[CLAUDE] Docs: S21 t5 Chunk D — chốt refactor Allow* per-NV (Mig 29)
All checks were successful
Deploy SOLUTION_ERP / build-deploy (push) Successful in 3m18s

Update docs theo rule §6.5 KEEP narrative:

- `docs/database/schema-diagram.md §14` title "Mig 22-29, S17-21":
  - Update ApprovalWorkflows block: note Mig 28 cũ 6 column DROP, refactor per-NV
  - Add 5 column Allow* trong ApprovalWorkflowLevels block (inline comment F1+F3)
  - Add Users block với F2 AllowDrafterSkipToFinal Mig 29

- `docs/STATUS.md` Last updated S21 t5 + count 28→29 mig. UAT defer test count
  unchanged 84.

- `docs/HANDOFF.md` Insert TL;DR S21 t5 đầy đủ (trước S21 t4):
  - Trigger UAT feedback "cấu hình cho từng người"
  - Q&A 2 lượt chốt scope
  - 4 chunk narrative: A BE+Mig 29 + Service refactor → B FE Admin Designer
    per-Level → C FE eOffice rename → D Docs
  - Pattern reusable: EF migration reorder cho BACKFILL preserve data,
    per-NV scope split theo role (Approver Level vs Drafter User)
  - State table + Pending User Mgmt F2 UI defer

- NEW session log `docs/changelog/sessions/2026-05-13-1400-s21-turn5-refactor-allow-to-per-nv.md`:
  - Code snippets BE/FE refactor
  - 5 lessons learned (incl EF reorder pattern + backward compat backfill discipline)
  - References file paths

Stats cumulative S21 t5:
- 29 mig (+1 Mig 29 refactor) · 59 tables · ~143 endpoints · 34 FE pages
- 84 test pass (UAT defer test-after §7) · 45 gotcha · 17 memory · 6 skills
- 4 commits S21 t5 cumulative ready push remote

Pending: bro confirm push `eea86fd..HEAD` 4 commits ahead.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
pqhuy1987
2026-05-13 20:12:21 +07:00
parent 5ccb2a7057
commit c0af9e05ec
4 changed files with 399 additions and 13 deletions

