[CLAUDE] Docs+Memory: S36 wrap — Plan G-O2 Phòng họp ALL DONE deploy prod end-to-end
S36 sequence done end-to-end 6 step trong 1 session (1 commit + 1 CI Run): 1. Curate 2 MEMORY (Implementer 36.4→31.7KB + CICD 40.4→28.3KB archive q4.md) 2. Investigator pre-flight G-O2 (clean-room 3 entity + FullCalendar v6 alternative) 3. Em main solo Mig 36 schema + Apply Dev+Design DB 4. Implementer BE CQRS (584 LOC) + Application.csproj +Relational fix gotcha #53 4th 5. Implementer FE 2 app (1770 LOC SHA256 IDENTICAL × 2 app + Pattern 16-bis 7×) 6. Reviewer Smart Friend 9× cumulative CLEAN + CICD Run #359 PASS Verify cumulative S36: - Run #359 sha=f45090b 3m55s success - Bundle rotate × 2 (admin Bl6e54yi→C9kzTTmq + user DHmW2tUF→CC4DQ-Tr) - Mig 36 prod head + 4 sample room + 4 menu seeded - 0 prod regression observed - 130/130 test PASS baseline preserve State chốt S36: - 36 mig (+1) · 74 tables (+3) · ~201 endpoints (+9 Meeting) - 45 FE pages (+2 × 2 app) · 73 menu keys (+4 Off_PhongHop) - Reviewer 9× cumulative + Pattern 16-bis 7× + Pattern 12-bis 10× cumulative - 3 minor defer (AttendeeInput.Notes + Room race + silent skip) non-blocking Next S37: Plan 10.3 Pre-flight Mig 37 enum extend +5 values → G-O3 Đề xuất. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
@ -374,11 +374,7 @@ KHÔNG `*` / `latest`. Critical pins:
|
||||
|
||||
## 📅 Recent activity (last 10 FIFO)
|
||||
|
||||
- **2026-05-26 (S33 Plan B G-H1 Task 5 — Phase 10.1 FE 2 app HRM scaffold Case 2 cookie-cutter cross-app mirror):** Em main spec deterministic 100% ULTRA-MINIMAL scope (Phase 1 read-only, no separate DetailTabs component, inline 6-section `<details>` collapsible, no satellite CRUD). Implementer Case 2 cross-app mirror 4-place ACCEPT clean. Tổng 14 file (3 NEW page × 2 app SHA256 IDENTICAL + 4 modified file: menuKeys+Layout+App × 2). **3 NEW file SHA256 verified IDENTICAL:** `types/employee.ts` CCFC70666568 + `pages/hrm/EmployeesListPage.tsx` DC859C897C5C + `pages/hrm/EmployeeCreatePage.tsx` C796F25D01AC. Pattern 16-bis 4-place mirror cross-app reinforced **4th time cumulative** (S29 Plan CA HF1 + S29 Plan B Chunk D + S33 Task 5). Pattern 12-bis cross-module FE port PE → Hrm reinforced **4th time** (Plan B Chunk C Mig 33 + Plan B G-H1 Task 4 BE + Task 5 FE). **Verify all clean:** fe-admin build PASS (21.4s 0 TS err 1429KB bundle warn expected), fe-user build PASS (9.2s 0 TS err 1345KB bundle warn expected), dotnet build PASS (1.59s 0 warn 0 err), dotnet test PASS **120/120 baseline preserve** (58 Domain + 62 Infra). **Ambiguities encountered:** 0 — spec deterministic 100%. **Files touched:** fe-admin/src/types/employee.ts (NEW, ~283 LOC), fe-admin/src/pages/hrm/EmployeesListPage.tsx (NEW, ~417 LOC), fe-admin/src/pages/hrm/EmployeeCreatePage.tsx (NEW, ~178 LOC), fe-admin/src/lib/menuKeys.ts (+3 LOC Hrm+HrmHoSo), fe-admin/src/components/Layout.tsx (+4 LOC staticMap Hrm_HoSo), fe-admin/src/App.tsx (+5 LOC imports+routes), 6 fe-user files mirror identical (3 SHA256 + 3 edit mirror Hrm_HoSo). **Out-of-scope respected:** KHÔNG satellite CRUD form, KHÔNG inline edit Header, KHÔNG PermissionGuard wire (em main Task 6 Hrm_HoSo policy registration). KHÔNG add Bg_*/Catalog* to fe-admin menuKeys.ts (em main defer optional). **Token cost estimate:** ~25k tokens (Read 8 reference + Write 3 file + Edit 6 + 3 Bash verify). KHÔNG commit (em main commits). Tag: `[mirror-page, phase-10.1, frontend]`.
