Commit Graph

117 Commits

Author SHA1 Message Date
14a917f783 [CLAUDE] Contract: UAT S174 tinh-gon UI KHKK + cot 2 tang KHKK o workspace PE (FE-only x2 app, 0-mig)
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 6m51s
Anh chot qua 6 anh khoanh do + 4 cau tra loi. 7 chinh, mirror SHA256 identical 8/8 cap.

Man DANH SACH KHKK (KhkkListPage / KhkkListPanel)
- Giu DUY NHAT header trang "Ke hoach ky ket HD / Giai doan 2".
- Bo o loc "Tat ca nhom": may loc GIU NGUYEN (query + stage2Content), nhom nay den
  DUY NHAT tu URL ?group=n (8 leaf menu trai). Go luon prop onGroupChange (noUnusedLocals).
- Bo thanh "Cay toan trinh - N goi" qua prop MOI `hideHeader` opt-in tren PipelineTreePanel.
  6 host con lai (PE / GD3 / GD4 / Inbox) KHONG truyen => hinh cu nguyen ven.
  Nut "Hien/An cay" (mobile) song TRONG thanh vua an => hideHeader ep than cay `flex`,
  neu khong `<lg` mat trang cai cay.

Man CHI TIET KHKK (KhkkDetailPage / KhkkDetailContent)
- Go khoi "Quy trinh duyet" (so-do Buoc/Cap + HANH DONG + 2 lich su) — day la BAN SAO
  THU HAI, ban chinh o Panel-3 man danh sach. Anh: "bo het, no se hien thi o Menu duyet".
  KHAI HE QUA: `<lg` dieu huong thang vao trang nay => mobile hien khong con Gui duyet /
  Xoa phieu. Mo lai = boc `lg:hidden`.
- Section 5 "Y kien cap duyet" doi sang DUNG style Duyet NCC (PeDetailTabs.tsx:705-774):
  card `rounded-lg p-3` + h4 ten cap + chip trang thai + y kien text-sm + chan ngay
  border-t; thay o phang 1 dong text-[11px]. GIU o "Chua ky" (PE khong co) — vang o thi
  nguoi doc khong biet con thieu chu ky cua ai.

Man TAO KHKK (KhkkCreatePage)
- Doi sang khuon "Tao phieu Duyet NCC moi" (PeWorkspaceCreateView): 1 card + divide-y,
  thanh dau ke LUONG, thanh cuoi hint do liet ke DICH DANH truong con thieu thay vi chi
  lam xam nut. Nut "Luu nhap" -> "Tao ke hoach".
- Ve "tao xong sang chi tiet" VON DA DUNG tu S161 (onSuccess -> navigate /khkk/:id);
  dot nay KHONG dung luong do, chi doi hinh.

Man DUYET NCC — THAO TAC (PurchaseEvaluationWorkspacePage + PeKhkkSidePanel MOI)
- Them cot 3: 1 cot 2 TANG 50/50 — tren = PE da duyet CHUA lap KHKK gom theo DU AN,
  duoi = KHKK da tao. Ti le 50/50 bang `min-h-0 flex-1` ca hai tang.
- 0 ENDPOINT MOI: dung lai approved-pe-awaiting-plan + contract-signing-plans.
  "Chua co KHKK" = existingGroups RONG — tu K2/S164 BE KHONG con loc ho, loc o FE.
- GATE #85: ca 2 cua gac bang policy `KeHoachKyKet.Read` trong khi day la man PE =>
  gate bang DUNG key policy cua endpoint (KHONG OR key menu Khkk_*), thieu quyen thi
  NOI RA thay vi de cot trang (cot trang doc thanh "chua co gi").
- Cot chi moc tu `xl`; o `lg` bo cuc giu DUNG 2 panel nhu cu.

Con lai (chua lam, da khai voi anh): bam PE o tang tren moi mo /khkk/create chu chua
chon san dung phieu do — can them ?peId= vao man tao.

Verify: build 2 app PASS; mirror SHA256 8/8 cap KHOP; byte-level grep bundle xac nhan
chuoi moi co mat ca 2 app (khong tin dong "built" — bai gotcha #77).

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-08-05 15:04:08 +07:00
998ea559f3 [CLAUDE] Contract: KHKK 3-panel mirror Duyet NCC (GD2 het lech kien-truc) + 4 mitigation cuong-hanh
Dua man Ke hoach Ky ket HD ve dung lop kien-truc ma GD1 (PE) va GD3 (HD) dang
dung: 1 man 3-panel h-[calc(100vh-4rem)] grid [400px_1fr_360px], thay cho
list 2-panel + detail trang rieng co workflow xep chong. GD2 la mat-xich lech
duy nhat trong 4 giai-doan truoc dot nay.

BE (7/7):
- DetailDto +5 field: WorkflowVersion / EndedByLevelFinalize / FinalizeStepName
  / FinalizeLevelName / Approvals. 2 field Finalize* KHONG phai field append —
  ContractSigningPlan chi co co bool, phai DAN XUAT (lam in-memory tu cay
  workflow da nap, thay vi port 3 subquery cua PE).
- ContractSigningPlanApprovalDto de moi (truoc do 0 hit toan repo).
- StepDto +DepartmentName (nuoi chip phong panel 3 + header nhom Section 5).
- GET {id}/changelogs — policy KeHoachKyKet.Read.
- POST {id}/approval-attachments + enum +ApprovalAttachment=3 (append-only).
- approvals[] loc bo Decision=Pending de so (N) cung nghia voi (N) cua PE.
- KHONG chep khuon authz cua PurchaseEvaluationsController: file do la mot lo
  gotcha #82 (class [Authorize] tran + changelogs khong policy).

FE (x2 app, SHA256 byte-identical 8/8):
- components/khkk/{KhkkListPanel,KhkkDetailContent,KhkkWorkflowPanel}.tsx;
  KhkkWorkflowPanel doi tu pages/ sang components/.
- Panel 2: 5 Section danh so, Section 5 "Y kien cap duyet" duoi cung — khoi nay
  DOI TU panel 3 sang panel 2 (owner khoanh do trong anh); luoi 2 cot + meta
  "x/y cap da duyet · N NV tham gia" thay list phang 1 cot.
- Panel 3: banner ket-thuc-som, chip ten phong, badge Duyet thay CEO, lam mo
  buoc sau finalize, khoi File dinh kem khi duyet, Lich su duyet, Lich su
  thay doi. Chua chon phieu -> hop dashed y PE (QD owner).

4 mitigation cuong-hanh (owner chot panel 1 = PipelineTreePanel; chon HINH
khong phai chap-nhan VO):
- M-1 fallback !canPe -> danh-sach KHKK phang. Khong co no, user chi co quyen
  KHKK (vd nguoi duyet nhom N5) MAT TRANG danh-sach du API van cho doc —
  display-layer khoa authz-layer dang mo, mat con lai cua #82.
- M-2 onOpen thanh callback tu host; mac-dinh giu navigate cu => 0 hoi-quy
  trang PE/GD3.
- B1 stage2Content di CAP voi stage2Count qua conditional-spread:
  khong truyen => stage2 van nhan groups => trang PE GIU NGUYEN 8 ngan N1-N8.
- R-11 search/loc di server-side, KHONG loc-tren-cay; giu dong canh-bao
  "Cay tai 200 phieu moi nhat".

Chong hoi-quy da do: build 3/3 PASS · acceptance tinh 20/20 x 2 app ·
mirror SHA256 8/8 · 0 hit path cam (components|pages)/(pe|contracts) ·
KHONG ghi filter/view/group vao URL (chong tai-sinh bug S155 sidebar sang
nham leaf) · giu set-state-in-render :97-101 (dung khuon React, refactor
thanh useEffect se tai-hien va-5).

Con no, khai thang:
- E-7 bang "cot nao chet, chuyen di dau" (8 cot + 6 KpiCard -> card 400px)
  THIEU: lane FE chet o luot tra ve, ly-do bo cot mat theo. Phai soi diff
  bang mat truoc UAT, neu khong dung ca M-7 mat-chuc-nang-im-lang.
- Test 643/644. 1 FLAKY Create_DifferentEvaluationType_DoesNotAffect_Other
  (full-suite 2->1->1, chay rieng 0/0/0; PeWorkflowAdminTests tao
  new SqliteDbFixture() rieng x6 test). Baseline tren HEAD sach CHUA do
  (git worktree fail duong-dan Dropbox) => CHUA duoc noi "flake co san".
- 5 acceptance RUNTIME cho UAT: approvals co dong Tra lai + ten nguoi (DB dev
  0 hang KHKK) · UAT fe-user:8080 an-danh · deep-link fe-admin:8082 (menu
  KHKK bi an trong ADMIN_HIDDEN_KEYS) · negative-control go fallback canPe ·
  khoi file tu-an khi rong.
- P3-12 4 return-mode = HOAN, khong phai buoc-khac: tien-de "KHKK 3 tram ngan"
  do lai la SAI (DbInitializer:554 = 3 Buoc x <=2 Cap, seed tu ghi "sao tu
  workflow Duyet NCC prod").