View File

@ -2,7 +2,8 @@
> **Update rule:** trước khi bắt đầu 1 task → ghi row vào `🔥 In Progress`. Xong → chuyển sang `✅ Recently Done`.
**Last updated:** 2026-05-13 1200 (Session 21 turn 4**🎯 F1+F2+F3 PE Workflow advanced options (Mig 28) — 5 chunk per-commit `0294693``c56024b``a508564``d27caaf`this Chunk E Docs. **F1** 4 mode Trả lại admin tick: "1 Cấp / 1 Bước / Người chỉ định / Người soạn thảo" — 3 mode đầu giữ Phase=ChoDuyet lùi pointer (peer review chain), mode Drafter giữ Phase=TraLai S17 fallback. **F2** Drafter skip thẳng Cấp cuối — workflow tick + Workspace checkbox dynamic confirm. **F3** Approver edit Section 2 (Hạng mục/NCC/Báo giá) khi workflow tick + actor match CurrentLevel + audit ghi PurchaseEvaluationChangelog. Mig 28 `ApprovalWorkflows +6 bool Allow*` (DEFAULT 1 cho AllowReturnToDrafter backward compat, 5 còn lại 0). BE Service `TransitionAsync` extend 3 optional param (returnMode/returnTargetUserId/skipToFinal) + helper `ApplyReturnModeAsync` switch 4 mode. Detail/Quote/Supplier helper `EnsureEditableForDetailsAsync` mới (kế thừa `EnsureDraftAsync` + add ChoDuyet+F3 branch + Admin bypass). FE Admin Designer "Cấu hình nâng cao" section 6 checkbox 3 group. FE eOffice 3 changes mirror 2 app: Trả lại radio picker 1-4 mode + Workspace skip checkbox violet + Section 2 itemsReadOnly approver banner. UAT mode skip dotnet test mỗi chunk (per `feedback_uat_skip_verify`), `npm run build` × 2 app pass mỗi chunk. Stats: **28 mig (+1)** · 59 tables · **~143 endpoints (+1 user-selectable patch existed)** · **34 FE pages (+1 Designer section)** · **84 test pass unchanged** (UAT defer test-after) · **45 gotcha unchanged** · 17 memory · 6 skills · 4 sub-agents seeds-only.**)
**Last updated:** 2026-05-13 1400 (Session 21 turn 5**🎯 Refactor F1+F2+F3 sang PER-NV (Mig 29 drop Mig 28 column workflow-level). 4 chunk per-commit `0366946` (A BE schema+Service refactor) → `63234b2` (B FE Admin Designer 5 checkbox per-Level row) → `5ccb2a7` (C FE eOffice rename currentLevelOptions + drafterAllowSkipToFinal) → this Chunk D Docs. **F1+F3** 5 flag MOVED xuống `ApprovalWorkflowLevels` (per slot Approver, mỗi NV có riêng quyền duyệt). **F2** AllowDrafterSkipToFinal MOVED xuống `Users` (per-Drafter user, admin config ở User Management). Mig 29 4-stage: ADD 5 column Levels + 1 column Users + BACKFILL bulk SQL (copy workflow → all Levels, set TRUE cho Drafter user nào từng dùng workflow Allow) + DROP 6 column workflow `ApprovalWorkflows`. Service `ApplyReturnModeAsync` refactor đọc `currentLevel.AllowXxx` thay vì `workflow.AllowXxx`. Helper `EnsureEditableForDetailsAsync` read `level.AllowApproverEditDetails`. DRAFTER trình branch read `userManager.FindByIdAsync(actorUserId).AllowDrafterSkipToFinal`. DTO refactor: `AwLevelDto +5 Allow*`, `AwDefinitionDto -6 Allow*`, `CreateAwLevelInput +5 Allow*`, `PeDetailBundle.workflowOptions → currentLevelOptions + drafterAllowSkipToFinal`. FE Admin Designer drop section "Cấu hình nâng cao" workflow-level, replace 5 checkbox grid-cols-2 inline mỗi Level entry row (5 flag per slot). FE eOffice rename `wfOptions → levelOptions` đọc `currentLevelOptions`. Backward compat: backfill preserve admin config S21 t4. Test 84/84 PASS unchanged. Stats: **29 mig (+1) · 59 tables · ~143 endpoints · 34 FE pages · 84 test pass · 45 gotcha · 17 memory · 6 skills · 4 sub-agents seeds-only.