Commit Graph

2 Commits

Author SHA1 Message Date
72f68d1a2c [CLAUDE] Docs: S131-S132 session-end — 3-gap báo hub + E-011/AS-15 nghi-thức-chạy-tắt + dồn H1/H2 S127→S131 (GAPS→CLOSED) + seed 2 diary H24 + ghi bù timeline S127-S129
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 5m32s
- S131: 2 email hub stamped (3-gap e46863c8 + closure-cadence 641bf8ca ĐANG BÀN) + adap-report H24 §6 + tick 6→7; chết session-limit giữa §L.b → S132 /tiep nối verify-5/5
- E-011 + AS-15 error-ledger: 3 closeout S128-S130 chạy tắt (kẽ thiết-kế H22 pause/tiep ⟂ §L.b); guard episodic verified-S132; wire-tick-/tiep CHỜ ANH GẬT
- H2 dồn: 0-orphan/31 run.md · seed lead-{view,omission}-auditor MEMORY (retro S124 8379B/9967B) · rmdir stray S119 · S130 solo không nợ
- H1 dồn: rag-onboarding-guide:118/:134 contextual_retrieval true→false + gỡ "+15% recall" chưa-đo (owner-final f5ce2778); roster 14/14 khớp 4-nguồn; reviewer-gate verified-pending → spawn-probe carry
- STATUS +2 block (S131+S132 + ghi-bù S127→S129) · HANDOFF segment mới RE-STAMP 8 carry · session-log kèm marker Sàn-5 wf-run-id S127-S128
- (j) counter=7 · light 4/6 · deep 4/15 · OVERDUE none · (i) spot-check 3/3 · (h) n-a · curate reviewer 20.3→16.8KB seal-verified (S128, gộp từ wal-flush)

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-17 08:38:27 +07:00
e199603420 [CLAUDE] Docs+Memory: Session 29 FINAL wrap — Plan CA + Plan B Contract V2 cumulative
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 3m31s
20 commits S29 push 4 CI Runs PASS (#229+#230 Plan CA, #231+#232 Plan B).
2 big plans END-TO-END deployed prod.

Changes (docs + memory + scripts — CI skip per paths-ignore):

docs/:
- STATUS.md: S29 FINAL wrap header với cumulative summary 20 commits +
  multi-agent ROI ~565K + 8 patterns NEW + state stats (33 mig, 60 tables,
  51 gotcha, 14 AppRoles, 34 active users, 4× bundle rotate)
- HANDOFF.md: S29 FINAL wrap header với end-to-end V2 capability + pending S30+
  follow-up (anh restart CLI MCP RAG hot-reload, UAT verify V2, test bundle
  Plan B, curate dedicated session)
- gotchas.md: +gotcha #51 INFRASTRUCTURE vs DEMO seed phân biệt (Plan B
  Hotfix CICD lesson) với decision tree + seed classification table
- changelog/sessions/2026-05-22-s29-plan-ca-plan-b-contract-v2-wire.md:
  Session log đầy đủ 20 commits + 4× Smart Friend pattern proven + 8
  patterns NEW + file-touched list + NEW capability end-to-end test plan

.claude/agent-memory/:
- 4 MEMORY.md flush S29 wrap entry FIFO each agent perspective:
  - Investigator (25.2 KB just over threshold) — Plan CA + Plan B pre-flight
    2 spawn + 3 patterns NEW (terrain map, V1+V2 coexist, reference templates)
  - Implementer (35.4 KB over hard threshold, defer curate S30) — 5 spawn
    cookie-cutter + E3 stopped + Pattern 12-bis NEW (cross-module entity mirror)
  - Reviewer (23.0 KB compacted) — 4 spawn 2 MAJOR catches + Cat 3 security
    cross-module validation foundation reinforced
  - CICD Monitor (24.9 KB) — 4 Runs verify + CRITICAL DemoSeed gate catch +
    Stage 4.6 sqlcmd seed verify foundation + Discovery #6 gotcha #51 cross-ref
- implementer/pattern_master_page_mirror.md (NEW Plan CA Chunk B Pattern 16-bis)

scripts/:
- plan-ca-{verify-menu,verify-perms,run-perms}.{sql,ps1} (5 verify scripts)
- plan-b-{verify-prod,run-verify}.{sql,ps1} (2 verify scripts)

Smart Friend pattern proven 4× cumulative S22 #44 + S25 #48 + S29 Reviewer
#ApplicableType + S29 CICD #DemoSeed.

Pending S30+:
- Anh restart CLI hot-reload MCP RAG cho 4 sub-agents (commit b51fc94)
- Anh UAT verify V2 contract end-to-end (Drafter → CCM approve → DaPhatHanh)
- Test bundle Plan B (regression ApproveV2Async + ApplicableType validation)
- Curate dedicated session 4 MEMORY (Implementer 35.4 KB priority)

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-22 13:29:49 +07:00