Spec + 6 artifact phan-bien: .claude/workflows/runs/2026-08-04-S171-khkk-ui-mirror-pe/

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-08-04 19:48:38 +07:00
0bfadc2011 [CLAUDE] Contract: K8-blocker Lines-editor KHKK — gan hang muc SP-002 cho dong (command hua-trong-comment chua tung land)
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 6m27s
- Dry-run K8 bat TRUOC gio chay: auto-gen line moi CatalogEntryId=null + comment hen "UpdateContractSigningPlanLineCommand" (K4b) nhung K4b that ship ?group= => 0 impl/0 route/0 FE; submit-guard va-5 chan null => MOI phieu KHKK tao sau K2 ket Nhap vinh vien (dung cho cicd-K2 khai "chan-ly-rong")
- BE: UpdateContractSigningPlanLineCommand(PlanId,LineId,CatalogEntryId) — EnsureDraftEditable + rao ContractId!=null 409 (gate F-6) + fail-fast entry song/IsActive/dung-nhom 409 + denorm TenHangMuc + changelog EntityType.Line EntityId=line.Id + ten NCC vao Summary (gate F-1)
- API: PUT /contract-signing-plans/{id}/lines/{lineId} policy KeHoachKyKet.Update + UpdateSigningPlanLineBody
- FE x2 app KhkkDetailPage (SHA-pair 0d6147d0): select gan tai bang (Nhap/TraLai, khoa dong da bac cau HD) + option-fallback giu hang-muc-da-luu khi vang options (gate F-2, 3 ca loading/error/ngung-hieu-luc) + dong loi query + amber nhom-0-hang-muc (F-3) + aria-label per-dong (F-8)
- Test +5 Fact: duong gan->submit-QUA guard that · khac-nhom 409 · phase 409 · IsActive=false 409 · gan-DE doi ca Id lan snapshot (gate F-4)
- Gate PASS-WITH-FLAGS-8/0-blocker — disposition tung dong trong sub-reviewer-gate-lineeditor.md; F-5/F-7 ghi no cung goi RowVersion/unique voi no K7 race-2-request
- scripts/backup-sql.ps1 default D:\ -> C:\ (VPS khong co o D — do that B0)

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-08-01 17:08:47 +07:00
081557b441 [CLAUDE] Contract: GD3-D cay toan trinh vao Panel-3 (slot 63 owner chot D + "mo rong" = ca 3 trang) + prop bodyMaxHClass (gate F-1)
- Owner @S168: (63)(b)=D cay-thay-Panel-3 · (a) "cu mo rong" -> ca 3 trang 3-panel {fe-user MyContractsPage + InboxPage · fe-admin ContractsListPage}; WorkflowMatrixViewPage KHONG ap (trang bang full-width 0-Panel-3 — khai chu dich, gate F-8 phan lead DUNG)
- Panel-3 khi CHUA chon HD: PipelineTreePanel currentStage=3 the cho o trong "Quy trinh duyet se hien khi chon HD"; chon HD -> nhuong cho WorkflowHistoryPanel (trade-off D khai)
- Gate PASS-WITH-FLAGS-10 (1 MAJOR/6 MINOR/3 INFO, 0 blocker) — disposition tung dong trong sub-reviewer-gate-gd3d.md
- F-1 MAJOR va: khuon +prop bodyMaxHClass (default GIU NGUYEN — 3 host giay-cuon cu 0 doi), 3 host Panel-3 pass lg:max-h-none => panel giu dung 1 thanh cuon (max-h khuon vuot cho /inbox ~26px -> 2 cuon long) — mirror x2 app SHA-pair 7baf6247
- Go X unused import 3 trang (control-am grep co rang)
- build x2 PASS · suite 642/0 (45D+597I)

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-08-01 16:49:46 +07:00
628132cf10 [CLAUDE] Scripts: S167 governance — split _INDEX auto-rotate + 3 script _INDEX*-glob + tran _mind 48KB + ratified-stamps
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 6m24s
Slot(57) anh "auto": cicd-monitor _INDEX 21.468->8.756B (42,7% cap) + _INDEX-2026-H1.md tang-lanh;
3 script cung-class nhan _INDEX*.md (gate chong-haystack-duong-gia + doc MOI index-file; measure truc
l2_index; shard-probe loai-tru); fault-inject 2-chieu PASS + A7 427/427 lan dau sach (va needle-quote
test-specialist + mega-line + 29-entry lac-section). Slot(58) anh "nang tran": mind_ctx_kb 32->48
(live-verified 62,2%). G-1 RATIFIED stamps KhkkWorkflowPanel x2 app (SHA-pair giu) + STATUS 622/counter-41.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-08-01 13:06:39 +07:00
aaed699228 [CLAUDE] Contract: K7 SP-002 bridge KHKK->HD hoi-2-khoa + Line.ContractId + grant seeder (gate PASS-WITH-FLAGS 10, F-8 fixed)
Some checks failed
Deploy SOLUTION_ERP / build-deploy (push) Has been cancelled
BE: POST {id}/create-contract (Contracts.Create AND KeHoachKyKet.Read) + guard 4-ve IsActive/IsUserSelectable
+ Line.ContractId write-site DAU TIEN + list-DTO ContractIds + SeedContractCreateAccessAsync (Drafter/
Procurement/Admin upgrade-only, cau III default cho ratify). FE x2 app SHA-pair 3/3: nut bridge gate 2-khoa
+ dialog khuon-san + cay GD3/GD4 doc TAP contractIds (union pe.contractId legacy). Test +17 (12 bridge T1-T12
+ 5 authz) suite 639/0; ngoai-le CreateContract trong AuthorizePolicyRegressionTests (#85).
Gate F-8 fixed truoc commit: neo so-dong :2516 chet-luc-land -> neo ten ham (3 cho) + 13/13->12/13 theo do
prod + khai chu-dich CanRead + sua tro-nham-ham. No mang theo (0-blocker): MAJOR-race-2-request-dong-thoi
(chong-trung in-memory, phuong an unique/RowVersion = nhip sau) + DraftData-khong-carry + a11y/O(n.m) FE.
UAT-NOI-TRUOC: nut sang sau restart + user RE-LOGIN (menu cache); acceptance seeder log = 0 added + 2 upgraded.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-08-01 13:04:49 +07:00
e202393256 [CLAUDE] FE-User: K4c SP-002 WfView loc theo nhom + test MAJOR-A /deleted lọc server (chot cum-2)
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 6m17s
Gate PASS 0-blocker (sub-reviewer-gate-k4c.md): WorkflowMatrixViewPage doc ?group= (guard
/^[1-8]$/ chan ca "03") -> loc wf.code === KHKK-N{n} client-side co-chu-dich (payload da
tai tron theo type — khong ro cache, BE khong nhan truc group) + badge nhom + link xem-tat-ca
+ rong-vi-loc tach cau; type≠10 = 0 doi hanh vi (PE matrix regression chung-la-khong).
fe-admin 0-diff (lech co-y 2026-07-27). +1 Fact ListDeleted_FiltersByApprovalGroup (5 ve +
nhanh-Admin-cung-loc, assert Total, RED->GREEN 2 chieu do that — gate-K4b MAJOR-A dong).

Suite 622/0 (45D+577I) do tuoi ca gate lan lead. Ghi mo: 1 test cu
DeleteContractSigningPlan_SoftDeletes flaky 1/12 luot quan sat (gate truy 3 ve khong ra
duong diff — moc cho CI neu tai). No con: gate-K4c 3-MINOR (helper-dispose · link-mat-query
· highlight) + K5-MINOR-3 chu SAP + MAJOR-C da dong o wave nay.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-08-01 11:08:09 +07:00
88e7ecf263 [CLAUDE] Contract: K4a+K4b SP-002 sidebar 8 nhom x 6 leaf + noi ?group= end-to-end (0-mig)
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 6m23s
K4a (gate PASS-WITH-FLAGS 4, sub-reviewer-gate-k4a.md): 49 key Khkk_G{2-8} bo-sinh
by-construction 3-phia (All/seed/grant) MenuKeys.cs + DbInitializer 49 row + labelBackfill
G1 nhan A1 + site-2 Concat + va 7/10/11/13/15 (nhan N2 co "pha do"; comment 1893 -> mo-neo
grep). All 64->113, Policies 256->452 (test T2 khoa runtime). Test +7 KhkkGroupMenuSeedTests
(T7 revoker-khong-dung-Khkk: probe vi-phan 112->0, gotcha #84).

K4b (gate PASS-WITH-FLAGS 4M/5m 0-chan, sub-reviewer-gate-k4b.md): KhkkListPage x2 derive
phase+group tu searchParams (leaf->leaf khong F5, navKey reset) + queryKey {group,phase,
search,page,deletedView} + KhkkCreatePage preset ?group= + staticMap G1 6-leaf group=1 +
regex Khkk_G([1-8])_* fe-user (fe-admin GHI RANG BUOC isAdminHidden) + FLAG-1 lead-fix:
GET /deleted +group mirror List (Controller+Query+handler SAU-IDOR) + FE noi 2-nhanh.