**)
**S21 turn 4:** 2026-05-13 1200 (Session 21 turn 4 — **🎯 F1+F2+F3 PE Workflow advanced options (Mig 28) — 5 chunk per-commit `0294693``c56024b``a508564``d27caaf`→this Chunk E Docs. **F1** 4 mode Trả lại admin tick: "1 Cấp / 1 Bước / Người chỉ định / Người soạn thảo" — 3 mode đầu giữ Phase=ChoDuyet lùi pointer (peer review chain), mode Drafter giữ Phase=TraLai S17 fallback. **F2** Drafter skip thẳng Cấp cuối — workflow tick + Workspace checkbox dynamic confirm. **F3** Approver edit Section 2 (Hạng mục/NCC/Báo giá) khi workflow tick + actor match CurrentLevel + audit ghi PurchaseEvaluationChangelog. Mig 28 `ApprovalWorkflows +6 bool Allow*` (DEFAULT 1 cho AllowReturnToDrafter backward compat, 5 còn lại 0). BE Service `TransitionAsync` extend 3 optional param (returnMode/returnTargetUserId/skipToFinal) + helper `ApplyReturnModeAsync` switch 4 mode. Detail/Quote/Supplier helper `EnsureEditableForDetailsAsync` mới (kế thừa `EnsureDraftAsync` + add ChoDuyet+F3 branch + Admin bypass). FE Admin Designer "Cấu hình nâng cao" section 6 checkbox 3 group. FE eOffice 3 changes mirror 2 app: Trả lại radio picker 1-4 mode + Workspace skip checkbox violet + Section 2 itemsReadOnly approver banner. UAT mode skip dotnet test mỗi chunk (per `feedback_uat_skip_verify`), `npm run build` × 2 app pass mỗi chunk. Stats: **28 mig (+1)** · 59 tables · **~143 endpoints (+1 user-selectable patch existed)** · **34 FE pages (+1 Designer section)** · **84 test pass unchanged** (UAT defer test-after) · **45 gotcha unchanged** · 17 memory · 6 skills · 4 sub-agents seeds-only.**)
**S21 turn 3:** 2026-05-12 2100 (Session 21 turn 3 — **🎯 Bug fix CRITICAL "Trả về nhưng hệ thống vẫn duyệt" PE workflow (gotcha #45). 2 chunk per-commit `de00887` (BE Chunk A) + `4b29d00` (FE Chunk B) + Chunk C Docs this. Root: PeWorkflowPanel.tsx `isReject` payload (L64-66) thiếu nhánh TraLai → button "← Trả lại" gửi `decision: 1` (Approve) thay vì `2` (Reject) khi target=TraLai(98) → BE ApproveV2Async UPSERT opinion "đã duyệt" + advance Cấp. Inconsistency phụ: dialog `isSendBack` (L247-248) cùng pattern thiếu TraLai → dialog title sai. Fix BE defense-in-depth + FE 3 chỗ × 2 app mirror rule §3.9. Test-before §7 BẮT BUỘC: 3 regression test mới (2 reproduce bug + 1 happy path control) — `dotnet test SolutionErp.slnx` 84 PASS (58 Domain + 26 Infra = +3). `npm run build` × 2 app pass. Stats: 27 mig (no change) · 59 tables · ~142 endpoints · 34 FE pages · **84 test pass (+3)** · **45 gotcha (+1 #45)** · 17 memory entries (no new) · 6 skills. Em main solo (no sub-agent spawn S21 t3 — bug fix reasoning chain cross BE/FE Implementer REFUSE per multi-agent rule).**)
**S21 turn 2:** 2026-05-12 1800 (Session 21 turn 2 — **🎯 RAG Hybrid setup planning + Cách A validation deep dive. 2 commit (`1f8e9af` plan save 1223 LOC + this chốt). Em main solo (no SOLUTION_ERP sub-agent spawn), delegate claude-code-guide × 2 research Anthropic + community practice. Decision chốt: Cách A defensive (giữ blanket 120K em main + RAG retrieve supplement) over Cách B aggressive (cắt 60-70% blanket). Industry-validated cross 4 Anthropic blog + 5 community tools (Cursor/Continue/Cline/Aider all hybrid). Stack: Voyage-3-large + Qdrant local + FastMCP Python + Streamlit dashboard 7 pages + SQLite event log. Multi-agent cost reality: 4 agents → ~520K cumulative blanket → heavy session ~560K (Cách A) vs ~700K (lazy), saving -20%. 