Commit Graph

2 Commits

Author SHA1 Message Date
e23f51c42e [CLAUDE] Docs: Session 24 chốt cuối - Plan AA cumulative 7 commits + 4 agent MEMORY drift wrap
S24 wrap deliverables:

Docs:
- docs/STATUS.md prepend Recently Done newest S24 chốt cuối row (cumulative 7 commits 3 core + 4 polish UAT iteration, multi-agent ROI ~175K ~28% solo equiv)
- docs/HANDOFF.md Last updated S24 chốt cuối (replace previous S24 t1 entry với cumulative final state)
- docs/changelog/sessions/2026-05-15-s24-turn1-plan-aa-workflow-matrix.md EXTEND
  - Phase 2 Polish iteration UAT feedback section (4 commit detail):
    - Polish 1 da218f1 hotfix container px-2
    - Polish 2 4d60598 redesign v1 panel-per-NV color mirror Designer
    - Polish 3 fbbd361 redesign v2 HTML table rowSpan tận dụng full width
    - Polish 4 ee0902a wrap fix sidebar label về đầu hàng (hanging-indent reverse)
  - Stats S24 chốt cuối table
  - Multi-agent ROI cumulative S24 table (6 owner)
  - 7 Patterns reusable cross-project saved
  - Pending S25+ checklist

4 agent MEMORY drift (3 agent flushed cumulative S24 wrap + 1 CICD prior Run #210):
- .claude/agent-memory/investigator/MEMORY.md S24 Pre-A entry + memory drift note
- .claude/agent-memory/implementer/MEMORY.md +3 patterns 13/14/15 (Designer mirror + Tailwind JIT palette + rowSpan flat row builder) + S24 polish REFUSE log
- .claude/agent-memory/reviewer/MEMORY.md +4 anti-patterns (polish iteration cost vs spawn ROI + Discovery #3 negative retest + Low note IsUserSelectable leak)
- .claude/agent-memory/cicd-monitor/MEMORY.md Run #210 PASS entry (Plan AA verify 4/4 wire end-to-end)

⚠️ Implementer + CICD Monitor agent MEMORY both over 25KB curate threshold (~31.5KB + ~43KB).
Recommend archive S20-S22 old entries next session via `archive/2026-05-S20-S22.md`.

User-level memory: NO update needed per §6.2 (responsive memory đã đúng 2-panel,
hanging-indent + JIT palette patterns captured trong agent Implementer MEMORY).

Test verify post-Plan AA: 111/111 PASS unchanged (58 Domain + 53 Infra). No regression.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-16 00:18:48 +07:00
ac2c85901a [CLAUDE] Docs: Plan AA Chunk C - S24 t1 wrap session log + STATUS+HANDOFF + 3 agent MEMORY drift
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 3m25s
Documentation deliverables:
- docs/STATUS.md Recently Done newest entry S24 t1 (gop 3 commit + multi-agent ROI table + pattern reinforced 4 lessons)
- docs/HANDOFF.md "Last updated S24 t1" prepend on top (cumulative carry S23 chốt cuối)
- docs/changelog/sessions/2026-05-15-s24-turn1-plan-aa-workflow-matrix.md NEW ~9KB
  - Q&A 2 lượt chốt spec (Permission strategy + Matrix layout)
  - Pre-A Investigator findings 5Q + 3 surprises critical
  - Chunk A BE+Layout breakdown (MenuKeys + DbInitializer INSERT-OR-UPDATE-Order
    + Handler filter + Controller pass-through + sidebar widen + revert Plan U truncate)
  - Chunk B FE matrix page + types + App.tsx route
  - Chunk C Reviewer cumulative verdict (PASS 0 blocker)
  - Stats trước-sau + Multi-agent ROI table (~150K total ~25% solo equiv)
  - 4 pattern reinforced cross-project reusable
  - Pending S24+ checklist (7 items)

Agent MEMORY drift (auto-updated by agents + Investigator manual touch):
- .claude/agent-memory/investigator/MEMORY.md +1 FIFO entry S24 Pre-A audit
- .claude/agent-memory/implementer/MEMORY.md +1 FIFO entry S24 Chunk B PASS
- .claude/agent-memory/reviewer/MEMORY.md +1 FIFO entry S24 cumulative verify PASS

Stats S24 t1 chốt:
- 31 mig (no Mig mới)
- 59 tables
- ~146 endpoints (+1 GET filter param)
- 35 FE pages (+1 WorkflowMatrixViewPage)
- 111 test (unchanged UAT mode)
- 47 gotcha
- 21 memory user-level
- 6 skills
- 4 sub-agents (3 spawn S24 t1)
- 3 commits Plan AA push remote: ee776d5 (A) + c667802 (B) + this (C)

Pending: Bro UAT verify deploy + CICD Monitor spawn Run #210+ post-deploy.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-15 16:38:21 +07:00