2 wave 1 commit CO KHAI: Layout.tsx dinh ca 2 wave khong tach hunk phi-tuong-tac; moi dong
deu qua gate rieng. STATUS canonical 5-row dong bo (71/97/452/113/620->621) + bundle :479.
No K4c: MAJOR-A test /deleted+group filter + MAJOR-C WfView doc group. Suite 621/0
(45D+576I) + filter 41/41 + npm x2 + dotnet 0E.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-08-01 10:10:11 +07:00
7a903cf108 [CLAUDE] Contract: F-1 o-tich opt-in level-finalize man duyet KHKK (DTO expose co + UI x2 app, khuon PE-live S97)
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 6m21s
Gate-K3 F-1 MAJOR: BE ApplyLevelFinalize ?? true ma 0 UI gui false => tram CEO
chi di duoc bang admin bo co Designer. Va: expose AllowApproverFinalize vao
ContractSigningPlanWorkflowLevelDto (1 site :640) + panel KHKK x2 app suy
actingLevel mirror ResolveActingLevel (own-truoc, Admin fallback First) + o-tich
OPT-IN khuon PE-live S97 (G-1 reviewer: default false — fail-mode an toan len CEO;
ratify treo so CHO-ANH) + body 3-field chi khi approve.

Reviewer PASS-WITH-FLAGS 7 (sub-reviewer-f1-checkbox.md): G-1 flip ap, G-5 bo
"(CEO)" ap, G-6 tach commit ap (K4a rieng), G-2/G-3/G-4 no nhip-K4, G-7 vao
commit K4a. Suite 614/0 + filter KHKK 34/34 + npm x2 + SHA-pair b37cd292.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-08-01 09:05:51 +07:00
15349e8ee0 [CLAUDE] Contract: K3 SP-002 8 workflow nhom KHKK-N1-8 + port level-finalize + designer (0-mig) + 5 test
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 6m10s
Seed 8 workflow type-10 theo ROSTER LIVE prod (QT-DN-V2-001, lead verify tay
@SQLEXPRESS: 3 tram PRO->CCM->CEO, 11 nguoi, resolve EMAIL, idempotent per-Code;
co Finalize CHI cap chuong.phan). Port nhanh level-finalize mirror PE :866-876
(EndedByLevelFinalize K2-de-K3-tieu + ApplyApprovedValuesOnFinalize truoc Phase;
opt-out applyLevelFinalize 3-tang interface/service/controller, default true).
Sweep ep-false va-3: GO CREATE ep-false Finalize type-10 (OG-9 supersede PHA-VO
S155); GIU PUT-Conflict (luat versioning CHUNG - spec liet nham, khai lech);
GIU ep-false SkipToFinal type-10 (K3-test O-1 chong config-lie mới) + FE disable
o SkipToFinal cho KHKK (gate-K3 F-2). Rao (v) pin-dung-nhom regex KHKK-N[1-8].
+8 MenuKeys AwV2_KhkkN* (All 56->64, policies 224->256 may-dem) + 8 menu-row +
resolvePath fe-admin phep-am Khkk_ 0-hit. 5 test K3 (T-a..T-e, anti-tautology).
Gate K3 PASS-WITH-FLAGS 8f/0-blocker (sub-reviewer-gate-k3.md): F-1 checkbox
opt-out man duyet = KHAI HANDOFF dau-viec-#1 lan sau (tram CEO tam thoi qua
Designer bo co); F-2 va; F-3 dong truoc do. Suite 614/0 (45D+569I). K3-BE 2 luot
engine-exit -> che nho + lead-solo (bai: task-hep-Write-som song).

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-31 18:21:39 +07:00
0779f2d45a [CLAUDE] Contract: K2 SP-002 phieu KHKK mang hang-muc + nhom duyet N1-8 (Mig 71) + FE x2 app + 11 test
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 6m12s
Mig 71 AddKhkkApprovalGroupCatalogAndFinalizeRuntime: +ApprovalGroup (backfill=1)
+EndedByLevelFinalize (K2 de, K3 tieu - ghost-window khai) + Line +CatalogEntryId/
TenHangMuc + unique (Plan,Supplier,CatalogEntry) filtered IsDeleted=0. Rao
1-PE-1-phieu doi (PeId,ApprovalGroup) 2 site + picker OG-7 ExistingGroups + nut
'Tao them cho nhom khac'. Submit-guard va-5 (CHAN null, thang nen cho-qua-legacy;
ghost-window K2->K4b khai) + dem-so-khop (gate F-1: bit duong hang-muc xoa-mem).
List ?group= end-to-end + Tong-Approved list (va-8). FE: select nhom default 1 +
badge N{g} + cot Hang-muc + cot Tong-duyet, SHA-pair 5/5. Gate K2 PASS-WITH-FLAGS
10f: F-1 guard fix + 2 test bit (xoa-mem chan + reflection ?group=); F-2/F-5/F-7/
F-8/F-9 comment-honest; F-3/F-4 docs-delta. Suite 609/0 (45D+564I). Wave co #53 x5,
artifact + relaunch-cat-got cuu 100% (0 mat cong).

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-31 17:05:27 +07:00
50e6d8c382 [CLAUDE] Contract: K1 SP-002 danh muc loai HD - ContractCatalogEntries (Mig 70) + seed 86 + CQRS + FE kind-5 x2 app + 8 test
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 6m31s
Gate: reviewer PASS-WITH-FLAGS 9f (sub-reviewer-gate-k1.md). Xu ly: F4
IncludeInactive mac-dinh-loai (spec K1.c) + test T5b; F7 comment 5-kind;
F1 OG-6 doi nhan soat-SAU @PAUSE-2 (seeder skip-if-exists giu sua-tay CRUD
qua restart - update-branch co y KHONG co); F3 authz mirror khuon Catalogs,
gioi-han khai: 4 policy ContractCatalog.* sinh ra nhung chua endpoint nao
tieu thu (display-layer khac API-layer, #82); F6 ten index IX_ giu EF-default
(NIT). Suite 598/0 (45D+553I). Mig 70 ap SQL Server that OK. Drift DELTA:
MenuKeys.All 55->56, policies 220->224, bang 96->97.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-31 15:45:50 +07:00
bfc7b79f72 [CLAUDE] FE-User+FE-Admin: cay 4 folder GD duoi tung goi thau (Duyet NCC / Ke hoach HD / Duyet HD / HD cung) x2 app + 5 fix review F-1/3/4/6/7
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 5m50s
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-30 10:04:32 +07:00
3119cb9104 [CLAUDE] Contract: W7 KHKK GD4 "Hop dong cung" 1-moc — HardCopiesPage x2 + ?type filter + hasSealedCopy badge + 3 test PIN (suite 590/0)
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 5m50s
- BE: ListContractsQuery +ContractType? type (filter server-side F-C1/F-05) + DTO HasSealedCopy derive Attachments.Any(purpose=SealedCopy=3) — append-cuoi default false, 0 policy moi, 0 migration, attachment endpoints 0-diff (O-A giu)
- FE x2 SHA-PAIR: trang /hard-copies (list phase=9 hardcode + badge + panel upload multipart purpose=3 + Y kien cap duyet readonly) + 7 leaf Hdc_* re-point ?type=1..7 (coming-soon 0/0, menu 142 giu)
- Tests: ContractHardCopyTests 3 PIN (phase-only + type-filter Total-server-side + badge derive purpose=3 no-IsDeleted) — probe vi-phan 5/5 phan biet ban hong; suite 587->590/0
- Review: PASS-co-dieu-kien (FLAG-1 untracked da gate; FLAG-2/3 comment da va, SHA-pair C7DCC20B giu; +31/-4 errata BE self-report)

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-30 00:17:52 +07:00
df52fa0cd0 [CLAUDE] App+Infra+Api+FE-User+FE-Admin+Tests: W3 KHKK — duyet 3 tram OR-of-N + finalize chot gia (test-before 6 RED->GREEN)
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 5m54s
- ContractSigningPlanWorkflowService: copy khuon ApproveV2Async (con-tro doi StepIndex+LevelOrder, GroupBy Order, OR-of-N, LevelOpinions UPSERT "(duyet — khong y kien)") — CAM Proposal-flatten; KHONG port 2 duong ket-thuc-som (owner phan PHA VO S155)
- Choke-point finalize ApplyApprovedValuesOnFinalize (Line.ApprovedAmount ??= Proposed) 1-SITE-BY-DESIGN: hop-dong transitions khong co targetPhase => admin cung xuyen choke-point (triet lop #81 tu goc); RULE-comment khuon :356-360
- Transitions endpoint: submit/approve/return/reject (hop-dong LEAD-dinh-nghia literal — reviewer Truc-4 KHOP 5/5, truc W2 tung dut 6 diem); guard trinh CreatedBy|Drafter|DeptManager-cung-phong|Admin; changelog/approvals bang KHKK rieng (CAM IChangelogService — FK-547 rao bang vang-mat-dep); notify Cap-ke dich danh + exclusion actor/drafter (S86)
- Save-diem: 1 SaveChanges cuoi = 1 transition 1 unit-of-work (service la diem vao, khac nguon :537)
- FE KhkkWorkflowPanel x2 app SHA-pair: so-do Buoc/Cap + banner den-luot + Gui/Duyet/Tra/Tu-choi + y kien; panel GATE nut theo actor (khong de an 403)
- Test-before: 6 test san PIN RED-evidence 6/6 (5 NotImplemented + 1 assert) -> GREEN 6/6; sua-test dung 1 seed FAULT-INJECT sot (0 assert doi); suite 574 -> 580/0
- Reviewer 7/7 truc DAT 0 chan (4 truc vai + 3 truc lead on-behalf; Q1-Q6 duyet)

