Commit Graph

1 Commits

Author SHA1 Message Date
a1a910f576 [CLAUDE] Docs: Chunk S23-Wrap — Session 23 chốt cuối cumulative (11 plan + 32 commits)
Bro chốt session S23 — 9 yêu cầu wrap:

1. **Flush 4 agent MEMORY.md cumulative S23 t4-t11:**
   - Investigator (+2 entries Plan R audit + Plan P FE wire audit)
   - Implementer (+1 entry cumulative REFUSE Plan N-U em main solo)
   - Reviewer (+1 entry cumulative em main self-review Plan N-U + Smart
     Friend pattern reusable)
   - CICD Monitor (+4 entries Run #204 Q + #207 T + #208 T5+T6 + #209 U
     PASS verify)

2. **Update MD docs:**
   - STATUS.md: Last updated S23 t12 chốt cuối + stats final cumulative
   - HANDOFF.md: TL;DR S23 t12 đầy đủ + Plan tree summary
   - Session log new: 2026-05-15-s23-turn11-plan-u-sidebar-truncate.md

3. **Skill list:** 6 project-specific skills unchanged
   (contract-workflow + permission-matrix + form-engine + ef-core-migration
   + dependency-audit-erp + iis-deploy-runbook) — agent allocation
   preserved (no new skill, no audit due — next 2026-06-01)

4. **Unit test verify:** 111/111 PASS unchanged
   (58 Domain + 53 Infra = +7 cumulative S23 từ 104 baseline pre-Plan M)

5. **Memory user-level update:**
   - feedback_per_nv_permission_scope.md +1 section S23 t6 CRITICAL HOTFIX
     Plan P (wire 10 surface points — point 10 Controller body record
     mirror count check)
   - NEW feedback_demo_seed_flag_disable.md (Plan T pattern reusable
     cross-project)
   - MEMORY.md index +1 entry NEW + update existing entry narrative
   - 21 memory entries total (+1 từ 20)

6. **§6.5 KEEP narrative discipline:** preserved — không cắt narrative
   any MD, chỉ phân tầng cumulative qua sections riêng (Reinforcement
   S22+5 → S23 t1 → t3 → t4 → t5 → t6 each separate section trong
   per_nv_permission_scope).

7. **Plan tree chốt cuối S23 11 plan:**
   K (Mig 31 F2 refactor 9c) → L (UAT bug 5c) → M (F1 edge case 4c) →
   N (per-NV lookup 2c) → O (4 sites cascade 2c) → P (Controller body
   record 1c) → Q (FE banner CSS 1c) → R (cleanup test data 1c) →
   S (wipe ALL workflows 1c) → T (DemoSeed flag 2c) → U (sidebar
   truncate 1c) = 32 commits total cumulative S23

8. **Release verify ALL PASS:**
   - CI runs: #195 K10 + #199 L + #200 M + #201 N + #202 O + #203 P +
     #204 Q + #207 T + #208 T5+T6 + #209 U — 10 verify runs ALL PASS
   - HEAD synced với origin/main: 86d8806

9. **Multi-agent ROI cumulative S23:**
   - 🟦 Investigator 5 spawn (K0 + N hypothesis + P FE wire + R audit + L2)
   - 🟨 Implementer 5 spawn (K1/K3/K5/K7 Case 2+3 + M2 + M3)
   - 🟥 Reviewer 2 spawn (K2 pre-commit + M3 cumulative review)
   - 🟩 CICD Monitor 10 verify runs PASS
   - Em main solo 6/11 plan (cross-stack reasoning chain Plan N+O+P+Q+R+S+T+U)

Stats final S23 chốt cuối:
- 31 mig · 59 tables · ~145 endpoints · 34 FE pages
- **111 test PASS unchanged** (+7 cumulative)
- 47 gotcha · **21 memory entries** (+1 NEW Plan T)
- 6 skills · 4 sub-agents active
- **0 PE + 0 demo workflow + DemoSeed flag persist** — UAT permanent clean slate
- Backup rollback: vietreport-vps:C:\Backup\SolutionErp_pre_cleanup_2026-05-15.bak

Pending S24+:
- Plan B Contract V2 wire (Mig 32+33) — HIGH priority next
- Discovery #4 ASP.NET enum body deserialization (low priority polish)
- Discovery #3 anomaly CI trigger docs-only — 3× reinforced
- Gotcha #47 paths-ignore agent-memory pending bro confirm

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-15 15:49:03 +07:00