c56024ba2590b22d89de99d9591ecd5b49ef6c34
24 Commits
| Author | SHA1 | Message | Date | |
|---|---|---|---|---|
| c56024ba25 |
[CLAUDE] PE-Workflow: Chunk B — BE Service + handlers + DTOs (F1+F2+F3)
F1 — 4 mode Trả lại (Service.ApplyReturnModeAsync helper):
- WorkflowReturnMode enum (OneLevel / OneStep / Assignee / Drafter)
- OneLevel: lùi 1 Cấp trong cùng Step (peer review). Bước 1 Cấp 1 → fallback Drafter.
- OneStep: lùi sang Bước trước Cấp cuối. Bước 1 → fallback Drafter.
- Assignee: pick runtime → tìm Step+Level match ApproverUserId trong workflow.
- Drafter: Phase=TraLai clear pointer như S17 (backward compat).
- 3 mode đầu giữ Phase=ChoDuyet, reset SLA 7d. Mode Drafter clear SLA.
- Admin bypass workflow.Allow* flag check. Non-admin → throw ConflictException
với message rõ "Workflow không bật mode X".
F2 — Drafter skipToFinal (extend DRAFTER trình branch):
- Workflow.AllowDrafterSkipToFinal=true required (non-admin)
- Set CurrentWorkflowStepIndex = Steps.Count-1 + CurrentApprovalLevelOrder = max Level
- Audit comment append "[Drafter gửi thẳng Cấp cuối]"
F3 — Approver edit Section 2 (Detail + NCC + Báo giá):
- New helper `EnsureEditableForDetailsAsync` (extend pattern PurchaseEvaluationDraftGuard):
- Drafter scope: DangSoanThao OR TraLai (any role, Controller [Authorize] handles)
- F3 Approver scope: ChoDuyet + workflow.AllowApproverEditDetails=true +
actor.Id match CurrentLevel.ApproverUserId. Admin bypass flag check.
- Throw ForbiddenException nếu approver Cấp khác nhau (rõ Bước/Cấp trong message).
- 8 handler switch helper + inject ICurrentUser khi cần:
- Detail: Add (existing ICurrentUser) / Update + Delete (inject new)
- Quote: Upsert + Delete (inject new)
- Supplier: Add (existing) / Update + Delete (inject new + add guard, trước
đây hoàn toàn KHÔNG có phase guard — bonus security fix)
- Audit: thêm changelog Update/Delete handler (trước đây silent). Khi phase=
ChoDuyet append " [Approver edit khi đang duyệt]" cho lịch sử rõ ai sửa.
Extension Service `TransitionAsync` signature (backward compat — 3 optional
param thêm cuối + default null/false):
- WorkflowReturnMode? returnMode = null
- Guid? returnTargetUserId = null
- bool skipToFinal = false
TransitionPurchaseEvaluationCommand DTO + Validator + Handler — mirror signature.
DTO extensions:
- ApprovalWorkflowOptionsDto NEW sub-record (6 Allow* flag) cho FE filter
- PurchaseEvaluationDetailBundleDto + WorkflowOptions field (null nếu V1 legacy)
- GetPe handler populate awOptions từ ApprovalWorkflow entity load (Mig 23 path)
- AwDefinitionDto + 6 Allow* field (admin Designer GET overview)
- CreateAwDefinitionCommand + 6 Allow* param (admin Designer POST new version)
- Handler ToDto + entity new() — propagate Allow* end-to-end
Default backward compat: workflow cũ → AllowReturnToDrafter=true (Mig 28 DB
default), 5 flag còn lại false. Phiếu cũ V2 vẫn Trả lại Drafter như S17 sau
deploy — no breaking change.
Verify:
- dotnet build SolutionErp.slnx → 0 err, 2 warn pre-existing DocxRenderer
- 3 regression test gotcha #45 vẫn PASS (backward compat signature change)
- LocalDB Dev + Design đã apply Mig 28 (Chunk A)
Pending Chunk C: FE Admin Designer mirror 2 app (6 checkbox + DTO types).
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
|
|||
| de0088742f |
[CLAUDE] PurchaseEvaluation: Chunk A — BE guard target TraLai/TuChoi BẮT BUỘC decision=Reject + 3 regression test
Defense-in-depth chặn FE inconsistency (gotcha #45 — Session 21 turn 3). Bug pattern: button "← Trả lại" trong PeWorkflowPanel.tsx gửi decision=Approve khi target=TraLai do `isReject` local var thiếu nhánh TraLai → BE skip Reject branch → enter APPROVE STEP → ApproveV2Async UPSERT opinion = "đã duyệt" + advance Cấp. User UAT thấy: "Trả về nhưng hệ thống vẫn duyệt". BE guard: - Service `TransitionAsync` thêm early check sau set isAdmin/isSystem - targetPhase ∈ {TraLai, TuChoi} && decision != Reject → throw ConflictException - Boundary protection cho mọi caller tương lai (API client / mobile / cron) Tests (Infra suite +3): - TransitionAsync_TargetTraLai_WithApproveDecision_Throws_AndDoesNotMutateState - TransitionAsync_TargetTuChoi_WithApproveDecision_Throws_AndDoesNotMutateState - TransitionAsync_TargetTraLai_WithRejectDecision_SetsPhaseTraLai (happy path) + NoOpNotificationService stub reusable cho future PE service tests Verify: - dotnet test SolutionErp.slnx → 84 PASS (58 Domain + 26 Infra = +3 from 81 baseline) - Build pass (0 err, 2 warn CS8602 pre-existing DocxRenderer) Pending Chunk B: FE fix PeWorkflowPanel.tsx isReject + dialog isSendBack mirror 2 app (fe-admin + fe-user) — sync với BE guard rule. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com> |
|||
| 90baa8e73c |
[CLAUDE] PurchaseEvaluation: Chunk B Service V2 hook UPSERT opinion + DTO + GET include
Service `ApproveV2Async` sau khi log approval (Decision=Approve) → UPSERT row `PurchaseEvaluationLevelOpinions` cho Cấp hiện tại (auto sync ý kiến từ comment khi duyệt). Reject KHÔNG sync. Match level theo ApproverUserId của actor (multi-NV cùng Cấp OR-of-N). Admin override (actor.Id KHÔNG match) → fallback first level — FE detect SignedByUserId !== Level.ApproverUserId hiển thị "Admin duyệt thay". Empty/whitespace comment → "(duyệt — không ý kiến)" placeholder (Q4 bonus). Helper `ResolveActorFullNameAsync(actorUserId, isSystem, ct)` lookup denorm SignedByFullName từ Users (fallback "(System)" / "(unknown)"). DTO `PurchaseEvaluationLevelOpinionDto` (15 fields): - StepOrder/StepName/StepDepartmentId/StepDepartmentName (Bước Phòng) - LevelOrder/LevelName/ApproverUserId/ApproverFullName (Cấp NV) - Comment/SignedAt/SignedByUserId/SignedByFullName (sign-off) GetPurchaseEvaluationQueryHandler: - Include LevelOpinions - helper BuildLevelOpinionsAsync JOIN ApprovalWorkflows.Steps.Levels + Departments + Users → denorm DTO. Empty list cho phiếu V1 / V2 chưa có cấp nào duyệt → FE fallback message. Verify: dotnet build pass + dotnet test 81 pass (no regression). Chunk C kế tiếp: FE Section 5 dynamic mirror 2 app. |
|||
| b41484b702 |
[CLAUDE] PE Workflow: wire Service V2 (Mig 24) — fix bug duyệt phiếu pin schema mới
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 3m14s
User báo bug eoffice: phiếu tạo mới không duyệt được + không bắt đc quy
trình mới. Root cause: Mig 23 pin ApprovalWorkflowId vào entity nhưng
Service vẫn đọc WorkflowDefinitionId legacy → match approver theo schema
cũ (Dept+PositionLevel/Role/User) thay vì ApproverUserId V2.
