Anh chot 4 viec governance. Detector 46->45 = DOI THANH-PHAN (-2 duong-gia +1 duong-THAT), khong phai "flag giam". Mark moi RC-pqhuy1987-15-07-2026-17-23-10. - backtick-guard H24-1: discriminator = ENCLOSURE (use vs mention), KHONG port duoc charset-guard cua H24-2 vi vi-du byte-identical voi claim. Helper DUY-NHAT Test-Quoted. Fault-inject 5/5 (2 anti-Goodhart). - H24-3 session-label lag (MED, moi): va am-gia CHUNG-MINH-DUOC cua H24-1 (so NGAY ma ngay = moi nhat => 0 flag trong khi nhan lui 3 phien; tai-phat lan 4). Fault-inject 6/6 + 6/6 sau fix. - DUAL-ACCEPT (dang-3 RETIRED) + LUAT RETIRE LEGACY: go nhanh legacy khi tap di-san RONG, giu khi CON nguoi thu-huong. Repo that 0 orphan/26. Fault-inject 7/7. - tiep.md:66 stale-at-birth + sweep view-residual-asym 6/6 be-mat LUAT sach. Reviewer PASS_WITH_FIXES bat 6 loi that, lead verify 4/4 doc-lap: gen-2 citation-trap (lead viet 30 dong chung-minh dinh-luat roi de H24-3 KHONG guard) - greedy .* lay CUOI khong phai MAX - ly-do retire ap cho dang-2 thi giet C8 - "retire HOAN-THANH mark" = nguy-bien - "5/5" = 4/4. Goodhart DO DUOC (ngoai diff): W4/S122 "va" permission-matrix:16 bang doi FORMAT anchor => khop 0 pattern => H24-1 mat chinh positive-control no dung quanh; flag-count GIAM nen trong nhu thanh-cong. Outward: addendum R5 (DUNG adopt TRI-ACCEPT) + email hub ed3786a10f12 (selftest-stamp MATCH x2). _index reconcile: 2 email S122 gui ma chua log. #53 garble x4/3 agent - harvest-curator ghi diary TRONG luc lam nen vot duoc tu dia ngay; reviewer tu rut luat "ghi diary TRUOC return" tu garble-1 va nho dung no ma garble-2 vot duoc. Prompt-dung KHONG chan duoc #53. Lead sai 4 ca tron o truc dem-ve-minh: "25"!=26 - "5/5"!=4/4 - viet "7/7 PASS" TRUOC khi chay - "0 proxy" sai. State GIU NGUYEN: Mig 66 - 89 bang - 509 test - gotcha 82 - menu 54. Con no: STATUS:6 CO Y chua bump (H24-3 dang FLAG, giu cho hien ra). Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
RAG Governance — SOLUTION_ERP
Pattern: Path B — Delegation stub (VIPIX pattern per v1.3 §4.1) Adopted: 2026-05-26 Status: ✅ Active trial week 1-4 (2026-05-26 → 2026-06-23)
Delegation to AI_INFRA canonical
SOLUTION_ERP adopts RAG Framework v1.3 via Path B delegation stub — deferring to AI_INFRA canonical docs.
