[CLAUDE] Memory: S32 wrap — 4 sub-agent MEMORY append S32 wrap entry (em main proxy)
4 sub-agent MEMORY append S32 wrap entry FIFO top: - Investigator (20.6KB): S32 startup verify spawn + NamGroup audit pre-flight hit limit + em main solo audit fallback findings + Plan G 11 module DOCUMENTED. Pending S33 spawn: Plan G-H1 NamGroup TblNhanVien* audit (priority high). - Implementer (29.2KB): S32 startup verify spawn + em main proxy curate 5 entries S25-S29 -> q2. Patterns 1-19+12-bis+16-bis foundation preserved. Pending S33 spawn: Plan G-H1 6-entity scaffold + Plan B-Wrap BW1-BW7 codegen + Plan G-O2 BookingCalendar + Plan G-O3-O6 workflow apps mirror PE V2. - Reviewer (26.5KB): S32 startup verify spawn (self-curated S27 retro dropped). Smart Friend 4x cumulative preserved. Pending S33 spawn: Plan B-Wrap test bundle adversarial review + Plan G-H1 Mig 34 schema pre-commit + Phase 9 UAT hard blocker security audit. - CICD Monitor (26KB): S32 startup verify spawn + Run #231 PARTIAL detail archived q2. No new Run S32 (5 commits docs-only CI skip). 3 prod endpoint smoke 200 OK preserved. cert notAfter 2026-07-23 verified. Pending S33 spawn: Phase 10.1 G-H1 first code commit Run verify + Plan B-Wrap test count delta + V2 contract create flow UAT smoke. Re-ingest stats: 166 files -> 2991 chunks (+3 delta S32 wrap content). Cache hit 11.4s vs initial 75.7s = 6.6x speedup post Plan A2. RAG eval v1.1 verify: recall@5=1.000 (11/11) PASS, avg_rerank ~0.84 preserves S31 baseline. Negatives q12-q14 correctly excluded (rerank 0.40-0.43 < 0.7). Refs: docs/STATUS.md S32 wrap. docs/HANDOFF.md S32. migration-todos.md §Phase 10 + §D-Bis + §A + §E. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
@ -129,6 +129,8 @@ State machine 5 trạng thái phiếu PE: Nháp / Đã gửi duyệt / **Trả l
|
||||
|
||||
## 📅 Recent activity (last 10 FIFO)
|
||||
|
||||
- **2026-05-26 (S32 wrap — em main proxy update final state):** Session 32 đóng clean. Em chủ trì spawn em 2 lần S32: (1) startup verify ~10K (afaf6d52a6a59a844 alive) + (2) NamGroup audit pre-flight ~30K (a533c3e8ed4e03bfe hit limit 157K/72 tool_uses fallback em main solo audit). **Em main solo audit NamGroup directly** thay vì re-spawn: discovered NAMGROUP.Server\Data\Entities có 8+ TblNhanVien* (QtCongTac/QtDaoTao/QuanHeThanNhan/KyNangViTinh) + 4 bảng org chart (SoDoToChuc/SoDoKhoi/ChucDanh/ViTri) + Announcement/InternalDocument/TblMenu. **Plan G 11 module port DOCUMENTED migration-todos** với 4 quyết định chốt anh main (FULL 11 module + dbo single + Workflow V2 enum +5 + chunk per-module Plan riêng). **S33 priority spawn em pre-flight Plan G-H1 Hồ sơ NS** audit NamGroup TblNhanVien* 8 bảng + map fields → SOL EmployeeProfile schema (Mig 34 design 1 main + 5 satellite WorkHistory/Education/FamilyRelation/Skill/Document) — scope narrower 30 phút mục tiêu. **Curate Plan A3:** MEMORY archived 4 verbose entries q2 (S25 t1 5Q audit Bug Changelog + S26 Plan AG 5Q + S26 Plan AI RAG research + Plan B Contract V2 Q1-Q5 audit detail) → 27.7→19KB. **Pending tasks anh main S33 SendMessage gọi em:** (a) Plan G-H1 pre-flight NamGroup TblNhanVien* audit (PRIORITY HIGH first thing S33); (b) Plan B-Wrap test bundle pre-flight verify ContractWorkflowService ApproveV2Async test scenarios spec D-Bis trong migration-todos; (c) Phase 9 UAT smoke verify V2 contract create flow post-S29 deploy `QT-HD-V2-001` workflow. Token cost wrap ~5K. Tag: `[wrap, phase-9-to-phase-10, infra]`.