BE Domain — Migration 24 `AddCurrentApprovalLevelOrderToPe`:
- PurchaseEvaluation +CurrentApprovalLevelOrder int? (track Cấp 1/2/3
đang chờ duyệt trong Step hiện tại khi pin V2). Null khi terminal/V1.
- RejectedAtStepIndex giữ deprecated DB column cho data cũ.
BE Service PE — branch theo schema pin:
- V2 (`ApprovalWorkflowId` set): ApproveV2Async() — load
ApprovalWorkflows.Steps.Levels Include 3-level. Group Levels by Order
= Cấp (OR-of-N approvers). Match `actor.Id ∈ levelGroup.ApproverUserId`
(KHÔNG match Dept+Level/Role/User như V1). Advance:
Còn cấp tiếp trong Step → levelOrder++
Hết cấp → idx++, levelOrder=1
Hết Step → DaDuyet
- V1 legacy (chỉ `WorkflowDefinitionId` set): ApproveV1LegacyAsync() —
giữ nguyên logic Mig 21 (Dept+PositionLevel match)
- Drafter trình từ Nháp/Trả lại: init CurrentWorkflowStepIndex=0 +
CurrentApprovalLevelOrder=1 (chỉ khi V2 pin)
- Reject (Trả lại): clear CurrentApprovalLevelOrder=null
- Reject (Từ chối): clear all tracking
BE Synthetic Policy V2:
- `PurchaseEvaluationPolicyRegistry.ForV2Schema()` — simple state machine
policy (DangSoanThao/TraLai → ChoDuyet/TuChoi; ChoDuyet → ChoDuyet/
TraLai/TuChoi). Roles="*" cho ChoDuyet branch — Service tự enforce
ApproverUserId, Policy chỉ expose 3 nút FE.
- GetPurchaseEvaluationByIdQuery handler: ưu tiên ForV2Schema() khi pin
V2 (FE đọc workflow.nextPhases để show button).
Verify: 81 test pass · BE 0 error · Mig 24 applied cả 2 LocalDB.
Test thử (Drafter eoffice):
1. Designer V2 tạo quy trình QT-DN-V2-001: Bước 1 (Phòng A), Cấp 1 (NV X)
2. Workspace tạo phiếu mới, Select QT-DN-V2-001 → Lưu phiếu + Gửi duyệt
3. Phiếu Phase=ChoDuyet, idx=0, levelOrder=1. NV X login → thấy phiếu
trong Inbox + duyệt được. Sau approve → idx++, levelOrder reset 1.
4. Cấu hình level mismatch: NV Y khác → thấy ForbiddenException rõ tên.
Logic Contract V2 chưa wire (chỉ PE), defer Session sau khi user UAT PE OK.
|
|||
| ff21120c8c |
[CLAUDE] Workflow: State machine 5 trạng thái — Trả lại = Phase riêng
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 3m17s
Session 17 spec: chốt 5 trạng thái phiếu PE/HĐ/Budget theo state diagram:
Nháp ─trình──► Đã gửi duyệt ─approve cấp cuối──► Đã duyệt (terminal)
├─ Trả lại ────────► Trả lại
└─ Từ chối ────────► Từ chối (terminal)
Trả lại ──Drafter sửa+gửi lại──► Đã gửi duyệt (chạy LẠI từ đầu)
Khác Mig 21 (Session 16): bỏ smart-reject jump-back. Trả lại = Phase
RIÊNG (TraLai=98), không revert về DangSoanThao + không jump-back step.
Drafter từ TraLai gửi lại như case Nháp — workflow chạy lại từ Cấp 1
Bước 1 (Option A diagram chốt với user).
BE Domain:
- ContractPhase + TraLai = 98
- BudgetPhase + TraLai = 98
- PurchaseEvaluationPhase: TraLai=98 đổi từ [LEGACY deprecated] thành
primary state. Comment update enum docs cho cả 3.
BE Policy (PE/HĐ/Budget):
- Reject transitions trỏ về TraLai (thay DangSoanThao)
- Mirror entry transitions: TraLai → next phase (cho Drafter resubmit)
- ActivePhases thêm TraLai
- FromDefinition mirror: TraLai → step.Phase + reject → TraLai
- DefaultSla cho TraLai = same as DangSoanThao
BE Service (PE + Contract):
- Reject branch: target=TuChoi giữ; else set Phase=TraLai, clear
CurrentWorkflowStepIndex=null
- Bỏ ResumeAfterReject branch + RejectedAtStepIndex/RejectedFromPhase
assignment (DB column giữ deprecated cho data cũ)
- Drafter trình branch: từ DangSoanThao HOẶC TraLai → ChoDuyet, init
CurrentWorkflowStepIndex=0 (cùng entry point, chạy lại từ đầu)
- Notification: TraLai when fromPhase=ChoDuyet → "bị trả lại"
- Budget Handler: simplify reject → TraLai, bỏ smart-reject + isResuming
BE Tests update:
- WorkflowPolicyTests: Standard_RejectFromCCM → TraLai (rename + assert)
+ Standard_TraLai_To_DangGopY_Allowed_For_Drafter (new)
- PurchaseEvaluationPolicyTests: BothPolicies_RejectFromCCM → TraLai
+ BothPolicies_TraLai_To_ChoPurchasing_AllowedForDrafter (new theory)
- BudgetPolicyTests: Default_CostControl_ChoCCM_To_TraLai (rename)
+ ActivePhases All6States (was All5) + NextPhasesFrom_TraLai (new)
+ NextPhasesFrom_ChoCEO_Includes_DaDuyet_And_TraLai (rename)
- 77 → 81 test pass (+4 tests TraLai entry point)
FE rename "Bản nháp" → "Nháp" (cả 2 app + types):
- types/purchaseEvaluation.ts: PurchaseEvaluationPhaseLabel 1=Nháp,
10=Đã gửi duyệt. PeDisplayStatus.BanNhap → Nhap (key + value).
PhaseLabel/Color cho TraLai update active.
- types/contracts.ts: +ChoDuyet=10, +TraLai=98 const + label/color.
Phase 2 'Đang soạn thảo' → 'Nháp'.
- types/budget.ts: +TraLai=98 const + label/color. Phase 1 → 'Nháp'.
- PeListPanel + PurchaseEvaluationsListPage filter dropdown: Nhap +
TraLai map đúng phase value.
BE label maps update consistent:
- ContractExcelExporter PhaseLabel: DangSoanThao → "Nháp" + add ChoDuyet/
TraLai entries.
- PeWorkflowAdminFeatures + WorkflowAdminFeatures PhaseLabels: same.
Verify: dotnet test 81 pass · npm build × 2 app pass · BE 0 error.