| Doc | Path |
|---|---|
| Comprehensive guide (v1.3) | D:\Dropbox\CONG_VIEC\AI_INFRA\docs\governance\RAG-FRAMEWORK-V1.3-SETUP-GUIDE.md |
| Quickstart checklist | D:\Dropbox\CONG_VIEC\AI_INFRA\docs\governance\RAG-QUICKSTART-SISTER-PROJECT.md |
| Layer A canonical | D:\Dropbox\CONG_VIEC\AI_INFRA\docs\governance\RAG-LAYER-A-PROJECT-LOCAL.md |
| Self-execute walkthrough | D:\Dropbox\CONG_VIEC\AI_INFRA\docs\governance\RAG-SELF-SETUP-WALKTHROUGH-AI-INFRA.md |
SOLUTION_ERP project-specific config
Phase + BC vocabulary
Phase enum (project-specific):
phase-1-foundation— Core schema + Identity + Master (Mig 1-11)phase-2-contract— Contract workflow 9-phase (Mig 1-11)phase-3-pe-v1— PurchaseEvaluation V1 flat approval (Mig 12-15)phase-4-budget— Budget module 3-panel (Mig 14)phase-5-forms— FormTemplate + Clause engine (Mig 4)phase-6-pe-v2— PE V2 dynamic approval workflow (Mig 22-26)phase-7-contract-v2— Contract V2 mirror PE pattern (Mig 27-33)phase-8-admin-ops— CatalogManager role + admin ops (Plan CA)phase-9-uat— UAT + production hardening (current)
BC (bounded-context) enum (project-specific):
bc-contract— Contract workflow + ContractApprovalsbc-pe— PurchaseEvaluation + PEDeptOpinions + PELevelOpinionsbc-budget— Budget + BudgetItemsbc-identity— User + Role + Permission + MenuItembc-master— Supplier + Project + Departmentbc-forms— FormTemplate + FormClausebc-notification— Notification + SignalRbc-workflow— ApprovalWorkflow + Steps + Levels (cross-module)bc-cicd— Gitea Actions + NSSM runner + IIS deploybc-agent— Sub-agent memory + skills + governance
Anatomy gate threshold
6/6 STRICT per v1.3 §5.2 default — corpus ~2,409 chunks (post-S41 cleanup 2026-05-29; was 11,922 pre-cleanup inflated) mature enough.
Spec A vs B
Spec A — Strict — SOLUTION_ERP chunks canonical + finite scope (gotchas, patterns, decisions) → strict retrieval test appropriate.
Adoption state
| Component | Status |
|---|---|
| Layer A delegation stub | ✅ This file |
.claude/rag.json _decision_log |
✅ Added 2026-05-26 |
| Anatomy gate 6/6 | ✅ Documented |
| Spec A vs B | ✅ Spec A chosen |
| Golden set 14 entries | ✅ eval/golden-set-solution_erp.jsonl |
| Baseline run | ✅ eval/runs/2026-05-26-baseline-v1.0.json |
| Trial state lock | ✅ eval/trial-state-lock.json |
| Trial milestones | ✅ 4-week 2026-05-26 → 2026-06-23 |
Anti-pattern watch (SOLUTION_ERP-specific)
- Anti #23 source_path absolute path leak — ✅ resolved S41 re-bootstrap (2026-05-29): node_modules/_archive excluded, slug fixed. Some
(manual)store_memory chunks retain absolute path (cosmetic, non-blocking). - Anti #24 registry drift +321% — ✅ resolved S41: re-bootstrap host-side
--config→ Qdrant 2,406 (−674 junk), registry aligned. (Was: projects.json 2830 / Qdrant LIVE 11,922 inflated.) ⚠️eval/trial-state-lock.jsonbaseline still cites old number → AI_INFRA to reconcile.
Cross-Project Adoption Ledger (AI_INFRA bundles)
| Bundle date | Adopted | Evidence |
|---|---|---|
| 2026-05-29 (charter v2 / tiered-mem / session-cmd / RAG v1.3) | 4/4 | 6f08d1f (Tiered Memory v1) + c8ff5e1 (/session-start /session-end) · RAG re-bootstrap 3080→2406 |
| 2026-06-01 (RAG T1/T2 · Gov-v2 · hygiene · session-cmd #4) | §A auto · §B align · §C wording ×7 · §D #4 step · §E/§F · ✅ VERIFIED 2-way (AI_INFRA RT3 confirm) | S44 audit (docs-only) — chain ae30f8f→071c25c tree-clean — BROADCAST-OUT-SOLUTION-ERP-2026-06-01.md |
| 2026-06-02 (adap-* channel + Memory-strip + frontend-designer + Gov-v2 re-confirm) | 3-cmd channel installed · #1 strip store_memory 8 subs (lead=sole RAG-writer) · #2 frontend-designer 8th agent ADOPT · #3 Gov-v2 already-S44 delta |
S47 — docs/governance/adap-reports/ 3 files (5-field LOCK) · nấc executed / verified-pending restart (spawn-test FD2) · AI_INFRA /adap-audit reads cross-repo |
Cadence #4 (self-sustaining): /session-end Phase 6.3 auto-generates §E adoption-report when infra adopted → em main /session-start next watches + double-checks (2-way loop).
Tags: solution-erp delegation-stub rag-v1.3 path-b spec-a anatomy-gate-6-6 adoption-ledger