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-29 22:33:11 +07:00
6cbc6ad937 [CLAUDE] App+Api+FE-User+FE-Admin+Tests: W2 KHKK — CRUD phieu nhap + can cu b.8-9 + FE 3 page x2 app + 12 fix reviewer
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 5m56s
- BE mega-file ContractSigningPlanFeatures (Create 4-rao + auto-Lines snapshot per-winner + MaKeHoach @CREATE + UpdateDraft null-safe + Get/List/inbox-precompute-V2/deleted + Dossier + Attachments + Delete allow-list M6 + picker) + Controller 15 action policy per-action 15/15 (KeHoachKyKet.*)
- FE pages/khkk 3 page + types x2 app SHA-pair + 4-place (6 leaf Khkk_* het coming-soon; WfView: user=matrix?type=10 [whitelist +10] / admin=Designer deep-link); root KeHoachKyKet -> /khkk/list
- Reviewer adversarial: 12 finding (3 CRITICAL dut-2-bo FE-BE: route picker + peId body + dossier planId; 2 MAJOR security: detail+download 0 rao -> EnsureCanViewAsync mirror PE S89 nhap-rieng-tu; PUT-vs-POST de-ban-sao; peTenGoiThau; winnerSupplierNames; Content-Disposition RFC6266; LEFT-join Projects) -> 11 FIXED + 1 GIU (F-10 ke thua khuon PE, bit dong bo sau)
- tests: +8 (574 total 0 fail) — authz reflection dong + Create/Delete/guard/khong-dot-ma-khi-409 + fixture-co-interceptor

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-29 21:19:41 +07:00
ea962b1e59 [CLAUDE] Contract+FE-User: dot-5 menu 6-leaf y-chang-Duyet-NCC + GET /contracts/deleted + bo hero + "Tong quan quy trinh"
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 5m38s
- BE: ListDeletedContractsQuery (IgnoreQueryFilters + Where(IsDeleted) + IDOR mirror; LUAT thay so-dem theo reviewer FLAG-10) + GET /contracts/deleted [Contracts.Read]
- Seeder: Ct x7 +3 leaf (WfView/Approved/Deleted) + labelBackfill "Dang duyet" x7 + Khkk 6 leaf + Dashboard -> "Tong quan quy trinh" + reviewKeys +23 key
- FE user: matrix +type=3 (HD chung 1 bo V2) + route /contracts/workflow-matrix + Ct regex +3 action + MyContractsPage (phase/deleted + banner + an nut Tao + FLAG-2 guard selectContract khi deleted) + MenuLeaf depth-0 UPPERCASE + UserDashboardPage BO HERO (owner: "bo cai tren di, cai duoi OK") + title "Tong quan quy trinh"
- fe-admin: staticMap +2 Khkk (FLAG-1); leaf Ct_ moi van an theo isAdminHidden (da kiem CLEAN)
- reviewer PASS_WITH_FLAGS 10 FLAG (0H/4M/6L): fix 4M, park 6L co ghi (FLAG-4 dinh nghia "Da duyet" HD -> cho owner)
- build fe x2 + BE PASS; test 562 PASS

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-29 14:40:10 +07:00
a2bbcb91c3 [CLAUDE] FE-User: dot-4 danh sach toan trinh - 7 FLAG reviewer fix + nhan 'Bang cung' (owner ve)
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 5m39s
- FLAG-1[M]: row HD mobile het ngo cut - mirror nhanh matchMedia cua MyContractsPage (desktop ?id= / mobile /contracts/:id)
- FLAG-2[M]: JourneyDots nhan per-dot states; DOT_TEXT.none trung tinh; +state 'linked' (PeListItem.contractId THAT); contractDots: DangDongDau/DaPhatHanh cham dung GD4 (suy dien tuyen tinh CUNG module - hop le); aria chi ke cham CO thong tin
- FLAG-3[L]: Pager dung page-state thay data.page (het race bam nhanh)
- FLAG-4[L]: vung role=status giu ton tai khi 0 ket qua (screen-reader duoc bao)
- FLAG-5[L]: 4-cham vao sub-line mobile (tang lien ket 2 khong bien mat tren dien thoai)
- FLAG-6[L]: (ghi nhan - count tab vs search: de nguyen co chu thich o code, xu ky hon khi co UAT)
- FLAG-7[L]: nut X goi clearSearch() - xoa NGAY khong cho debounce
- Seeder: Hdc_ leaf + ' - Bang cung' (tree.Add + labelBackfill 7 entry; prod SQL suffix=7 cung ngay)

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-29 13:51:07 +07:00
2a7269581c [CLAUDE] Infra: go nhanh S92 khoi revoker (owner supersede: hien thi het) + skeleton menu GD2/GD4 + ComingSoonPage x2
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 5m56s
- RevokeTemporarilyHiddenModulesAsync: GO Contracts+Ct_*/Master-set khoi predicate (bai tra gia: grant SQL tay bi revoker lat o restart #423 - 447/494 row roi; regrant=447 da chay truoc commit nay). Hrm/Off/Personal GIU (y owner: vung dang-lam chi admin)
- reviewKeys += ContractMenuKeys + MasterMenuKeys + KhkkKeys + HdcKeys (CanRead-only all-role, fresh-env hoi tu)
- Seeder tree.Add: Khkk_G1 + 4 leaves (khuon Duyet NCC) + Hdc_x7 (tai dung nhan 01.-07.) - prod da INSERT truc tiep (perm=156)
- ComingSoonPage mirror x2 (md5-identical) + route /coming-soon x2 + staticMap 11 leaf x2 (gotcha #50)
- Test: AdminOnlyModulesRevokeTests tach StillHidden/Reopened + REGRESSION-GUARD S159 (re-add nhanh S92 => do); ProcurementMasterAccessSeedTests doc lai isolation bang CO CAO (spec-change S92->S159, update test + code chung commit)
- 562 test PASS - nghiem thu cuoi = restart THAT khi deploy run nay (khuon S91)

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-29 12:34:15 +07:00
1a47a61c21 [CLAUDE] FE-User: tab strip 4 giai doan tren phieu PE + menu 4-GD + danh so 01-07 nhom HD (UAT anh Kiet)
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 5m44s
- PePipelineStrip moi (mirror x2 app md5-identical): Duyet NCC | Ke hoach ky ket HD | Duyet hop dong | Hop dong cung — chen dau PeDetailTabs (GD1 active)
- Menu 4-GD: rename 2 root (PurchaseEvaluations->Duyet NCC, Contracts->Duyet hop dong) + 2 root placeholder KeHoachKyKet/HopDongCung (ngoai MenuKeys.All, staticMap -> /dashboard) — prod da SQL truc tiep cung ngay, seeder+labelBackfill giu hoi tu (gotcha #11)
- Danh so 01.-07. nhom HD: prod prepend-only 0-VN-over-wire (renamed=7), seeder typeLabels + labelBackfill 7 entry
- Dong bo nhan 4-GD tren dashboard (3 title + 3 group aria)
- reviewKeys += 2 placeholder CanRead-only; test 562 PASS; build fe x2 PASS

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-29 12:06:19 +07:00
b5799fc5d3 [CLAUDE] FE-User: Tong quan tat ca luong duyet - pipeline 4 giai doan (GD1 PE + GD3 HD live, GD2 De xuat ky ket HD + GD4 sap trien khai)
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 5m58s
- Redesign UserDashboardPage: hero pipeline 4 GD (owner chot ranh b.7-12/13-18/19-21) + KPI ca nhan giu nguyen
- GD1/GD3 doc so lieu that (/purchase-evaluations, /inbox, /reports/my-dashboard); +1 request moi (pageSize=1)
- queryKey ['pe-inbox'] DUNG CHUNG InboxPage + select length (tranh vo cache 2 shape cung key)
- aria-label per-row (group prop bat buoc, WCAG 2.4.6); 100% tieng Viet
- reviewer PASS_WITH_FLAGS 7 FLAG (0H/2M/5L): fix 4, park 2, no-change 1 (disposition trong run-trace)

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-29 11:43:25 +07:00
4464a464c5 [CLAUDE] PurchaseEvaluation: nut XOA phieu o man duyet + menu 3 muc + man "Da xoa" (dot 2)
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 5m47s
Dong ca UAT goc (Tra Sol): "lo bam sai cai goi thau, quay lai khong duoc, phai
xoa thi no moi ko co luy ke len". Dot 1 (b1bae77) da dung NEN (co F6 + lenh sua
quy trinh tai cho); dot 2 la phan nguoi dung cham vao.