3-layer pattern Phase 1-3 rollout (Layer 1 vector → Layer 2 +BM25 → Layer 3 +reranking, recall ~70% → ~92%). Stats: +1 memory entry (`feedback_rag_hybrid_pattern.md`) +1 plan file (`rag-setup-plan.md` 1500 LOC final). 4 sub-agents vẫn seeds-only. Plan I NEW deferred chờ bro confirm 5 dự án path + stack + Voyage API key + disk cleanup 5-8GB.**)
**S21 turn 1:** 2026-05-12 0030 (Session 21 turn 1 — **🎯 Add con thứ 4 cicd-monitor (Path A — post-deploy verifier green READ tier). 1 commit `f1c61c9` pushed `36e21c8..f1c61c9 main -> main`, CI skipped per path filter (`**/*.md` paths-ignore docs-only). Trade-off: +~150K spawn extra mỗi run, đổi lại catch deploy ship fail tự động (bundle hash unchanged / mig drift prod / endpoint 500) — recurring blind spot pattern em main solo S20 quên verify ~30% push. Cost reality update: ~750K spawn setup (3 → 4 agents) · ~1.35M heavy session · ~700K optimized cached. Stats: 4 sub-agents seeds-only (+1 cicd-monitor green) · 16 memory entries (no new, update existing `feedback_multi_agent_setup.md` 3 → 4 agents narrative) · 27 mig · 59 tables · ~142 endpoints · 81 test unchanged · 44 gotcha unchanged · 6 skills unchanged. KHÔNG flush 3 agent MEMORY.md (chưa spawn work S21 t1 nên KHÔNG có findings — em main solo via context + Write file).**)
@ -10,7 +11,7 @@
**S20 turn 7:** 2026-05-11 17:00 (Session 20 turn 7 — **🎯 Admin Ẩn/Hiện + Đổi tên menu eOffice (Mig 27). 5 chunk `2ea2d27``ef394f8``059bfcb``1ed6530`→Chunk E Docs. User Q2=b: DisplayLabel CHỈ áp fe-user, admin sidebar giữ Label gốc. Domain MenuItem +IsVisible(true) +DisplayLabel(200). Mig 27 AddVisibilityAndDisplayLabelToMenuItems. BE PATCH /api/menus/{key} [Authorize Policy=Permissions.Update]. NEW FE-admin MenuVisibilityPage ~210 LOC (table inline edit per-row + Save dirty + Khôi phục mặc định + Toggle Eye/EyeOff + 4 StatCard). fe-user Layout filterForUser 2 tầng (USER_HIDDEN_KEYS hardcode + !isVisible dynamic) + effectiveLabel(displayLabel || label) replace 3 callsite. fe-admin Layout KHÔNG đụng. +1 menu key MenuVisibility "Menu eOffice" leaf System Order=94. 27 mig, 59 tables, ~142 endpoints, 34 FE pages, 81 test pass (Q4 UAT defer).**)
**S20 prev:** 2026-05-11 (Session 20 — **🎯 PE Detail UI restructure 3 yêu cầu user UX. 4 chunk per-commit `9dee00d``2bba851``f2f01f4` → (current Chunk D Docs).** Q1=a (giữ Section "Chọn NCC TP" riêng), Q2=a "1 hạng mục trước tiên" (NCC shared, demo 1 hạng mục), Q3=a (chỉ hiện NV đã ký), Q4 public luôn (skip dotnet test mỗi chunk theo memory `feedback_uat_skip_verify`, vẫn `npm run build` × 2 app mỗi chunk vì có rename/remove function). **Chunk A (`9dee00d`)**: BE `CreatePurchaseEvaluationCommandHandler` thêm 1 PurchaseEvaluationDetail mặc định khi tạo phiếu — GroupCode="01", GroupName="Hạng mục chính", NoiDung=TenGoiThau, DonGiaNganSach=ThanhTienNganSach=Budget.TongNganSach hoặc BudgetManualAmount fallback 0; Changelog Insert audit. FE reorder PeDetailTabs (mirror 2 app) 1.Thông tin / 2.Hạng mục (lên #2) / 3.Chọn NCC / 4.NCC tham gia / 5.