|
||||
|
||||
- **2026-05-26 (S32 wrap — em main proxy curate + Plan G 11 module future scope):** Session 32 đóng clean. Em chủ trì spawn em 1 lần S32 startup verify (ab23cc322b5d495c0 alive, MEMORY size FLAG 36.2KB > 25KB). **Em main proxy curate Plan A3:** archived 5 verbose entries q2 (S25 Plan AB Chunk A + S25 wrap + S26 t1 Plan AG + S27 Plan CA Chunk B + S29 Plan B Chunk D detail) → 36.2→27.5KB. Patterns 1-19 + 12-bis + 16-bis foundation **preserved untouched**. **Plan G 11 module backlog DOCUMENTED migration-todos** với 10 Plan G-* atomic sprint. **Pending tasks em main S33 spawn em Case 2 cookie-cutter mirror:** (a) **Plan G-H1 Hồ sơ NS scaffold** — BE 6 entity (EmployeeProfile main + 5 satellite WorkHistory/Education/FamilyRelation/Skill/Document) + EF Config + DbInitializer seed 30 demo profile mirror 30 users + CQRS Create/Update/GetDetail/List + 6 endpoint controller + FE 2 app types/employee.ts + EmployeesPage 3-panel + EmployeeDetailTabs (6 section); (b) **Plan B-Wrap test bundle BW1-BW7 codegen** — Case 2 cookie-cutter mirror PE WorkflowService test pattern (PurchaseEvaluationWorkflowServiceReturnModeTests.cs structure) cho ContractWorkflowServiceApproveV2Tests.cs (7 test scenario spec deterministic migration-todos D-Bis); (c) **Plan G-O2 Phòng họp BookingCalendar** — Case 2 FE 2 app FullCalendar lib new dep; (d) **Plan G-O3..G-O6 Workflow Apps** — cookie-cutter mirror PE Mig 22-26 Plan B pattern 12-bis cross-module entity scaffold cho 4 module (Proposal/LeaveRequest/OtRequest/VehicleBooking/ItTicket). **REFUSE forward:** S33+ start Phase 10.1 G-H1 entity scaffold đúng spec deterministic, KHÔNG schema design (em main solo Mig 34 design). Token cost wrap ~5K. Tag: `[wrap, phase-9-to-phase-10, frontend+backend]`.
|
||||
|
||||
- **2026-05-26 (S32 startup — context verify + RAG live confirm + size FLAG > 25KB):** Em chủ trì spawn em verify Session 32 context. **Verify done:** (1) MEMORY size 36.2KB (Get-Item Length=36207 bytes) — **OVER 25KB threshold ~45% bigger** → FLAG cho em main schedule dedicated curate session per Pattern curate trigger rule line 364. KHÔNG self-curate vì em chủ trì preference reserve cho em main solo judgment call §6.5 KEEP vs CUT (S27 retrospective C1-C4 task lesson). (2) Patterns saved 1-12 foundation + 12-bis NEW S29 + 13-15 + 16-bis NEW S29 + 17-19 — total **17 numbered patterns** (Pattern 16 baseline implied trong recent activity S27 chưa numbered explicit). Pattern 12-bis (cross-module entity cookie-cutter mirror PE→Contract Mig 33) **SAVED line 178-200** confirmed present. Pattern 16-bis (4-place mirror cross-app S29 Plan CA Hotfix 1) **SAVED line 165-176** confirmed present. (3) MCP RAG tools **PRESENT** — `mcp__rag-unified__search_memory` + `mcp__rag-unified__cross_project_search` both visible trong tools list. Test query "Pattern 12-bis cross-module entity cookie-cutter mirror PE Contract V2" top_k=3 returned 3 results với rerank scores **0.824/0.801/0.793** — all healthy > 0.7 threshold. S31 RAG v1.3 baseline PASS confirmed live post CLI restart. **Pending tasks em main có thể gọi em lại spawn S32+:** (a) Plan B-Wrap BW1-BW7 test bundle codegen Case 2 cookie-cutter mirror PE WorkflowService test pattern (regression ApproveV2Async + UPSERT LevelOpinions test) — 7 file new test class mirror PE test bundle structure; (b) ContractWorkflowMatrixView mirror PE WorkflowMatrixView Plan AA S24 (1 page mirror cross-module — Case 2 fits Pattern 13 read-only admin Designer mirror + Pattern 14 Tailwind JIT palette + Pattern 15 HTML table rowSpan iteration helper). **Decision tree forward:** Em chủ trì gọi em với task code edit → em ACCEPT case (a)/(b) khi spec deterministic, REFUSE nếu first-time pattern. Em chủ trì confirm Layer A governance still active scope SOLUTION_ERP. Token cost spawn này ~5k (3 Read + 1 RAG query + 1 Edit + final report). KHÔNG curate — defer em main full curate session. Tag: `[verify, phase-9, infra]`.
|
||||
- **Archived 3 entries (S32 startup + S32 wrap + S33 Task 5) → `archive/2026-05-q4.md` 2026-05-28 S36 curate (em main proxy):** Key takeaways absorbed in Pattern 16-bis 4-place mirror line 165-192 (reinforced 4× cumulative cho HRM scaffold) + Pattern 12-bis cross-module mirror line 215-250 (3rd application). Plan G 11 module backlog moved to `migration-todos.md` §Phase 10. RAG live confirm `mcp__rag-unified__*` 6 tools working baseline S31 PASS.
|
||||
|
||||
- **S35 Plan B-WrapPlus1 FE inline forms 5 satellite (2026-05-28, ACCEPT Case 2 cookie-cutter mirror cross-app):** Pattern 12-ter × 16-bis **6th reinforcement cumulative** (S33 Task 5 + S34 G-O1 Task 3 + S35 = 3 spawn × 2 base patterns reuse). Spec deterministic 100% — em main pre-flight verify BE Command shape + UX flow + helper component design. **Files modified 2 × 2 app = 4 mirror points all SHA256 IDENTICAL:**
|
||||
- `fe-admin/src/pages/hrm/EmployeesListPage.tsx` 573→**1200 line** (+627 LOC, SHA256 `802d01fd1ee79925`)
|
||||
|
||||
Reference in New Issue
Block a user