- App: PeSoftDeleteFeatures.cs MOI
  - DELETE /api/purchase-evaluations/{id}/by-approver — 3 rao: phase ChoDuyet
    ^ dung luot actor ^ matchingLevel.AllowApproverDelete (PER-NGUOI, khong g.Any)
  - GET /api/purchase-evaluations/deleted — IgnoreQueryFilters() KEM .Where(IsDeleted)
    (IgnoreQueryFilters GO filter chu khong DAO — thieu Where la liet ke ca phieu song)
    + tai lap khoi IDOR cua list hien hanh
  - ghi vet ChangelogAction.Delete + ly do
- Api: 2 endpoint moi. 🔴 by-approver CO Y KHONG co [Authorize(Policy)] — do tren DB:
  moi vai dang lam nguoi duyet (Procurement/CostControl...) deu CanDelete=0 va khong
  seeder nao nang co do => gan policy la 403 voi dung nguoi can dung, ma FE gate cung
  quyen nen khong thay nut khong thay loi (gotcha #44). Quyen = 3 rao handler; co F6
  la admin tick dich danh tung nguoi => chat hon quyen theo vai.
- Dto: ApprovalWorkflowOptionsDto + AllowApproverDelete. Thieu field nay thi FE gate
  luon sai => nut KHONG BAO GIO hien, ma BE lan FE deu build sach (reviewer bat).
- Domain/Infra: 2 menu key Pe_{code}_Approved / _Deleted (KHONG vao MenuKeys.All =>
  giu 54/216) + seed tree + labelBackfill "Duyet" -> "Dang duyet" + 2 danh sach permission
- FE x2 app: nut Xoa trong PeWorkflowPanel (md5 mirror khop) + dialog ly do + Layout
  regex/route cho 2 muc moi + man "Da xoa" chi-xem
- Tests: +11 (562 tong, 0 fail). T27 khoa CA LOP loi entity-co-co-ma-DTO-khong-co
  (fault-inject xac nhan: go field ra => T27 do ngay)

Review: 12 FLAG, chot chan H1 (DTO thieu field) da va. Deploy KHONG co migration
nhung CO seed menu => phai restart API.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-27 14:06:14 +07:00
b1bae77c9c [CLAUDE] Workflow: sua quy trinh duyet TAI CHO + co F6 AllowApproverDelete (dot 1)
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 5m31s
Nen cho tinh nang "xoa phieu PE o man duyet" (UAT: phieu bam sai goi thau dang
an luy ke). Dot 1 lam NEN, dot 2 moi lam nut xoa.

Vi sao phai lam nen truoc: phieu dang chay pin ApprovalWorkflowId va doc workflow
SONG theo Id do. Moi POST tao workflow moi = Id MOI, nen tick co tren ban moi
KHONG BAO GIO toi duoc phieu dang treo. Phai co lenh sua-tai-cho giu nguyen Id.

- Domain: ApprovalWorkflowLevel + AllowApproverDelete (F6, per-NGUOI) + Mig
  20260727033522_AddPeAllowApproverDelete (AddColumn bit default false, no new table)
- Application: UpdateAwDefinitionCommand + Validator + Handler
  - 2 phep thu: (T1) khung khong doi - Order tung row bat bien
                (T2) luat choi khong doi - cam CeoApprovalThreshold, AllowApproverFinalize,
                     Code, ApplicableType => 409 bao tao ban moi
  - diff theo Level.Id (CAM delete-then-insert: no FK Restrict + mo coi LevelOpinion)
  - guard 2 tang chu ky: tang 1 chu ky tren ho so CON SONG; tang 2 chu ky CON LUU
    (cha xoa mem hoac opinion xoa mem) - ca hai deu CHAN, khong xoa cung
  - purge chi khi ho so cha KHONG CON ROW; boc transaction (ExecuteDelete tu commit)
  - KHONG tang Version, KHONG dung IsActive, KHONG doi Id
- Api: PUT /api/approval-workflows-v2/{id} + [Authorize(Policy="Workflows.Create")]
- Infra: message 403 in TEN NGUOI thay GUID tran
- FE: Designer tach "Sua tai cho" (PUT) vs "Tao phien ban moi" (POST) + o tick F6
- Tests: +21 (551 tong, 0 fail) - gom F12 chung minh phieu dang chay nhan thay doi ngay

Review: 14 FLAG, 3 HIGH da va (ExecuteDelete ngoai transaction / purge xoa cung
chu ky phieu xoa mem / endpoint khong co day FE goi toi).

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-27 12:36:59 +07:00
5fa11b588a [CLAUDE] Supplier: import v2 — Mig 64 publish/draft + dedup-MST + template + file mẫu
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 5m14s
- Mig 64 AddSupplierPublishState: +IsPublic (draft/public); backfill 22 prod->public; filtered-unique doi [Code]<>'' (cho phep nhieu nhap Code=''); no new table (89).
- Import v2: dedup MST-primary + Code-backstop (chong 500 unique-violation); re-bake 30 token header THAT byte-exact (LayoutValid khop file that); nhap Ma NCC per-row (=Code); thieu Ma NCC->nhap (IsPublic=false); MST thieu->canh bao mem (MstMissing).
- PublishSupplierCommand rieng (ne #73 clobber); GET /suppliers/import/template (BE-gen xlsx 30-col).
- FE 2-app SHA-mirror: badge Public/Nhap; nut Cong bo; filter; nut Tai file mau; cot Ma editable; canh bao MST. Picker PE + tao HD loc published=true (an nhap -> ma HD khong dinh Code rong). CreateSupplier set IsPublic=true.
- authz D3: import/preview/confirm/template/publish = Policy Suppliers.Update (khop FE PermissionGuard, het 403).
- Tests +19 (477 PASS): dedup T1-T7, publish-guard, list-filter, all-or-nothing, LayoutValid. Fix null-Code NRE (path R4 loi).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-12 19:03:37 +07:00
e100ef065b [CLAUDE] Supplier: Excel-import Phase B (upload NCC preview/confirm) + Mig 63
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 5m25s
Import Excel 'Database NCC': upload→preview classify (New/Update/Skip/Error)→confirm all-or-nothing upsert-by-Code (OrdinalIgnoreCase dedup, fill-nulls-safe). Mig 63 +SourceUpdatedAt/By (2 nullable). Parser layout-locked header-fingerprint NFC-normalized + absolute-cell-index + #REF!-null + NAS-backslash-raw. Type-lạ→NhaCungCap. FE dialog fe-admin+fe-user byte-identical. 10 test SupplierExcelImportServiceTests.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-12 16:13:46 +07:00
778fc98b2f [CLAUDE] Supplier: Mig 62 expand 30-field + seed 4 NCC + FE form 2-app
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 5m7s
Phase A of the NCC/TP Excel-import backlog (anh Kiet FDC). Supplier
entity 9 -> 27 fields to hold the 30-column supplier database.

Backend:
- Supplier +18 nullable cols; SupplierType +CaHai=6 (append-only);
  new nullable SupplierStatus enum.
- Mig 62 ExpandSupplierFields (3-file): AddColumn x18 + guarded un-cram
  Sql (clear legacy crammed Note on the 4 seeded rows, exact-match).
  No new table (89), reversible Down.
- Seed fill-nulls-if-exists: populate 30 fields for TRUONGGIANG/TANPHU/
  TGN/DONGDUONG from Excel; idempotent, never clobbers existing cols.
- DTO + Create/Update commands + validators (MaximumLength-only, no
  NotEmpty so open-auth Create minimal payload stays valid) + 2 query
  projections.

Frontend (fe-admin + fe-user, byte-identical SHA-mirror):
- types/master.ts +18 fields +SupplierStatus; SuppliersPage form 4
  section groups + Status select + 3 NAS links via new shared PathLink
  (extracted from PE HoSoLink render+Copy). All new fields optional.

Excel upload auto-map = Phase B (deferred). Tests test-after (UAT mode).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 16:06:11 +07:00
9e12e80b48 [CLAUDE] FE-Admin·FE-User: badge " Đã được CEO duyệt" cho phiếu đi hết lên CEO (anh Kiệt FDC UAT)
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 5m13s
- PeFinalizeChip (single-source-of-truth pill): +nhánh phase===DaDuyet && !endsBeforeCeo → " Đã được CEO duyệt" (đối xứng chip "⚑ Kết thúc · X" cho endsBeforeCeo=true)
- Wire phase ở 6 call-site (PeListPanel + PurchaseEvaluationsListPage ×2 app + Inbox + Dashboard user)
- FE-only, tận dụng endsBeforeCeo runtime (Mig 60 fix-3), no BE/mig; mirror 2-app SHA da9c3ed9, build ×2 PASS 0-TS-err

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-01 20:52:17 +07:00
8ee8f3e248 [CLAUDE] PurchaseEvaluation: cây Duyệt NCC node Dự án hiện mã dự án thay tên dài (anh Kiệt FDC)
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 5m23s
Anh Kiệt FDC (Zalo + screenshot): node 📁 Dự án trong cây "Năm > Dự án >
Hạng mục > Phiếu" hiện TÊN dài ("Phân xưởng homecare 75 tấn/ngày và các
hạng mục") → user thấy vướng → "bắt mã dự án nhé".

BE: thread ProjectCode vào PurchaseEvaluationListItemDto + 3 projection
(list + inbox + approved-from-evaluation) + search khớp thêm mã dự án.
FE 2 app (SHA-mirror): PeListItem +projectCode; tree node 📁 render Code
(fallback Name nếu rỗng) + tooltip=tên đầy đủ + sort theo mã.

