[CLAUDE] Docs: S89 closeout — PE visibility/finalize + user-cleanup + Word guide

- STATUS/HANDOFF: prepend S89 (demote S88); state Mig 59 · 422 test · prod 17 user
- session log 2026-06-25-S89 (D1 draft-privacy IDOR · D2 CCM suggested-price !readOnly · D3 finalize-note 3-surface + flow badge + matrix flag · prod user-delete · Word guide)
- docs/Huong-dan-Duyet-NCC.docx (skill docx — logo Solution, 8 sections, khoanh-do 1->2->3; real screenshots pending anh)
- harvest residual workflow-sub agent-memory (cicd / investigator-codebase / reviewer + 2 plan-reviews)

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
This commit is contained in:
pqhuy1987
2026-06-25 17:05:49 +07:00
parent 681b1edc7e
commit 946c5b21ae
9 changed files with 107 additions and 5 deletions

View File

@ -8,6 +8,8 @@
- [S62 PE budget soft-warning](project_s62_pe_budget_soft_warning.md) — PASS: hard-block→soft-warning; submit-guard intact + validator giữ `BudgetPeriodAmount>0`, row8 negative-safe (additive-only). Validator class `PurchaseEvaluationFeatures.cs:317`.
- [Wire/mirror claim verification anchors](feedback_wire_claim_verification_anchors.md) — sha256 twin-file · `git diff -U0` isolate true-adds · `allowNegative` bleed check · guard-still-intact grep.
- [S89 PE budget-sectionB review](project_s89_pe_sectionb_review.md) — investigator 3/3 upheld (do-not-touch FROZEN) + CAUGHT MISSED #70 race: Block B PRO row3/row8 share adjustMut + cross-echo `ev` stale + NO `||peFetching` (every other cell gated). authz-lens ≠ concurrency-lens.
- [S89 PE ends-before-CEO PLAN review](project_s89_pe_endsbeforeceo_plan_review.md) — CONCERN: BE 3-field design sound (Mig 58 col committed, no mig) but FE coverage gap — 4 PeUrgentChips render-sites, plan covered only 2 (missed InboxPage:290 despite BE Inbox A2 updated + wrong ListPage dir path).
- [S89 finalize-note PLAN review](project_s89_finalize_note_plan_review.md) — CONCERN: plan ground-truth 100% accurate (all file:line verified incl self-flagged); gaps = note doesn't say intermediate approvers still sign + skipToFinal-last-level corner + Dev DB 9 migs behind.
---