Plan B G-H1 Task 4+6 — Hrm CQRS 5 endpoint + Permission menu
48a99e1 [CLAUDE] Domain+App+Infra: Plan B G-H1 Mig 34 EmployeeProfile + seed 30 demo
0605f19 [CLAUDE] Tests: Plan C B-Wrap BW1-BW7 Contract V2 test bundle +9 tests (111→120)
b3444a3 [CLAUDE] Memory: S33 startup + Plan B+C activity 3 sub-agent append
1bc6b70 [CLAUDE] Docs: patch CLAUDE.md+docs/CLAUDE.md+implementer.md drift S19→S32

CI Runs: #350 Phase 1 (3m38s) + #237 Phase 2 (3m50s) cả 2 PASS. Cumulative deploy time ~7m28s within baseline 3-4 min/Run.

New capability prod end-to-end UAT-ready

Anh main login admin@solutions.com.vn / Admin@123456 → sidebar "Nhân sự" > "Hồ sơ Nhân sự" → /employees:

  • List 33 row sample: NV/2026/0007 BOD 1 - Director, Ban Giám đốc, Active, hireDate=2021-08-01
  • Click row → 6 section collapsible: Cơ bản (Header) + Công tác (WorkHistory empty Phase 1) + Đào tạo + Thân nhân + Kỹ năng + Hồ sơ (Documents empty Phase 1)
  • "Tạo mới" button → /employees/new form Header minimal (UserId picker + status + birthday + gender + phone + hire date + nationality)
  • POST creates new profile with auto NV/2026/0034+ code sequence

Phase 1.5 sẽ add inline edit + satellite CRUD form.