Verify: dotnet build 0/0 - npm build x2 PASS - test 434 (45D+389I).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-29 16:00:03 +07:00
fef4c33527 [CLAUDE] FE-User: workflow-matrix view — thêm flag thứ 8 "Duyệt là KẾT THÚC quy trình" (thiếu từ Mig 58)
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 5m1s
WorkflowMatrixViewPage (màn "Luồng duyệt" read-only của user, build S24 với 7 flag) thiếu flag
thứ 8 allowApproverFinalize ("Duyệt là KẾT THÚC quy trình, không trình tiếp CEO") thêm ở Mig 58
(S87) → matrix "chưa hiển thị chính xác" QT-DN-V2-001 (anh Kiệt FDC). BE overview DTO đã gửi sẵn
field này (ApprovalWorkflowV2AdminFeatures.cs:41/188), chỉ FE matrix + AwLevelDto type thiếu.

Thêm allowApproverFinalize vào AwLevelDto + FlagRow thứ 8 (colSpan2, mirror admin Designer).
FE-user only (matrix là view user-app, không có bản fe-admin). Build xanh.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-25 15:45:28 +07:00
f0bca7737c [CLAUDE] PurchaseEvaluation · FE-User · FE-Admin · Tests: PE note "Duyệt là KẾT THÚC quy trình (không trình CEO)" — 3 surface
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 4m58s
Phiếu mà quy trình duyệt có cấp bật AllowApproverFinalize (Mig 58) sẽ kết thúc tại cấp đó,
KHÔNG trình CEO. Hiển thị note cho MỌI NGƯỜI NẮM ở 3 surface (anh Kiệt FDC). KHÔNG migration
(cột AllowApproverFinalize đã có Mig 58, prod ở Mig 59).

BE (3 file, computed DTO):
- PurchaseEvaluationDtos.cs: +bool EndsBeforeCeo +string? FinalizeStepName +string? FinalizeLevelName
  trên DetailBundle + ListItem; flow-level +bool AllowApproverFinalize.
- PurchaseEvaluationFeatures.cs: detail compute first-reachable (Step.Order↑→Level.Order↑, dept-name
  in-memory); list + inbox projection qua 3 subquery EF-safe (lv.Step!.Name). V1 (workflowId==null) → false.
- CreateContractFromEvaluationFeatures.cs: ListApproved projection cùng DTO → +3 subquery y hệt.

FE 2-app (fe-user + fe-admin SHA-mirror component):
- PeFinalizeChip.tsx (MỚI, chip tím) ở 3 danh sách: PeListPanel + PurchaseEvaluationsListPage (cây) + InboxPage.
- PeWorkflowPanel.tsx: note callout trong phiếu, branch DaDuyet (past-tense) / đang-chạy; copy boundary-aware
  "...là KẾT THÚC, không trình CEO. Các cấp trước vẫn duyệt như thường." (tránh cấp giữa hiểu nhầm).
- UserDashboardPage.tsx (chỉ fe-user): dải "Phiếu Duyệt NCC gần đây" + chip (admin dashboard để nguyên).
- types: PeListItem/PeDetailBundle/PeApprovalFlowLevel +field.

Tests: +PeFinalizeProjectionTests (EF-translate smoke 3 subquery + first-reachable + V1-false). Full suite 421→422.
em-main self-gate sau workflow (impl-frontend return rỗng #53 → mirror fe-admin + verify 5 site recover-disk).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-25 14:58:54 +07:00
fa6654b8f4 [CLAUDE] FE: PE tach chon-phieu (inline 3-panel nhu cu) khoi mo-rong (overlay) + nut Xem mo rong moi dong
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 4m47s
anh (annotate 2026-06-19): bam dong phieu = xem thuong inline 3-panel NHU CU; them nut 'Xem mo rong' (Maximize2) goc moi dong -> overlay full-man. Param ?expand=1 tach khoi ?id: click row=select (wide: inline 3-panel / narrow <lg: overlay vi 3-panel khong vua man); 'Xem mo rong'=id+expand; Thu gon/Esc/backdrop=bo expand GIU id (ve inline); Dong/duyet/xoa=clear ca 2 (ve list). Overlay render khi id&&expand; inline detail khi id&&!isExpand. em-main review them !isExpand guard vao 2 panel inline -> tranh double-mount PeDetailTabs/PeWorkflowPanel phia sau overlay (intent comment co nhung code sot). Giu tree 4 tang + PeUrgentChips + overlay a11y (slide/Esc/focus-trap). FE-only, 2 app SHA256-identical. Build PASS x2.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-19 14:57:10 +07:00
3b98845976 [CLAUDE] FE: PE tra danh sach ve layout goc (bam trai lap day) + giu focus overlay bam phieu
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 4m40s
anh Kiet/Tra Sol UAT: list state dang canh giua (max-w-5xl) trong 2 ben -> tra ve bo cuc goc 8e68ed1: grid lg:[400px_1fr_360px], list bam trai + 2 placeholder panel lap day man hinh, KHONG canh giua. Giu nguyen focus overlay S78 (bam phieu -> overlay truot tu phai che het menu+list; Duyet/Thu gon/Esc -> dong ve danh sach). <lg single-col compact. 2 app SHA256-identical. FE-only, 0 BE, 0 migration. Build PASS x2. Recover tu agent process-death (edit hoan chinh tren disk, em-main build-verify + mirror fe-admin).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-19 13:53:11 +07:00
398b01d0a6 [CLAUDE] FE: PE che do tap trung duyet phieu (overlay truot phai, an menu+list) + responsive laptop nho
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 4m40s
Bam phieu -> focus overlay (fixed inset-0 z-50) truot tu phai, che menu+TopBar+list rail; phieu full-width tu cuon + panel duyet ben canh (stack xuong duoi tren man nho). Thu gon/Esc/backdrop HOAC Duyet (chi forward-approve; Tra lai/Tu choi giu overlay) -> dong ve danh sach. List state = panel giua mx-auto max-w-5xl, giu cay 4 tang + PeUrgentChips + search/filter/SLA. Responsive lg-pivot (flex-col stack <lg, flex-row >=lg), compact laptop nho, KHONG dong cham man hinh to (anh: 'man to OK roi'). PeWorkflowPanel +onApproved (wasReject byte-mirror isReject). 2 app SHA256-identical. a11y role=dialog/Esc/focus-trap/scroll-lock/reduced-motion. FE-only, 0 BE, 0 migration. Build PASS x2. Note: backend down luc design -> live authed verify sau deploy.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-19 13:28:26 +07:00
8e68ed1892 [CLAUDE] FE: PE co gap PILL (do PRO / xanh CCM) dong bo moi danh sach + inbox
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 4m46s
Surface co gap GAP tren MOI danh sach phieu de CEO/nguoi duyet thay urgency ngay tren danh sach khong can mo phieu (anh Kiet FDC). Cay danh sach: emoji -> pill labeled. Khung 'Danh sach phieu' cho duyet (Workspace + picker) + inbox 'phieu cho toi duyet': them pill (truoc day thieu). NEW PeUrgentChips.tsx single-source-of-truth (style khop badge detail S69) x2 app. FE-only, 0 BE, 0 migration — DTO da co IsUrgentByPro/Ccm tu S69 Mig 53. Build PASS x2.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-19 12:31:08 +07:00
ebd7e1c42f [CLAUDE] PurchaseEvaluation: cờ gấp PRO/CCM + CCM duyệt-final theo ngưỡng giá trị (Mig 53) + 14 test
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 4m41s
Yêu cầu anh Kiệt FDC (sau họp sếp). Mig 53 AddPeUrgentAndCeoApprovalThreshold — 3 AddColumn, no new table (Mig 52→53). Rollout an toàn: cột nullable, ngưỡng null = giữ luồng duyệt cũ 100% cho tới khi admin set.

B — CCM duyệt-final theo NGƯỠNG GIÁ TRỊ ("gói CEO phân quyền theo giá trị"):
- ApprovalWorkflow += CeoApprovalThreshold (decimal?, admin nhập trong Workflow Designer).
- ApproveV2Async: actor role CostControl (CCM) + winnerQuoteTotal (tổng giá NCC được chọn) < ngưỡng → DaDuyet luôn (bỏ CEO); ≥ ngưỡng → đẩy lên CEO như cũ. Ngưỡng null = luồng tuyến tính cũ. Q4 chốt nhận diện theo ROLE người duyệt.
- reviewer PASS 0 blocker: cascade-safe (Off/role không lan), tested load-bearing (CCM dưới ngưỡng → DaDuyet skip CEO).

A — cờ gấp per-vai (visibility-only, Q3 KHÔNG đổi luồng):
- PE += IsUrgentByPro (PRO đỏ) / IsUrgentByCcm (CCM xanh).
- Endpoint PUT /purchase-evaluations/{id}/urgent role-gated (Procurement→ByPro, CostControl→ByCcm, Admin→cả 2, khác→Forbidden) + notify CEO (Director) khi MỚI bật (best-effort).

FE ×2 app: Workflow Designer ô "Ngưỡng giá trị gói CEO" (fe-admin) + PE detail nút bật/tắt cờ gấp đỏ/xanh theo role + badge GẤP + hint "giá trị gói vs ngưỡng → CCM duyệt-final/cần CEO" + PE list badge gấp.
DTO: PE detail += isUrgentByPro/Ccm + winnerQuoteTotal + ceoApprovalThreshold; list += isUrgentByPro/Ccm; workflow V2 += ceoApprovalThreshold.