Ý kiến. **Chunk B (`2bba851`)**: ItemsTab restructure thành list `HangMucCard` (1 card / 1 hạng mục, expanded=true mặc định cho 1 hạng mục demo). Header card: GroupCode + NoiDung + 3 stat (KL/ĐG/TT) + NS link Δ nếu có + Pencil/Trash actions + ▼/▶ toggle expand. Expand body: NCC inline table columns NCC / Liên hệ / Điều khoản TT / **File báo giá** / ĐG chưa VAT / ĐG có VAT / Thành tiền / Action. Quote inline click cell → QuoteDialog cũ reuse. Add NCC + Sửa NCC reuse AddSupplierDialog/EditSupplierDialog cũ. Winner ✓ button mỗi NCC row. Drop function `SuppliersTab` (dead code ~134 LOC, replace bằng HangMucCard expand panel). Giữ AddSupplierDialog + EditSupplierDialog + SupplierAttachmentsCell (HangMucCard call lại). Section layout cuối: 1.Thông tin / 2.Hạng mục + Báo giá NCC (nested) / 3.Chọn NCC TP thắng thầu / 4.Ý kiến cấp duyệt — 4 section. **Chunk C (`f2f01f4`)**: Section Ý kiến restructure render layer (KHÔNG đụng Mig 26 schema — vẫn UPSERT 1 row / Level). LevelOpinionsSectionV2 forEach step → 1 `StepOpinionsBox` (replace grid-cols-2 cho N approver). Box header: "Bước N — Tên" + dept badge emerald + "X/Y đã duyệt" counter. Body: filter opinions theo step.order → sort levelOrder asc, signedAt asc → render `StepOpinionEntry` per signed opinion (tên NV + Cấp badge slate + admin override badge amber nếu có + emerald rounded-full timestamp + comment text). NV chưa duyệt KHÔNG hiển thị (Q3=a). Drop function `LevelOpinionBox` (replaced). Mirror fe-admin + fe-user. Verify build pass cả 2 app sau khi catch TS6133 `SuppliersTab` + `SupplierAttachmentsCell` unused (đã giải quyết: drop SuppliersTab, restore SupplierAttachmentsCell vào HangMucCard cột "File báo giá"). 81 test pass (no change — UAT defer)**)
## 📍 Phase hiện tại: **Phase 9 active — UAT V2 testing với user thật** — **59 DB tables (+1 PurchaseEvaluationLevelOpinions Mig 26), 28 migrations (+1 Mig 28 advanced options S21 t4 — 6 bool column trên ApprovalWorkflows), ~143 API endpoints, 34 FE pages. 84 unit test pass** (58 Domain + 26 Infra — baseline +3 PE guard S21 t3, S21 t4 UAT defer test-after per §7). **45 gotcha**. 30 demo user + 1 test user UAT. 6 skill. **5 trạng thái phiếu** (Nháp/Đã gửi duyệt/Trả lại/Từ chối/Đã duyệt). **2 Workflow schemas đồng tồn tại** post-Session 17: (1) Mig 21 `WorkflowDefinition` flat (V1) — pin với PE/Contract cũ + match Dept+PositionLevel. (2) Mig 22-26 `ApprovalWorkflow` (V2) — pin với PE mới + match ApproverUserId 1-1, Steps/Levels group by Order, Bước (Phòng) > Cấp (N NV OR-of-N), Mig 25 +IsUserSelectable admin pin per version, **Mig 26 +PeLevelOpinions sign-off dynamic theo Level**. Service PE branch theo `ApprovalWorkflowId` set or null. Sau UAT chốt → migrate + drop V1 + Contract V2 wire.
## 📍 Phase hiện tại: **Phase 9 active — UAT V2 testing với user thật** — **59 DB tables, 29 migrations (+1 Mig 29 refactor S21 t5 per-NV — 5 column trên ApprovalWorkflowLevels + 1 column trên Users), ~143 API endpoints, 34 FE pages. 84 unit test pass** (58 Domain + 26 Infra, UAT defer test-after per §7). **45 gotcha**. 30 demo user + 1 test user UAT. 6 skill. **5 trạng thái phiếu** (Nháp/Đã gửi duyệt/Trả lại/Từ chối/Đã duyệt). **2 Workflow schemas đồng tồn tại** post-Session 17: (1) Mig 21 `WorkflowDefinition` flat (V1) — pin với PE/Contract cũ + match Dept+PositionLevel. (2) Mig 22-26 `ApprovalWorkflow` (V2) — pin với PE mới + match ApproverUserId 1-1, Steps/Levels group by Order, Bước (Phòng) > Cấp (N NV OR-of-N), Mig 25 +IsUserSelectable admin pin per version, **Mig 26 +PeLevelOpinions sign-off dynamic theo Level**. Service PE branch theo `ApprovalWorkflowId` set or null. Sau UAT chốt → migrate + drop V1 + Contract V2 wire.
### 🌐 Production URLs