[CLAUDE] Docs: S55 Phase 1 FE redesign closeout (Run #378) — bundle 4SUwDLD8 + session log
fe-admin density-first redesign live prod (admin bundle B-d6893W→4SUwDLD8, user unchanged, no mig). STATUS bundle + Recently Done redesign entry + session log redesign section. Phase 2-3 pending. Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
This commit is contained in:
@ -24,7 +24,7 @@
|
||||
| Sub-agents | **11** | Opus 4.8 1M · 9 product/quality (7 core + frontend-designer + database-agent) + 2 monitor INFORM-only (tooling-auditor H1 + harvest-curator H2). ✅ database-agent **verified-runtime S53** (spawn-test PASSED — caught Mig 46-unapplied-local drift) |
|
||||
| RAG chunks | **2416** | Recovered S52 (S51 Qdrant DOWN → nay alive, rerank live 0.9375). Stale `last_indexed 05-29` (S42-S52 via store_memory stopgap; full re-index = AI_INFRA op cần VOYAGE_API_KEY). |
|
||||
|
||||
**Bundle hash live (prod):** admin `B-d6893W` · user `XdKzt9LL` (S55 — cả 2 rotate, ProjectsPage form +4 cột 2 app). Deploy verified Run #377 (`69cb393`, ~4m33s): Mig 48 applied prod · Projects spot-6/6 (APVN01…ZOTE01) · WorkItems VT/TP/MEP/TB=71 · Suppliers(TRUONGGIANG/TANPHU/TGN)=3 · CAL01.Investor="Công ty TNHH Calofic" (N-literal) · health 200/200 · `/api/projects` 401 wired.
|
||||
**Bundle hash live (prod):** admin `4SUwDLD8` · user `XdKzt9LL` (S55 — admin rotate 2× [master-data form rồi redesign]; user 1× [master-data]). Latest deploy Run #378 (`7feb53e`, ~4m24s): **Phase 1 FE redesign fe-admin** (density-first design system, giữ brand #1F7DC1) — admin bundle `B-d6893W`→`4SUwDLD8`, user `XdKzt9LL` UNCHANGED (scope-correct FE-admin-only), no new mig, health 200/200. Prior Run #377 (`69cb393`): Mig 48 applied prod · master data real Projects 6/6 · WorkItems 71 · Suppliers 3 · CAL01.Investor exact.
|
||||
**Phase:** ✅ Phase 10 COMPLETE · ✅ **Phase 11 product backlog ĐÓNG TRỌN** — P11-A/B/C/**D/E/F** ALL DONE (deployed prod) · 🚫 Phase 9 Ops blocked (anh main coordinate — S54 chưa khởi động, anh dừng).
|
||||
|
||||
> ⚠️ **Count drift fixed S40:** endpoints ~223→**211**, FE pages 53→**65**, menu keys 85→**~53**. Tables **84 confirmed correct** (DbSet 77 + Identity 7). 3 số "khó fake" (mig/gotcha/git) luôn đúng. Cause: số "incremented mỗi session" over/under-count optimistic — re-ground định kỳ.
|
||||
@ -45,6 +45,13 @@
|
||||
|
||||
## ✅ Recently Done (newest on top — 3 session; cũ hơn → session logs)
|
||||
|
||||
### S55 cont. (2026-06-09) — ✅ Phase 1 FE redesign fe-admin (density-first, giữ brand) — HMW-mode ON, prod-verified
|
||||
- **Commit `7feb53e` → Gitea Run #378 PASS ~4m24s, prod-verified.** Anh: `/check-email NAMGROUP` (nhận bộ quy ước UI density-first) → "thiết kế lại giao diện cho đẹp hơn, tham khảo NAMGROUP, cho designer làm, workflow plan + làm luôn".
|
||||
- **🩷 frontend-designer** redesign **14 file fe-admin** (Phase 1 foundation): `index.css` density heading-ladder + `.label-eyebrow` util (drop font-bold) · 6 UI primitive (Button/Input/Label/Select/Textarea/Dialog → `text-xs font-semibold`, `py-1.5` ≤36px, `rounded-lg`, brand focus-ring) · 6 shell (DataTable sticky-thead+RowActions / Layout brand-rail / TopBar / PageHeader / PhaseBadge / EmptyState) · **DashboardPage** flagship (KPI cards + brand-50 icon chips + uppercase labels + accent bars).
|
||||
- **GIỮ brand** #1F7DC1 + Be Vietnam Pro (NAMGROUP nói brand=Solution tự quyết → chỉ mượn cấu trúc density). Visual-only, **functionality nguyên** (Button variant/size keys stable 51 call-sites, props/forwardRef intact).
|
||||
- **🟥 reviewer PASS** 0 blocker (regression all-preserved, brand-confirmed `index.css:3/22/34`, exactly 14 file) — 2 minor a11y defer (slate-400 hint nhỏ). **🟩 cicd Run #378:** admin bundle `B-d6893W`→`4SUwDLD8`, user `XdKzt9LL` UNCHANGED (asymmetric FE-admin-only verify), no mig, health 200.
|
||||
- ⚠️ **2 agent truncated** (designer + reviewer-#1, gotcha #53) → em main recover disk (build+login-visual+diff-review). **Dashboard live-screenshot bị chặn** dev auth-rig (API HTTPS vs proxy HTTP + protected route) → xem live qua deploy. Designer rig-gotcha #3 logged. **⬜ Phase 2** (Suppliers/Projects/Contracts pages) + **Phase 3** (mirror fe-user) pending. → session log `2026-06-09-S55-master-data-import.md` (redesign §).
|
||||
|
||||
### S55 (2026-06-09) — ✅ Nạp master data thật từ Excel + Project +4 cột (Mig 48) — HMW-mode ON, prod-verified
|
||||
- **Commit `69cb393` → Gitea Run #377 PASS ~4m33s, prod-verified.** Anh: `/session-start` → giao file Excel "HẠNG MỤC CÔNG VIỆC DỰ ÁN" → "nạp master data vào đi nhé" → `/ultra-on "workflow làm xong hết"`.
|
||||
- **Nạp 3 nguồn thật** (Excel 7-sheet → loadable): **62 Projects** (Mã+Năm; ~6 có CĐT/địa điểm/gói thầu) · **71 WorkItems** hạng mục (Vật tư16/Thầu phụ30/MEP9/Thiết bị16) · **3 Suppliers** (TRUONGGIANG/TANPHU/TGN). `WorkItem` master ĐÃ tồn tại → no new table cho hạng mục.
|
||||
|
||||
Reference in New Issue
Block a user