+14 test (292→306): PeCcmThresholdFinalizeTests 5 (B routing) + PeUrgentToggleAuthzTests 9 (A authz). Build slnx 0/0 · npm build ×2 0 err · dotnet test 306 PASS.

C (sau duyệt xong chuyển phiếu đến dự án) — chờ anh Kiệt làm chi tiết form, CHƯA làm.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-17 13:27:50 +07:00
c556f6cfa2 [CLAUDE] FE: Văn phòng số re-skin toàn module — 10 page PURO layout + CSS Hồ sơ NS (PageHeader/KpiCard/WidgetCard), phẫu thuật giữ nguyên logic
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 4m42s
Re-skin TRỌN module Office sang bố cục PURO (NamGroup) + ngôn ngữ thị giác Hồ sơ Nhân sự, tái dùng 3 shared component foundation. Phẫu thuật trình bày — logic byte-identical (reviewer verify mọi api.get/post/put/delete + queryKey zero-delta HEAD vs working tree, cả 2 app build PASS).

10 page (9 fe-user → mirror fe-admin SHA256-identical + AttendanceReport fe-admin-only):
- Danh bạ nội bộ — PageHeader + KpiCard tổng hợp (NV/phòng ban) + card icon-chip.
- Phòng họp (lịch + quản lý phòng) — PageHeader amberx + calendar/table trong card-accent.
- Đề xuất (List/Create/Detail) — List: status filter → KpiCard row (6 trạng thái + inbox "Cần tôi duyệt"); Create/Detail: card-accent section + Field idiom.
- Đơn từ/Đặt xe (List/Detail, :kind leave/ot/travel/vehicle) — PageHeader teal + KpiCard status filter (client-side view over fetched) + card-accent detail.
- Ticket CNTT — PageHeader violet + KpiCard 5-status filter + Quá hạn SLA + kanban card-accent.
- Báo cáo chấm công (fe-admin only) — PageHeader + KpiCard tổng hợp + bảng card-accent + Excel-export giữ nguyên.

- Accent chỉ dùng stop hợp lệ (teal/violet/amberx/greenx 50/100/500/600/700; brand 50-900); gotcha #66 clean. a11y giữ/nâng (focus-visible, KpiCard role/aria-pressed/keyboard).
- Build PASS x2 (fe-user index-C8-p69Kn / fe-admin index-yFhLO2Wp). reviewer PASS 0 blocker; 2 concern cosmetic (badge dup ProposalDetail header+row; KpiCard filter lọc trên trang đầu đã fetch — giới hạn pagination có sẵn).
- Office VẪN ẨN non-Admin (chưa golive). 9 page fe-user↔fe-admin SHA256-identical.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-17 09:57:46 +07:00
a8bbdaeeea [CLAUDE] FE: Văn phòng số foundation — shared PageHeader/KpiCard/WidgetCard + Dashboard landing (PURO · CSS Hồ sơ NS) + sync fe-admin index.css + menu Off_Dashboard
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 4m41s
- 3 shared component PageHeader/KpiCard/WidgetCard ×2 app SHA256-identical; tái dùng token Hồ sơ NS (.app-gradient-brand/.card-accent/.icon-chip/.stat-value/.label-eyebrow + accent palette teal/violet/amberx/greenx); gotcha #66 text-white! trên gradient header.
- OfficeDashboardPage 2-cột widget kiểu PURO HomePage: Đề xuất/Đơn từ/Ticket/Phòng họp hôm nay + "Công việc của tôi" + Thao tác nhanh. Reuse query endpoint sẵn có (shared TanStack cache, KHÔNG BE/API mới), đếm client-side, loading/error/empty mỗi widget.
- Sync fe-admin/src/index.css ← fe-user (đóng drift S66-S68: heading 600→700, ink #0f172a→#0b1220, label-eyebrow slate→brand-600 + rule gotcha #66). Nay 2 app đồng bộ.
- Menu key Off_Dashboard (MenuKeys.cs const + All[] + DbInitializer seed Order 0 dưới Off) — no migration, idempotent. GIỮ ẨN non-Admin (RevokeTemporarilyHiddenModules StartsWith Off). Chưa golive.
- Wire 4-place ×2 app: App.tsx route /office/dashboard + menuKeys.ts + Layout staticMap.
- Fix KpiCard activeBorder -300 → -500 (accent palette chỉ 50/100/500/600/700 — chống "vỡ màu im lặng" Tailwind v4: border-teal-300 rơi default Tailwind, border-amberx-300 drop hẳn).
- Build PASS x2 (fe-user index-DrxDysO7 / fe-admin index-TbkadgKd) + dotnet slnx 0/0. reviewer PASS 0 blocker.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-17 09:24:17 +07:00
37752eb914 [CLAUDE] FE: Hồ sơ NS — tên NV đen→trắng (ép text-white! thắng rule h1-h4 ngoài @layer, Tailwind v4) + thu nhỏ text-lg font-bold — x2 app SHA256
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 4m33s
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-16 19:54:46 +07:00
6983609c7b [CLAUDE] FE: Hồ sơ NS — header chi tiết NV nổi bật (tên text-xl extrabold + drop-shadow · meta 13px font-medium trắng · badge trạng thái màu emerald/amber/slate) — x2 app SHA256
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 4m48s
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-16 19:34:35 +07:00
91aaf058fb [CLAUDE] FE: Hồ sơ NS — list pane flex-row gọn (hết tràn ngang rail) + đồng nhất cỡ chữ (x2 app SHA256)
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 4m33s
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-16 14:20:23 +07:00
ab4e681e8e [CLAUDE] FE-User: Hồ sơ NS — đồng nhất font/size + chữ đen sang xanh đậm (brand-800)
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 4m30s
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-16 13:41:33 +07:00
456c7a721b [CLAUDE] FE-User: Hồ sơ Nhân sự — layout 2 cột (tree+list trái, detail phải) + tô màu chi tiết
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 4m19s
Anh góp ý từ eoffice live (3 việc): (1) layout 2 cột giống NamGroup — cột trái dọc =
Cây tổ chức (trên) + Danh sách NV (dưới) chồng nhau, cột phải = chi tiết rộng (panel
list chuyển từ giữa xuống dưới tree); (2)+(3) tô màu panel chi tiết — hệ accent 5 tone
(brand/teal/violet/amberx/greenx) icon-chip + heading -700 + rail màu + nhãn field
brand-tint (trước slate-400 đơn điệu). Responsive <lg = 1 cột.
GIỮ 100%: 5 satellite CRUD (16 endpoint), cây SOLUTION COMPANY, 5 tab, search/filter,
query keys (grep + tsc verified). Build PASS fe-user. Designer tự bắt 2 bug (accent -800
không tồn tại palette -> -700; rail before:content). fe-admin mirror defer.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-16 11:35:31 +07:00
ec517f7174 [CLAUDE] FE-User: cây tổ chức gốc "SOLUTION COMPANY" -> toả xuống phòng ban
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 4m17s
Anh: hiển thị cha-con với gốc SOLUTION COMPANY trên cùng, phòng ban fan-out xuống
(giống NamGroup "Nam Group" là gốc). Gộp nút "Tất cả phòng ban" + list phẳng thành
1 node gốc công ty trong EmployeesListPage org-tree panel: chevron mở/gập
(companyOpen, mở mặc định) + bấm tên = pickDept(null) tất cả NV + CountBadge tổng;
các phòng ban render TreeNode depth=1 toả xuống dưới. Build PASS fe-user (tsc -b).
fe-user only (mirror fe-admin defer cùng Phase B).

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-16 11:23:58 +07:00
318860a38e [CLAUDE] FE-User: Hồ sơ Nhân sự master-detail 3-panel + 5 tab (giống NamGroup)
Anh: bố trí Hồ sơ Nhân sự giống NamGroup HRM. Dựng lại EmployeesListPage:
- Panel trái: cây tổ chức (consume GET /departments/tree) — expand/collapse + badge
  số đếm (totalEmployeeCount) + click lọc theo phòng. Co thành toggle màn hẹp.
- Panel giữa: list (search + status filter) + avatar gradient + status badge.
- Panel phải: chi tiết 5 tab (Tổng quan/Thân nhân/Trình độ/Kinh nghiệm/Hợp đồng) +
  avatar header lớn (gradient brand). Tổng quan 2 cột.
GIỮ 100% 5 satellite CRUD (16 endpoint byte-identical grep-verified) + search + filter
+ query keys. Foundation màu mới + brand #1F7DC1 giữ. Build PASS (tsc -b). fe-admin mirror defer.
(frontend-designer return-rỗng/#53 → em main recover từ disk + build-verify + self-gate.)