Field RejectedAtStepIndex/RejectedFromPhase giữ DB column (nullable,
không set value mới). Cleanup migration sau.
|
|||
| dbb0089e28 |
[CLAUDE] Drastic refactor: flat workflow Phòng × Cấp + Migration 21 (Chunk A)
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 3m18s
User chốt drastic refactor — bỏ phase enum hoàn toàn, dùng ChoDuyet=10 đơn nhất + currentStepIndex tracking. Workflow flat list (Phòng × Cấp × Approvers). Mỗi PE/HĐ pin WorkflowDefinitionId chạy hết quy trình đó. Schema (Migration 21 `RefactorWorkflowToFlatModel`): - Phase enum +ChoDuyet=10 (PE + Contract). Legacy 2-9 + 98 deprecated. - WorkflowStep + DepartmentId Guid? (FK Restrict) + PositionLevel int? (PE + Contract — mirror). - PE/Contract + CurrentWorkflowStepIndex int? + RejectedAtStepIndex int? - DROP table PurchaseEvaluationWorkflowStepInnerSteps (Mig 18) - DROP table WorkflowStepInnerSteps (Mig 20) - DROP column ContractDeptApproval.InnerStepId (Mig 20) - DROP column PEDeptApproval.InnerStepId (Mig 18) - DROP filtered indexes (Mig 19/20) + restore simple unique (TargetId, Phase, Dept, Stage) non-filtered Service rewrite (PE + Contract WorkflowService.TransitionAsync): - Phase transitions: DangSoanThao → ChoDuyet (Drafter trình, init idx=0) - ChoDuyet → ChoDuyet (advance idx per approve) - ChoDuyet → DaDuyet/DaPhatHanh (idx >= steps.Count → terminal) - ChoDuyet → DangSoanThao (Trả lại — save RejectedAtStepIndex) - ChoDuyet → TuChoi (Từ chối — khoá vĩnh viễn) - DangSoanThao + RejectedAtStepIndex → ChoDuyet jump-back to saved idx - Approver match: actor.Dept == step.Dept AND actor.PositionLevel >= step.PositionLevel (OR-of-many cùng cấp/dept = pass) OR Approvers.Any(Kind=User AND id match) OR Approvers.Any(Kind=Role AND actorRoles contains) - Admin role bypass policy. Last step done → gen mã HĐ (Contract only) App CQRS: - WorkflowStepDto + WorkflowStepInput drop InnerStep, add DepartmentId + PositionLevel fields. PE + Contract mirror. Tests rewrite: - DROP PeNStageApprovalTests.cs (6 test) + ContractNStageApprovalTests.cs (6 test) + PeTwoStageApprovalTests.cs (7 test) — legacy N-stage/2-stage no longer applicable - UPDATE PeWorkflowAdminTests signature to new flat input - 96 → 77 test pass (drop 19 legacy) Reference Domain entities removed: - WorkflowStepInnerStep (Contract) - PurchaseEvaluationWorkflowStepInnerStep (PE) - DTOs WorkflowStepInnerStepDto / CreateWorkflowStepInnerStepInput per module Memory `feedback_drastic_refactor_scope.md` validated: drastic refactor done in dedicated session với context fresh, scope ~5h actual (planned ~8-10h with 2x buffer). Verify: - dotnet build SolutionErp.slnx 0 error - dotnet ef database update Mig 21 LocalDB applied OK - dotnet test 77 pass (54 Domain + 23 Infra) - 3-file rule: Migration .cs + Designer.cs + Snapshot updated Pending Chunk B: FE Designer flat UI (PeWorkflowsPage + WorkflowsPage). Pending Chunk C: FE PeWorkflowPanel + workflow timeline display. Pending Chunk D: Docs + Skill + Memory + session log. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com> |
|||
| 0d776987e4 |
[CLAUDE] PE workflow 3-button Duyệt/Trả lại/Từ chối (Task 4)
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 3m6s
User chỉ thị thay 2-button hiện tại bằng 3 hành động rõ ràng:
- Duyệt = forward phase tiếp theo
- Trả lại = về DangSoanThao + Drafter sửa → workflow tự jump tới phase
đã reject (smart reject Mig 16 pattern + clear N-stage rows)
- Từ chối = phiếu khoá hoàn toàn (Phase=TuChoi → 17 handler Mig 16 lock
edit). Drafter phải tạo phiếu mới.
Domain (PurchaseEvaluationPolicy.cs):
- NccOnly + NccWithPlan: thêm (X → TuChoi) transition cho mọi phase
trung gian (ChoPurchasing/ChoCCM/ChoCEODuyetNCC/ChoDuAn/ChoCEODuyetPA)
với roles của phase đó. Trước đây chỉ DangSoanThao → TuChoi (Drafter).
- FromDefinition expand: mỗi step (trừ DangSoanThao) thêm
(step.Phase → TuChoi) với roles của step.
Service (PurchaseEvaluationWorkflowService.cs):
- Reject branch tách 2 case:
* target=TuChoi → giữ nguyên (KHÔNG override + KHÔNG set
RejectedFromPhase + KHÔNG clear N-stage rows). Phiếu khoá vĩnh viễn.
* target khác (thường DangSoanThao) → smart reject (set
RejectedFromPhase + force DangSoanThao + clear N-stage rows).
FE (PeWorkflowPanel.tsx, fe-admin + fe-user mirror):
- next.phases render 3 button rõ ràng:
* "✓ Duyệt → <label>" brand (forward)
* "← Trả lại (về Drafter sửa)" red (target=DangSoanThao + isSendBack)
* "✗ Hủy / Từ chối" red (target=TuChoi)
- Decision logic: target=TuChoi || isSendBack → Reject (2), else Approve (1)
- Dialog confirm:
* Title rõ theo loại hành động
* Cancel case: warning red "Phiếu sẽ bị khoá hoàn toàn"
* SendBack case: hint amber "Phiếu sẽ về Đang soạn thảo, Drafter sửa
rồi trình lại — workflow tự jump tới phase này"
Tests update + add 1 test mới:
- Reject_Sets_RejectedFromPhase_And_Forces_DangSoanThao →
Reject_To_DangSoanThao_Sets_RejectedFromPhase_TraLai (rename + change
target từ TuChoi → DangSoanThao để test Trả lại pattern)
- + Reject_To_TuChoi_Locks_Permanently_No_RejectedFromPhase (NEW test
Từ chối — phase=TuChoi + RejectedFromPhase null)
- NStage_Reject_Clears_InnerStep_Rows_At_Phase: target TuChoi →
DangSoanThao (test Trả lại + clear N-stage rows pattern)
Verify:
- dotnet build 0 error
- dotnet test 95 → **96 pass** (+1 test mới Từ chối)
- npm build fe-admin + fe-user pass
Pending Task 2: Sample data seed N-stage.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
|
|||
| e247b67681 |
[CLAUDE] Infra: ContractWorkflowService N-stage logic mirror PE (Chunk C)
Some checks failed
Deploy SOLUTION_ERP / build-deploy (push) Has been cancelled
Refactor TransitionAsync mirror PurchaseEvaluationWorkflowService Mig 18
N-stage pattern:
- Reject branch: clear N-stage approval rows tại fromPhase (resume sẽ
approve lại từ inner đầu)
- Load definition with InnerSteps eager + assign outer scope
- Department approval block split:
* hasInnerSteps=true → N-stage logic:
- Yêu cầu actor có DeptId + PositionLevel set (else throw 403)
- Match firstPending (Order asc IsRequired) same dept + (exact level
OR canBypass + level≥)
- exact match: upsert 1 row InnerStepId, IsBypassed=false
- bypass: batch upsert NV+PP+TP cùng dept ≤ actor (audit IsBypassed
cho cấp dưới)
- Recheck stillPending → BLOCK + log Approval/Changelog "duyệt cấp X
(còn Y pending)"
- All done → fall through phase transition
* hasInnerSteps=false → Legacy 2-stage Mig 16 (giữ nguyên với
InnerStepId=null filter)
Backward compat 100%: workflow Contract no InnerSteps configured →
service fallback legacy 2-stage NV.Review/TPB.Confirm. Tests 89 pass —
no regression.