|
||||
|
||||
- **2026-05-26 (S32 startup — em main proxy verify context + S31 RAG v1.3 baseline awareness):** S31 đóng ~1.5h ngày 2026-05-26 với RAG v1.3 baseline PASS recall@5=1.000 (11/11 queries) + avg_rerank=0.847. **Root cause S31 fix:** `AI_INFRA/claude-rag/lib/retrieval.py` xài API cũ `qdrant.search()` đã bị qdrant-client 1.18 xóa → đổi sang `query_points().points` API mới. **Gotcha #52 NEW** add vào `docs/gotchas.md` (Qdrant search removed). **Downstream impact:** MCP tools `mcp__rag-unified__search_memory` + `mcp__rag-unified__cross_project_search` live PASS post-CLI restart — test query "gotcha 52 qdrant search removed" top_k=3 trả 3 chunks rerank scores 0.515 / 0.479 / 0.461 (all dưới threshold 0.7 cao mong đợi vì query về symbol `qdrant.search` chỉ match doc rag-setup-plan.md historical, KHÔNG match gotcha #52 doc — doc chưa indexed lần re-index gần nhất hoặc chưa ingest gotchas folder). **Memory size 25.8 KB ĐÃ VƯỢT curate trigger 25KB** — em append entry này + flag em main curate cuối S32 (archive S25 + S26 verbose entries → `archive/2026-05-q2.md`). **Pending tasks anh có thể spawn em qua SendMessage:** (a) Plan B-Wrap test bundle BW1-BW7 (regression ApproveV2Async Contract V2 + ApplicableType=3 validate), (b) Phase 9 UAT audit Contract V2 wire prod usage (V1 7 contract + V2 sample `QT-HD-V2-001` smoke verify), (c) gotcha #52 doc verify trong RAG index (cross-check `docs/gotchas.md` đã re-ingest sau S31 fix chưa). **State delta S29 → S32:** 30 mig → 33 mig (Plan B Contract V2 Mig 32+33 + Plan CA role CatalogManager) · 59 → 60 tables · ~146 → ~148 endpoints · gotcha 47/48 → 52 (+4 #49 Plan B + #50 Plan CA INFRASTRUCTURE seed gate + #51 + #52 Qdrant) · 111 test PASS UNCHANGED (UAT defer test-after) · 23 → 25 memory user-level. Token cost spawn này ~10K.
|
||||
|
||||
- **2026-05-22 (S29 wrap — Plan CA + Plan B pre-flight 2 spawns + 3 patterns NEW):** S29 close 2 big plans cumulative. **Plan CA (Move Cấu hình danh mục admin → eoffice)** 7 commits `06a441c..6eec8d7` push deployed Run #229+#230 PASS. **Plan B (Contract V2 wire mirror PE V2 pattern Mig 22-26)** 11 commits `58898e8..38f1c4d` push deployed Run #231+#232 PASS. **Investigator role 2 spawn:** (1) **Plan CA pre-flight audit** (agentId a7ab5576c77ee3730, ~15K token): map 9 menu danh mục terrain + GOTCHA tree-inherit Catalogs↔Master + recommend chunk structure A/B/C/D. fe-user component parity verified (DataTable + PageHeader + PermissionGuard + 6 shadcn ui). DbInitializer SeedAdminPermissionsAsync admin role grant CRUD 27 menu key. Permission Matrix dynamic load /api/menus → tự reflect post-move. (2) **Plan B pre-flight audit Contract V1 state** (agentId abf91b30391fb0cdb, ~25K token): map `Contract.cs` 25 fields (V1 only) + `ContractPhase` enum 12 values (TraLai=98 + TuChoi=99 ready) + `ContractWorkflowService.cs` 220 LOC V1 only + sqlcmd prod 7 V1 contract (Phase 2-8 active workflow) + PE Mig 22-26 reference templates + impact assessment (COEXIST V1+V2, KHÔNG drop V1) + re-chunk 6 chunks (split A → A1 entity + A2 mig). 3 surprise: ApprovalWorkflows Prod ZERO ApplicableType=3 (Chunk A2 must seed sample) + `RejectedAtStepIndex` drift deprecated + ContractType 7 variants generic ApplicableType=3. **Patterns proven NEW Investigator perspective S29:** (a) **9-menu permission terrain map pattern** (Plan CA) — Investigator inventory file paths + line ranges + component parity check + recommend chunk before delegate Implementer. ROI cao. (b) **V1+V2 coexist boundary** (Plan B) — KHÔNG drop V1 vì 7 prod contract pinned. Mirror PE Mig 22-24 spec. (c) **Reference template paths cross-module mirror** (PE → Contract V2): Investigator cite EXACT line ranges (PE Mig 23:14-31, Mig 24:14-17, Mig 26 UNIQUE composite, Service ApproveV2Async 446-634, 519-546 UPSERT, 774-783 ResolveActor) → em main + Implementer chỉ cần mirror rename entity. ROI rất cao saving 30%+ time. **Anti-patterns observed:** (a) Investigator KHÔNG verify endpoint exists end-to-end qua live curl — defer to CICD Monitor stage 4. (b) Investigator output sometimes verbose >700 words → em main hỏi cô đọng <500 next time.
|
||||
|
||||
Reference in New Issue
Block a user