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-16 11:13:39 +07:00
c98030f27c [CLAUDE] FE-User: redesign foundation "nâng màu giữ brand" — gradient/accent/badge bắt mắt hơn
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 4m24s
Anh: giao diện đơn điệu, muốn đẹp + bắt mắt, font/màu đẹp hơn. Hướng anh chốt
"nâng màu, giữ nền xanh brand" (eoffice trước). Foundation lan tỏa toàn app, KHÔNG
đụng 65 trang lẻ.
- index.css: +accent palette teal/amberx/violet/greenx (đặt tên né trùng Tailwind)
  + utilities .app-gradient-brand / .card-accent / .icon-chip / .stat-value;
  heading 600->700 đậm hơn; .label-eyebrow brand-600. Brand #1F7DC1 + Be Vietnam Pro GIỮ.
- primitives: Button primary/danger gradient nổi bật; Input/Select/Textarea focus-glow
  mạnh hơn; Label brand-600; Dialog title-bar gradient. variant/size keys STABLE.
- shell: Layout stripe dày hơn + logo cap; PageHeader title lớn/đậm + accent bar cao;
  TopBar gradient hairline; DataTable thead gradient brand chữ trắng.
- Dashboard: KPI cards accent + icon chips.
- color maps (contract/PE phase + PE display status): -700->-800 đậm chữ, phase nháp tint brand.

Visual-only — props/handler/signature nguyên. Build PASS (tsc -b 0 error). a11y:
contrast AA + prefers-reduced-motion. fe-admin mirror đợt sau.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-16 10:12:40 +07:00
79ef8da9f4 [CLAUDE] PurchaseEvaluation: ngan sach goi thau theo Excel anh Kiet - bang tong hop 2 block + nhap theo role PRO/CCM + xoa module Budget cu (Mig 50)
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 4m31s
- Mig 50 ReplaceBudgetModuleWithPeWorkItemBudgets: bang moi PeWorkItemBudgets (1 record/cap Du an x Hang muc, UNIQUE filtered [IsDeleted]=0) + drop 5 bang Budget cu + PE/Contracts drop BudgetId + backfill BudgetManualAmount->BudgetPeriodAmount TRUOC DropColumn (phieu UAT giu so) + DELETE menu/permission Bg_* IN-list children-first
- BE: PUT {id}/budget/pro (role Procurement) + {id}/budget/ccm (role CostControl, Adjustment cho phep AM) fail-closed Forbidden-truoc-side-effect + EnsureTrackedAsync race-safe (catch unique -> re-fetch winner, loi khac rethrow) + auto-create record khi tao phieu + budgetSummary DTO (luy ke trinh-truoc/chon-thau-truoc/de-xuat-ky-nay + full fallback du-tru-PRO + canEdit flags) + submit-guard (3) doi predicate BudgetPeriodAmount -> "chua nhap Ngan sach ky nay" + PATCH budget-adjust absolute-set 2 field moi + Contract GIU BudgetManual* (HD nhap tay khong doi) + ke thua HD map BudgetPeriodAmount
- FE x2 app SHA256 identical: bang "TONG HOP NGAN SACH TRINH KY" block A (full dam + ban hanh + V0 hieu chinh + du tru PRO + ghi chu, editable theo canEditPro/canEditCcm) + block B 9 dong cong thuc Excel (5=1+3, 6=2+4, 7=full-5, 8 tu nhap default 7, 9=4+8) + to mau vuot ngan sach #C00000 / am do / red-soft row8>row7 + "Chua chon" khi count=0 + banner phieu chua gan Hang muc + o "Ngan sach ky nay" o create/header + XOA pages/components/types budgets + routes + menuKeys + Layout staticMap 4-place
- Tests: +22 PeWorkItemBudgetTests (auto-create x3, ensure/race x2, authz matrix PRO x5 + CCM x3, budgetSummary aggregates x5, adjust x4) - 14 BudgetPolicyTests xoa theo module - 1 test via-BudgetId -> 263 PASS (45 Domain + 218 Infra, 0 fail)
- database-agent advise adopted: khong FK vat ly PE/Contracts->Budgets (DropColumn khong can DropForeignKey) + DropIndex truoc DropColumn (SQL 5074) + IN-list thay LIKE Bg_% (underscore wildcard + miss root) + khong Serializable wrap (nested-tx conflict codegen)
- Reviewer PASS-with-minor 0 blocker (verdict-first survived); 2 minor da sua truoc commit (comment adjustMut absolute-set + dead key budgetId); note: F4 approver-edit-budget UI entry tam drafter-only, BE van cho approver scope - cho UAT anh Kiet
- Scaffold-bug caught: EF tu sinh RenameColumn BudgetManualAmount->ExpectedRemainingAmount (SAI semantics) -> thay bang Add+UPDATE+Drop

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-06-13 01:07:27 +07:00
c869d2617d [CLAUDE] PurchaseEvaluation: rename 71 WorkItems theo format PMH anh Kiet FDC chot (MAT-n/SUB-n/MEP-SUB-n/MEP-EQU-n + ten "STT nhom ten") + FE sort numeric
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 4m33s
- anh Kiet 16:59: "MA CV gom chu MEP-SUB-1 roi ten 1 MEP Sub MEP (Full) - dung kieu vay".
- DbInitializer seed tuples 71 ma moi (VT->MAT, TP->SUB, MEP-0n->MEP-SUB-n, TB->MEP-EQU-n).
- scripts/s59-rename-workitems-pmh.sql DA CHAY prod + LocalDB Dev TRUOC push (UPDATE giu Id,
  71/71, OLD-CODES=0, verify JSON qua API prod tieng Viet nguyen ven).
- FE x2 app (SHA256 mirror): PeWorkspaceCreateView + PeHeaderForm sort numeric-aware
  (ma khong pad -> string-sort loan "10"<"2") + tree Panel 1 workItemName numeric:true.
- scripts/master-import-data.generated.md sync 71 dong W| + note mapping.
2026-06-11 17:14:06 +07:00
0eafcd36e7 [CLAUDE] PurchaseEvaluation: tree Panel 1 chot 4 tang "Nam > Du an > Hang muc cong viec > Phieu" (anh chot follow-up, SHA256 mirror x2 app)
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 4m51s
- Doi tu "Du an (Nam)" gop 1 node -> Nam la tang ngoai cung (DESC, bg-slate-50),
  trong Nam chua Du an (A-Z vi), trong Du an chua Hang muc cong viec, roi phieu.
- yearGroups useMemo thay projectGroups + expand-state localStorage key v3.
- Build x2 PASS, SHA256 mirror identical 95D524EE.
2026-06-11 16:36:59 +07:00
56882acc4f [CLAUDE] PurchaseEvaluation: tree Panel 1 doi nhom theo anh Kiet FDC "Du an (Nam) > Hang muc cong viec > Phieu" (bo tang NCC, SHA256 mirror x2 app) + wipe testing data prod S59
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 4m27s
- Tree Panel 1: moi cap (Du an, Nam-tao-phieu) = 1 folder label "Ten du an (Nam)",
  level 2 = Hang muc cong viec (WorkItemId Mig 49, phieu cu null -> "(Chua gan hang muc)"),
  bo tang NCC khoi tree (van hien o card/detail). Expand-state localStorage key v2.
- scripts/s59-wipe-testing-data.sql DA CHAY prod (anh chot AskUserQuestion): xoa 10 PE
  + 7 HD [DEMO] + 64 notif + 1 workflow V2 cu inactive; reset PeSeq/CtSeq -> ma moi tu 001;
  GIU master 70/86/22 + users 55 + templates 9 + 7 workflow ghim. Uploads orphan da don.
2026-06-11 15:35:25 +07:00
e959f72916 [CLAUDE] FE-User: redesign density-first theo UI/UX guide AI_INFRA — giữ brand SOLUTION (S58)
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 4m30s
Anh yêu cầu sau /check-email ai_infra (guide canonical 13 mục "Surgical
Precision Minimalism", anh-approved 06-11): chỉnh giao diện eoffice giống
guide, GIỮ nhận dạng thương hiệu SOLUTION.

14 file fe-user, visual-only (mirror design system fe-admin S55 + đối chiếu
guide; fe-admin/BE untouched):
- index.css: heading ladder semibold (bỏ font-bold) + .label-eyebrow uppercase
  + tnum note. 6 ui primitives (Button/Input/Label/Select/Textarea/Dialog):
  text-xs font-semibold, control h28-40, rounded-lg, focus ring brand-500,
  bỏ shadow trang trí — variant/size keys + props/forwardRef STABLE.
- 6 shell: DataTable (thead sticky + density px-3 py-2 + tnum + RowActions/
  RowActionButton ADDITIVE luôn-hiện không opacity-hover) / Layout (active
  leaf brand left-rail, logic nav/permission nguyên) / TopBar / PageHeader /
  PhaseBadge (ring-current/15) / EmptyState. + LoginPage polish nhẹ.
- BRAND GIỮ: #1F7DC1 (brand-*) + Be Vietnam Pro + neutral slate (guide cho
  plug hue riêng — chia sẻ grammar, không chia sẻ vocabulary-màu).

Verify: npm build ×2 PASS 0 TS err (fe-user 443ms + fe-admin 8.9s untouched-
confirm). Diff-review từng file: functionality keys stable, additive-only.
frontend-designer return-truncated gotcha #53 giữa FD2 screenshot → em main
disk-recover + self-gate (precedent S55); visual live-check sau deploy.

Email AI_INFRA 2026-06-11-ui-ux-design-guide: inbox copy verified hash ✓✓
(whole-file + body), processed sau commit này.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-06-11 13:51:10 +07:00