Verify: dotnet build 0 error, dotnet test 89 pass.
Pending Chunk D: ContractNStageApprovalTests 6 test mirror PE pattern.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
|
|||
| 0c62e241d0 |
[CLAUDE] Infra: PE workflow service N-stage logic + Migration 19 unique filter (Chunk C)
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 3m2s
Migration 19 `AlterPeDeptApprovalsUniqueFilteredForInnerSteps` — fix
UNIQUE constraint conflict khi N-stage có nhiều inner step cùng dept:
- Drop UX_PEDeptApprovals_PE_Phase_Dept_Stage (Mig 16)
- Recreate filtered: UNIQUE (PEId, Phase, Dept, Stage) WHERE InnerStepId IS NULL
(legacy 2-stage rows giữ nguyên invariant)
- New filtered: UNIQUE (PEId, Phase, InnerStepId) WHERE InnerStepId IS NOT NULL
(N-stage 1 row per inner step per phase)
PurchaseEvaluationWorkflowService.TransitionAsync refactor:
- Load definition with InnerSteps eager (.Include ThenInclude)
- Reject branch: clear N-stage approval rows tại fromPhase (resume sẽ
approve lại từ inner step đầu — clean state)
- Department approval block split:
* hasInnerSteps=true → N-stage logic:
- Yêu cầu actor có DepartmentId + PositionLevel set (else throw 403)
- Match firstPending inner step (Order asc, IsRequired only):
same dept AND (exact PositionLevel OR canBypass + level ≥ pending)
- exact match: upsert 1 row (Stage=Confirm, InnerStepId=that)
- bypass: batch upsert NV+PP+TP cùng dept ≤ actor level (audit
IsBypassed=true cho cấp dưới skip)
- Recheck stillPending → BLOCK transition + log Approval/Changelog
"đã duyệt cấp X (còn Y cấp pending)"
- All done → fall through phase transition
* hasInnerSteps=false → Legacy 2-stage (Mig 16) — giữ nguyên logic
NV.Review/TPB.Confirm + InnerStepId=null filter
Backward compat: workflow cũ (no InnerSteps configured) chạy đúng logic
2-stage Mig 16. Data legacy InnerStepId=null vẫn match unique cũ qua
filtered index. Tests 83 pass — no regression.
Verify:
- dotnet build SolutionErp.slnx 0 error
- dotnet ef database update LocalDB applied Mig 19
- dotnet test 83 pass
Pending Chunk D: Tests N-stage workflow (~6-7 test mới: sequential pass /
bypass cùng dept / reject reset / resume jump-back / legacy fallback).
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
|
|||
| b6f5a16420 |
[CLAUDE] Infra+App+Api+FE: Chunk E4 — HĐ 2-stage dept approval (mirror PE)
Mở rộng 2-stage logic từ PE sang Contract workflow (Migration 16 đã có schema):
BE Service:
- ContractWorkflowService thêm UserManager<User> DI
- Mirror logic 2-stage từ PurchaseEvaluationWorkflowService.TransitionAsync
Sau policy guard, trước gen mã HĐ:
- User.DepartmentId != null + actor không admin/system + KHÔNG resume
- DeptManager (TPB) → Stage=Confirm trực tiếp
- CanBypassReview=true → Stage=Confirm + IsBypassed=true
- Else (NV) → Stage=Review only, BLOCK transition
- Insert ContractDepartmentApproval row (UPSERT theo UNIQUE)
- Block transition khi chưa có Stage=Confirm:
- Insert ContractApproval (FromPhase=ToPhase=fromPhase, [Review NV] comment)
- Insert ContractChangelog "đã review, chờ TPB confirm"
- Notify TPB cùng dept (UserManager filter DeptManager role)
- Return early — phase KHÔNG đổi
App + Api:
- ContractDepartmentApprovalFeatures.cs (List query mirror PE)
- ContractsController endpoint GET /contracts/{id}/department-approvals
FE (cả fe-admin + fe-user):
- types/contracts.ts thêm ApprovalStage const + ContractDepartmentApproval type
- WorkflowHistoryPanel section "Tiến trình duyệt 2-cấp phòng ban":
- Group by phase × dept, show Review NV + Confirm TPB
- Highlight amber "chờ TPB confirm" khi current phase có Review chưa Confirm
- Badge fuchsia "bypass" khi NV.CanBypassReview=true
- Insert giữa WorkflowSummaryCard và Lịch sử duyệt
- Mirror cả 2 app (rule §3.9)
Use case mirror PE: HĐ ở phase DangGopY (P.CCM) — nv.cao (NV) duyệt thì
phase KHÔNG đổi (Review only), chờ ccm.tran (TPB) confirm mới sang DangXetDuyet.
Build: BE pass + FE pass cả 2 + 77 test pass.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
|
|||
| 3c4931687a |
[CLAUDE] App+Api+Docs: Chunk E1 — List endpoint + Bypass-review + Notify TPB + chốt session 8
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 3m15s
3 endpoint mới + Notify TPB + Docs update để chốt session 8.
Application:
- PurchaseEvaluationDepartmentApprovalFeatures.cs (NEW):
* ListPeDepartmentApprovalsQuery + DTO PeDepartmentApprovalDto
* Join Departments (lấy Name) + lookup Users.FullName denorm cho FE timeline
- UserFeatures.cs: SetUserBypassReviewCommand + Handler dùng UserManager.UpdateAsync
- IApplicationDbContext: thêm DbSet<User> Users + DbSet<Role> Roles (cần cho lookup)
Api:
- PurchaseEvaluationsController: GET /api/purchase-evaluations/{id}/department-approvals
- UsersController: PATCH /api/users/{id}/bypass-review (Authorize Users.Update)
Infra:
- PurchaseEvaluationWorkflowService: notify TPB cùng dept khi NV review.
Query db.Users.Where(DeptId match + IsActive) → UserManager.GetRolesAsync
filter DeptManager → notifications.NotifyAsync. Best effort fail non-critical.
Docs:
- STATUS.md: Recently Done thêm row session 8 + Phase header update
count 52→55 tables, 15→16 migrations, 128→131 endpoints
- HANDOFF.md: TL;DR session 8 + 8 cảnh báo session 9 (FE chưa làm,
test flow anh Kiệt, smart reject test, lock edit test, ...)
- migration-todos.md: Phase 9 done section đầy đủ 3 ràng buộc + pending Chunk E-bis
- CLAUDE.md: count 52→55 + migration 16 description
- session log: 2026-05-04-1230-chot-session-8-2-stage-dept-approval.md (full report)
Verify final:
- Build pass 0 warning 0 error
- 77 unit test pass (54 Domain + 23 Infra)
- Migration 16 applied LocalDB OK + schema verified
Total session 8 cumulative: 5 commit per-chunk:
- 5fe61cc (A: Migration 16 schema)
-
|
|||
| a532ba6fc3 |
[CLAUDE] Infra: Chunk D — PE 2-stage dept approval (đóng bug anh Kiệt báo)
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 3m22s
Ràng buộc 3 (Phase 9) scope tối giản: chỉ PE workflow trước. Đóng bug
"NV duyệt được hết phase" anh Kiệt báo trong chat FDC.
Logic 2-stage trong PurchaseEvaluationWorkflowService.TransitionAsync,
chèn sau policy guard, trước phase transition:
1. Detect approving phase với role thuộc phòng ban:
- decision == Approve
- target != DangSoanThao && != TuChoi
- Không reject + không resume + không admin/system
- actorUserId != null + actor.DepartmentId != null
2. Stage detection:
- DeptManager (TPB) → Stage=Confirm trực tiếp (TPB tự confirm được)
- User.CanBypassReview=true → Stage=Confirm + IsBypassed=true (NV bypass)
- Else (NV thường) → Stage=Review only
3. Upsert PurchaseEvaluationDepartmentApproval row:
- UNIQUE (PEId, PhaseAtApproval, DepartmentId, Stage) đảm bảo 1 row
- UPDATE in-place khi user click Duyệt lần 2 (đổi comment)
- ApproverRoleSnapshot: "TPB" / "NV(bypass)" / "NV" denorm cho audit
4. Check Stage=Confirm tồn tại cho (PEId, fromPhase, deptId):
- hasConfirm = vừa insert Stage=Confirm OR đã có sẵn
- !hasConfirm → BLOCK phase transition:
* Insert PEApproval row (FromPhase=ToPhase=fromPhase, Decision=Approve,
Comment="[Review NV] ...") để track audit
* Insert Changelog "NV X đã review phase Y, chờ TPB confirm"
* Return early — Phase KHÔNG đổi
- hasConfirm → tiếp tục normal phase transition logic
5. Skip 2-stage hoàn toàn khi:
- Decision=Reject (smart reject Chunk C đã handle)
- Resume after reject (target đã pinned)
- Admin role hoặc System (auto-approve)
- actorUserId == null hoặc actor.DepartmentId == null
Bug fix verified theo flow anh Kiệt:
- User long.chau (NV.PRO, role=Procurement, DepartmentId=PRO) tạo phiếu
- long.chau click Duyệt phase ChoPurchasing → ChoCCM:
- actor.DepartmentId=PRO → 2-stage logic active
- role=Procurement, không có DeptManager → Stage=Review
- hasConfirm=false → BLOCK transition
- Insert PEDeptApproval(PE, ChoPurchasing, PRO, Review)
- Phase giữ nguyên ChoPurchasing
- TPB.PRO (tra.bui có role DeptManager + DeptId=PRO) click Duyệt:
- role=DeptManager → Stage=Confirm
- hasConfirm=true (vừa insert) → ALLOW transition
- Phase chuyển ChoPurchasing → ChoCCM
- NV CCM lặp pattern tương tự ở phase ChoCCM
- Cuối cùng CEO/AuthSigner duyệt ChoCEODuyetNCC → DaDuyet (CEO không thuộc
dept cụ thể nên bypass 2-stage)
Pending Chunk E:
- TODO notify TPB cùng dept khi NV review (best effort, chưa implement)
- List endpoint GET /api/purchase-evaluations/{id}/department-approvals
cho FE hiển thị progress 2-stage
- UserManager API PATCH /api/users/{id}/bypass-review
- FE Workflow Panel update + UserManager toggle
HĐ + Budget 2-stage scope sẽ làm sau khi PE verify UAT (per default chốt
trước đó).
Verify:
- Build pass (2 warning DocxRenderer cũ)
- 77 unit test pass — Domain policy chưa đụng
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
|
|||
| 9747f8cbf5 |
[CLAUDE] Infra+App: Chunk C — Smart reject + Resume after reject (3 module)
Ràng buộc 2 (Phase 9): khi reject, trả về Drafter (DangSoanThao) + lưu phase nguồn. Drafter sửa lại + trình lại → quay về phase đã reject (skip phase trung gian). Logic flow: 1. Reject (Decision=Reject): - entity.RejectedFromPhase = currentPhase // snapshot phase đang reject - targetPhase override = DangSoanThao // force về Drafter - Approval row: FromPhase=X, ToPhase=DangSoanThao, Decision=Reject - Notification cho Drafter 2. Resume after reject (Decision=Approve, fromPhase=DangSoanThao, RejectedFromPhase != null): - targetPhase override = entity.RejectedFromPhase!.Value - entity.RejectedFromPhase = null // clear field - Skip policy guard (Drafter có quyền trình lại sau khi sửa) - Approval row: FromPhase=DangSoanThao, ToPhase=ResumePhase, Decision=Approve 3. Normal transition (chưa reject hoặc đã clear): - Logic cũ giữ nguyên — policy guard check + transition Pattern unified cho 3 module: - ContractWorkflowService.TransitionAsync: 2 case detect + override - PurchaseEvaluationWorkflowService.TransitionAsync: tương tự - TransitionBudgetCommandHandler.Handle: tương tự (Budget không có service riêng, logic ở handler) Files: - src/Backend/SolutionErp.Infrastructure/Services/ContractWorkflowService.cs - src/Backend/SolutionErp.Infrastructure/Services/PurchaseEvaluationWorkflowService.cs - src/Backend/SolutionErp.Application/Budgets/BudgetFeatures.cs Verify: - Build pass (2 warning DocxRenderer cũ, không liên quan) - 77 unit test pass — Domain policy không đổi, tests giữ nguyên Note: Approval history giờ track đầy đủ cycle reject→sửa→resume: Approval 1: DangGopY → DangSoanThao, Decision=Reject (CCM reject) Approval 2: DangSoanThao → DangGopY, Decision=Approve (Drafter resume) UI có thể detect "đã từng reject" qua RejectedFromPhase != null hoặc qua Approval history (Decision=Reject row gần nhất). Hiển thị banner đỏ "Phiếu đã bị reject từ phase X, lý do: Y" cho Drafter. Smart reject hoàn tất Ràng buộc 2. Còn Ràng buộc 3 (2-stage dept approval) ở Chunk D. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com> |
|||
| c48ac2116d |
[CLAUDE] PurchaseEvaluation: demo seed 4 phieu + MaPhieu atomic sequence + Pe_* perm defaults
Polish session tiep cua PE module skeleton (commit 2c6f0ca..3990066):
3 task A (MISSING in MVP) khac STATUS.md In Progress:
1. Demo PE data seed (SeedDemoPurchaseEvaluationsAsync)
- 4 phieu varied A/B x phase: A-001 DangSoanThao (mo), A-002
ChoCEODuyetNCC (winner+9 quotes), A-003 DaDuyet (chua tao HD,
PaymentTerms JSON), B-001 ChoDuAn (5-step giua chung).
- Idempotent: skip-if-[DEMO]-exists.
- Approval history dung policy A (3-step) hoac B (5-step).
2. MaPhieu atomic sequence — Migration 13
- Format PE/{YYYY}/{TypeLetter}/{Seq:D3} (vd PE/2026/A/001).
- PurchaseEvaluationCodeSequence entity (Prefix PK).
- IPurchaseEvaluationCodeGenerator + impl SERIALIZABLE
transaction (mirror ContractCodeGenerator 1:1).
- Replace Random.Shared trong CreatePurchaseEvaluationCommandHandler.
- Migration AddPurchaseEvaluationCodeSequences (1 bang).
3. Pe_* permission defaults
- SeedPurchaseEvaluationPermissionDefaultsAsync — 7 role business x 9 menu key.
- Drafter/DeptManager/Procurement: R+C+U; CostControl/PM/Director/AuthorizedSigner: R+U.
- DeptManager them Delete (xoa nhap).
- Idempotent per-(roleId x menuKey).
Build: 0 error, 2 warning (pre-existing DocxRenderer).
Files: 4 new + 8 modified (1 migration + entity + generator + DI + 2 ctx + 2 features).
Resolves: STATUS.md In Progress §A — 3 item PE MISSING.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
|
|||
| 4678d192e2 |
[CLAUDE] App+Api: PurchaseEvaluation CQRS + Controller + WorkflowService
Application (4 file, ~900 lines): - IPurchaseEvaluationWorkflowService + PurchaseEvaluationDtos - PurchaseEvaluationFeatures: Create / UpdateDraft / Transition / List / Inbox / GetDetail (bundle Suppliers+Details+Quotes+Approvals+Workflow) / Delete / ListChangelogs. IDOR filter role-based phase eligibility. - PurchaseEvaluationSupplierFeatures: Add / Update / Remove supplier (N:M Phiếu × Supplier). Block remove nếu còn Quote FK reference. - PurchaseEvaluationDetailFeatures: Add/Update/Delete hạng mục + Upsert/Delete Quote + SelectWinner (set SelectedSupplierId). Infrastructure: - PurchaseEvaluationWorkflowService: policy load pinned definition → guard role + transition rules. Emit Notification drafter khi state-change. Tạo PurchaseEvaluationApproval + Changelog row. Api: - PurchaseEvaluationsController ~15 endpoint: CRUD phiếu, N:M supplier, hạng mục CRUD, Quote upsert, SelectWinner, Changelog list. Route /api/purchase-evaluations. DI: đăng ký IPurchaseEvaluationWorkflowService scoped. Skip MVP: Attachments upload, Admin PeWorkflows designer UI (sẽ phase sau — framework versioned WF table đã sẵn, designer pattern copy từ HĐ). |
|||
| 4edcd588d8 |
[CLAUDE] Domain+Infra: User-kind approver runtime guard + Warning 20% SLA
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 2m41s
## User-kind approver guard
Trước: WorkflowDefinition Designer cho admin pick User cụ thể vào step
approver, nhưng runtime guard bỏ qua (User-kind treat như DeptManager
fallback per skill doc).
Bây giờ: enable đầy đủ. WorkflowPolicy + UserTransitions parallel dict
(default null cho hardcoded Standard/SkipCcm, populated qua
FromDefinition khi WorkflowStepApprover Kind=User).
IsTransitionAllowed signature update: (from, to, actorRoles, actorUserId?)
- Check Role first (existing behavior)
- Fallback User-kind: actorUserId.ToString() có trong UserTransitions[(from,to)]?
ContractWorkflowService.TransitionAsync dùng IsTransitionAllowed thay
inline check. Error message thêm "{N} user explicit" nếu policy có
User-kind approvers cho transition đó.
FromDefinition cũng update: nếu step CHỈ có User-kind (không Role),
không fallback DeptManager nữa — guard sẽ check user-level. Chỉ
fallback DeptManager nếu step thiếu cả 2.
## Warning 20% SLA
SlaExpiryJob.ProcessWarningsAsync mới — chạy trước ProcessAsync
(auto-approve quá hạn):
- Pull Contracts WHERE !SlaWarningSent && SlaDeadline > now &&
Phase NOT IN (DaPhatHanh, TuChoi, DangDongDau)
- Per phase, threshold = 20% × default SLA (vd Soạn thảo 7 ngày → 33.6h
remaining trigger warning; In ký 1 ngày → 4.8h)
- Compute remaining = SlaDeadline - now; nếu remaining <= threshold
+ còn slot → notify Drafter via INotificationService
- Set SlaWarningSent = true để chỉ warning 1 lần per phase (reset trong
TransitionAsync khi chuyển phase mới)
- NotificationType.SlaWarning (đã có trong enum) + title icon ⚠
## Build
dotnet build BE pass (0 error)
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
|
|||
| 51449d6b9d |
[CLAUDE] App+Infra: Mã HĐ gen ngay tại CreateContract + backfill HĐ legacy
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 2m45s
User feedback: HĐ phải có mã ngay khi tạo (không đợi đến DangDongDau như
cũ). HĐ đã tạo trước đây nhưng chưa có mã → backfill tự động.
## Thay đổi
### CreateContractCommandHandler (App)
- Inject IContractCodeGenerator
- Load supplier + project FULL (cần Code, không chỉ check tồn tại như trước)
- Call codeGenerator.GenerateAsync TRƯỚC khi db.Contracts.Add — entity
chưa tracked nên GenerateAsync internal SaveChangesAsync chỉ save SEQ
(không kèm contract chưa tracked)
- Set entity.MaHopDong = result trước khi Add → INSERT contract đã có mã
- Changelog summary include mã: "Tạo HĐ {mã} — {tên}"
### Trade-off documented
- Mã gen sớm → HĐ TuChoi sẽ "wasted" 1 mã (gap trong sequence)
- Acceptable vì user cần mã reference vào tài liệu/giấy tờ ngay từ đầu
### ContractWorkflowService.TransitionAsync (Infra)
- Giữ logic cũ `if MaHopDong is null → gen` ở DangDongDau
- Update comment: nominal flow skip vì mã đã có; defensive cho HĐ legacy
hoặc HĐ tạo bằng path khác (seed/import)
### DbInitializer.BackfillContractCodesAsync (Infra)
- Chạy 1 lần trước WarnDefaultAdminPasswordAsync
- Idempotent: count Contracts WHERE MaHopDong IS NULL → skip nếu 0
- Loop từng HĐ: load supplier+project → GenerateAsync → SaveChangesAsync
- Skip + log warning nếu missing supplier/project (legacy data corruption)
- Try-catch per HĐ, log success/failed count cuối cùng
## Build
dotnet build BE pass (0 error, 2 pre-existing DocxRenderer warning)
## Note
Khi deploy lên prod, DbInitializer chạy startup → backfill HĐ cũ tự động.
Log line "Backfill mã HĐ: X HĐ thiếu mã, đang gen..." sẽ xuất hiện ở
Logs/log-{date}.txt để verify.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
|
|||
| 71c035d31e |
[CLAUDE] App+Infra: IChangelogService + log Workflow/Contract/Comment/Attachment
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 2m26s
User decision B (log cả 3): mọi thay đổi liên quan HĐ ghi vào unified ContractChangelogs để render tab Lịch sử FE. ## IChangelogService (Application/Common/Interfaces/) 5 methods: - LogContractChangeAsync — Header insert/update - LogDetailChangeAsync — line item insert/update/delete - LogWorkflowTransitionAsync — phase change (parallel với ContractApprovals) - LogCommentAddedAsync — góp ý mới - LogAttachmentAsync — upload/delete file KHÔNG SaveChanges trong service — caller chịu trách nhiệm save atomic cùng business changes (pattern giống INotificationService). ## ChangelogService impl - Resolve actor qua ICurrentUser → UserManager.FindByIdAsync - Denormalize UserName (FullName ?? Email) cho log readable - null UserId = system action (vd SLA auto-approve) - DI: AddScoped trong DependencyInjection.cs ## Wiring vào handlers hiện tại - ContractWorkflowService.TransitionAsync — LogWorkflowTransitionAsync sau khi insert ContractApproval - CreateContractCommandHandler — LogContractChangeAsync(Insert) - UpdateContractDraftCommandHandler — diff GiaTri/TenHopDong/NoiDung/ TemplateId trước update, log update với fieldChangesJson nếu có thay đổi - AddCommentCommandHandler — LogCommentAddedAsync - UploadContractAttachmentCommandHandler — LogAttachmentAsync(Insert) - DeleteContractAttachmentCommandHandler — LogAttachmentAsync(Delete) Build: dotnet build BE pass (0 error, 2 pre-existing warning trong DocxRenderer.cs) Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com> |
|||
| e7e5f2d066 |
[CLAUDE] Domain+Infra+App+Api+FE-Admin: versioned workflow per ContractType
Some checks failed
Deploy SOLUTION_ERP / build-deploy (push) Failing after 1m32s
User yêu cầu: mỗi loại HĐ có quy trình riêng với admin add roles + users vào từng bước. Khi tạo version mới → HĐ tương lai chạy theo, HĐ cũ giữ version cũ. Domain: - WorkflowDefinition (Code + Version + ContractType + IsActive + Steps) - WorkflowStep (Order + Phase + Name + SlaDays + Approvers) - WorkflowStepApprover (Kind: Role/User + AssignmentValue) - Contract.WorkflowDefinitionId — pinned at creation - WorkflowPolicyRegistry.FromDefinition() — build runtime policy từ DB Infrastructure: - EF config + migration AddVersionedWorkflows (3 table mới) - DbInitializer.SeedWorkflowDefinitionsAsync: v01 per 7 ContractType, steps sinh từ hardcoded WorkflowPolicies (Role approvers). - ContractWorkflowService.TransitionAsync: load pinned WorkflowDefinition → FromDefinition(), fallback cho HĐ cũ không có pin. Application: - CreateContractCommand pin WorkflowDefinitionId = active version cho type - ContractFeatures.Get(id): load pinned def cho workflow summary - WorkflowAdminFeatures: GetWorkflowAdminOverviewQuery (7 types + active + history + ContractsUsingCount), CreateWorkflowDefinitionCommand (validate payload, auto-increment version, deactivate old). Api: - GET /api/workflows trả overview - POST /api/workflows tạo version mới (deactivate old) FE /system/workflows: - Tabs per 7 ContractType, mỗi tab hiện active version + lịch sử - DefinitionCard: steps với badge role/user + SLA + archived indicator hiện "N HĐ còn chạy" cho version cũ - WorkflowDesigner modal: form code/name/desc + danh sách steps (phase/name/SLA) + approvers (+ Role hoặc + User). Drop step ok. Clone từ version hiện tại để tạo v02 có điểm start sensible. - Amber banner: HĐ cũ không bị ảnh hưởng khi tạo version mới Invariants được giữ: - Unique (Code, Version) index - Chỉ 1 version IsActive per ContractType tại 1 thời điểm - Set default sẽ auto xóa override → respect legacy override table - Role-kind approvers drive transition guards; User-kind fallback DeptManager role cho v1 (user-level targeting = iteration 2) Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com> |
|||
| 5e0f3801a1 |
[CLAUDE] Move nested-type menu → fe-user; Admin workflow config page
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 2m41s
User clarified: menu loại HĐ 3-level (Danh sách/Thao tác/Duyệt) thuộc
fe-user. Admin có page riêng để config quy trình per loại HĐ.
fe-admin Layout:
- filterForAdmin() drops Ct_* entries (hide nested type menu).
- Admin sidebar giờ về lại đơn giản: Dashboard / Master / Hợp đồng
(leaf) / Forms / Reports / System.
fe-user Layout:
- Dynamic menu tree từ /menus/me (thay fixed USER_MENU hardcoded).
- Recursive MenuNodeRenderer (top-level expanded, nested collapsed).
- resolvePath user-specific: Ct_*_List → /my-contracts?type=X,
Ct_*_Create → /contracts/new?type=X, Ct_*_Pending → /inbox?type=X.
- filterForUser drops admin-only entries (Master/System/Forms/Reports).
- Static USER_FIXED_TOP prepends "Hộp thư" leaf → /inbox.
- MyContractsPage + InboxPage đọc ?type=X param, filter client-side.
Workflow config (Admin side):
- Domain: WorkflowTypeAssignment entity (ContractType → PolicyName
override). Registry.ForContractWithOverrides() prefer DB override
else default.
- Infrastructure: EF config + migration AddWorkflowTypeAssignments,
unique index trên ContractType. ContractWorkflowService load
overrides dict mỗi transition. ContractFeatures load overrides khi
build WorkflowSummaryDto.
- Application: GetWorkflowAdminOverviewQuery returns 7 types × current
policy + available policies. SetWorkflowAssignmentCommand validate
policy name tồn tại; nếu = default thì delete override (no stale row).
- Api: GET /api/workflows + PUT /api/workflows/{contractType}
với policy "Workflows.Read" + "Workflows.Update".
- Menu: new key `Workflows` dưới System, label "Quy trình HĐ".
- FE /system/workflows: 7 card per type, dropdown Standard/SkipCcm +
'Đã override' badge khi khác default, phase sequence timeline,
explanation banner ở top. Iteration 2 note: admin-authored custom
policies.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
|
|||
| cae4d84830 |
[CLAUDE] Domain+Infra+App+FE: dynamic workflow policy per ContractType
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 2m42s
Đọc QT-TP-NCC.docx: quy trình 9 bước chỉ áp dụng cho Thầu phụ/NCC/Tổ đội.
Dịch vụ/Mua bán/Nguyên tắc bypass CCM. Thay hardcoded dict bằng policy
registry.
Domain — WorkflowPolicy.cs:
- Record WorkflowPolicy { Name, Description, Transitions, PhaseSla,
ActivePhases } — pure data, testable.
- WorkflowPolicies.Standard: 9-phase full (Thầu phụ/Giao khoán/NCC)
- WorkflowPolicies.SkipCcm: 7-phase (Dịch vụ/Mua bán/Nguyên tắc)
- WorkflowPolicyRegistry.For(type) map ContractType → policy
- WorkflowPolicyRegistry.ForContract(c) override nếu BypassProcurement
AndCCM=true (instance-level escape hatch)
Infrastructure — ContractWorkflowService:
- Xóa hardcoded Transitions/PhaseSla dicts → load từ policy.ForContract
- TransitionAsync: validate qua policy.Transitions thay vì dict local
- Error message include policy.Name để debug dễ hơn
- GetPhaseSla trả SLA từ Standard policy (fallback — SLA hiện tại giống
nhau giữa 2 policy)
Application — ContractDetailDto:
- Field mới `Workflow: WorkflowSummaryDto { PolicyName, Description,
ActivePhases, NextPhases }` — FE dùng để render nút chuyển phase
dynamic + timeline card.
- BuildWorkflowSummary helper trong ContractFeatures.
FE (both apps):
- Type WorkflowSummary + ContractDetail.workflow
- ContractDetailPage xóa hardcoded NEXT_PHASES — dùng
c.workflow.nextPhases từ BE (single source of truth)
- WorkflowSummaryCard: timeline của ActivePhases với check/current/
future states + policy name/description ở header
- Card hiển thị trong sidebar, phía trên "Lịch sử duyệt"
Docs:
- gotchas.md #21 marked RESOLVED (NEXT_PHASES sync không còn cần)
Foundation: sau này admin có thể edit policy qua UI khi chuyển sang DB-
backed policy — nhưng API contract (WorkflowSummaryDto) đã stable.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
|
|||
| 49c0ddc8f4 |
[CLAUDE] App+Domain+Infra+Api+FE: Notifications module end-to-end
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 2m43s
Domain: - Notification entity + NotificationType enum (stable ints) - Nullable RefId cho correlation (contract, user, ...) Infrastructure: - NotificationConfiguration: bảng Notifications, index theo (UserId, ReadAt) - NotificationService: ghi vào DbContext, không SaveChanges (để caller quyết định unit-of-work — đảm bảo atomic với domain mutation) - EF migration AddNotifications Application: - INotificationService (Notify + NotifyMany) - CQRS: ListMyNotifications / GetMyUnreadCount / MarkRead / MarkAllRead Api: - NotificationsController: GET /api/notifications + unread-count + mark-read Integration: - ContractWorkflowService emit notification tới Drafter khi HĐ chuyển phase (skip nếu actor chính là Drafter). Title + type theo phase đích: DaPhatHanh → ContractPublished, TuChoi → ContractRejected, khác → ContractPhaseTransition. FE: - Both NotificationBell (admin + user) dùng /api/notifications thật (thay cho derived-from-inbox MVP trước đó). 30s refetch, click mark-read, 'Đọc hết' bulk action. Foundation sẵn cho SignalR push + email outbox sau này — chỉ cần mở rộng NotificationService mà không đổi caller. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com> |
|||
| 7e957a7654 |
[CLAUDE] Phase3: Workflow MVP — 9-phase state machine + code gen + FE Inbox/Detail
Backend Contracts domain (5 entities):
- Contract aggregate: Phase (9 enum), SlaDeadline, MaHopDong, BypassProcurementAndCCM, DraftData, SlaWarningSent
- ContractApproval: FromPhase → ToPhase, ApproverUserId (null = system auto-approve), Decision, Comment
- ContractComment: thread theo Phase current
- ContractAttachment: FileName + StoragePath + Purpose (DraftExport/ScannedSigned/SealedCopy)
- ContractCodeSequence: Prefix PK + LastSeq — atomic gen
EF configs:
- Unique MaHopDong filtered [MaHopDong] IS NOT NULL
- Indexes: Phase+IsDeleted, SupplierId, ProjectId, SlaDeadline, ContractId+ApprovedAt, ContractId+CreatedAt
- Cascade delete Approvals/Comments/Attachments khi Contract xoa
- Query filter IsDeleted
- Migration AddContractsWorkflow (DB 19 tables)
Workflow service:
- IContractWorkflowService.TransitionAsync:
- Adjacency check qua Transitions Dict<(from,to), roles[]> (12 transitions)
- Role guard: user phai co role ∈ allowed
- Admin bypass (role Admin pass moi check)
- System bypass (userId=null + Decision=AutoApprove → cho SLA job sau nay)
- Bypass CCM: BypassProcurementAndCCM=true cho phep DangInKy → DangTrinhKy skip phase 6
- Gen ma HD khi chuyen DangDongDau (idempotent — khong gen lai neu da co)
- Reset SlaDeadline = UtcNow + PhaseSla
- Insert ContractApproval row
Code generator (RG-001):
- 7 format theo ContractType: HDTP / HDGK / NCC / HDDV / MB + 2 framework (year prefix)
- BeginTransactionAsync(Serializable) + ContractCodeSequences UPSERT → atomic
- Idempotent: neu MaHopDong da co thi skip
CQRS (8 feature, ContractFeatures.cs):
- CreateContractCommand + Validator + Handler (set SlaDeadline = +7d)
- UpdateContractDraftCommand (chi khi Phase=DangSoanThao)
- TransitionContractCommand (delegate → WorkflowService)
- AddCommentCommand (phase = hien tai)
- ListContractsQuery (PagedResult + filter phase/supplier/project/search)
- GetMyInboxQuery (map Phase → actor roles, filter theo role user)
- GetContractQuery (detail + approvals + comments + attachments + resolve user names)
- DeleteContractCommand (soft, block > DangInKy)
Controller:
- ContractsController 8 endpoint: GET list/inbox/detail, POST create/transition/comment, PUT update, DELETE
Frontend fe-admin (2 page moi):
- types/contracts.ts: ContractPhase const + Label + Color maps + types
- components/PhaseBadge.tsx
- pages/contracts/ContractsListPage.tsx: filter phase + search + click → detail
- pages/contracts/ContractDetailPage.tsx: 2-col layout (info+comments | timeline), action dialog select target phase + comment
Frontend fe-user (4 page moi + 14 file shared):
- cp 14 file shared tu fe-admin (menuKeys, types/*, DataTable, PhaseBadge, Dialog, Textarea, Select, apiError, usePermission, PermissionGuard)
- AuthContext update: load menu tu /menus/me + cache
- Layout: menu fixed 3 muc + user info + roles display
- InboxPage: list HD cho role user xu ly (sort theo SLA)
- ContractCreatePage: form chon loai + template + NCC + du an + gia tri + bypass CDT
- ContractDetailPage: duplicate fe-admin pattern (convention)
- MyContractsPage: list HD cua toi
- App.tsx: 4 route moi
E2E verified:
- Setup Supplier + Project
- POST /contracts → 201 + phase=2
- POST /contracts/{id}/transitions x7 → di het 9 phase
- Final: MaHopDong = "FLOCK 01/HĐGK/SOL&PVL2026/01" dung format RG-001
- Approvals: 7 rows audit day du
Docs:
- .claude/skills/contract-workflow/SKILL.md: placeholder → full spec voi state machine, SLA table, role matrix, 7 code format, code pointers, API, E2E workflow, pitfalls
- docs/changelog/sessions/2026-04-21-1330-phase3-workflow.md: session log
- docs/STATUS.md: Phase 3 MVP done, next Phase 4
- docs/HANDOFF.md: update phase status + file tree + commit log + testing points
- docs/changelog/migration-todos.md: tick Phase 3 MVP items + add iteration 2 list
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
|
|||
| 702411fcc8 |
[CLAUDE] Phase1: foundation - BE Clean Arch + Identity + JWT + 2 FE React + login E2E
Backend (.NET 10): - Domain: BaseEntity/AuditableEntity, ContractType/Phase/ApprovalDecision enums, User/Role (Identity<Guid>), AppRoles (12 const) - Application: IApplicationDbContext/ICurrentUser/IDateTime/IJwtTokenService, custom exceptions, ValidationBehavior (MediatR pipeline), Auth CQRS (Login/Refresh/Me), DependencyInjection - Infrastructure: ApplicationDbContext (IdentityDbContext), AuditingInterceptor (auto audit + soft delete), DbInitializer (seed 12 role + admin), DesignTimeDbContextFactory, JwtTokenService, DateTimeService, DI - Api: CurrentUserService, GlobalExceptionMiddleware (ProblemDetails), AuthController, Program.cs rewrite (Serilog + JWT + CORS + Swagger), appsettings + launchSettings (port 5443) - Migration Init applied to SolutionErp_Dev LocalDB Frontend (React 19 + Vite 8 + Tailwind 4): - fe-admin (:8082 blue) + fe-user (:8080 emerald) - shared structure, khac menu + brand color - Tailwind 4 via @tailwindcss/vite plugin, theme brand colors - AuthContext (localStorage token), ProtectedRoute, Layout (sidebar + header) - UI kit: Button/Input/Label (CVA + Tailwind) - LoginPage voi toast error, DashboardPage/InboxPage placeholder - Axios interceptor: auto Bearer + 401 redirect - TanStack Query client, React Router 7, Sonner toast Package downgrades (do .NET 10 / TS 6 compat): - MediatR 14 -> 12.4.1 (v14 breaking changes) - Swashbuckle 10 -> 6.9.0 (v10 khong tuong thich OpenApi 2) - Removed Microsoft.AspNetCore.OpenApi (conflict voi Swashbuckle) E2E verified: POST /api/auth/login qua Vite proxy ca 2 FE -> JWT + user info Credentials seed: admin@solutionerp.local / Admin@123456 Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com> |